Post Job Free
Sign in

Engineer Power Plant

Location:
Abu Dhabi, Abu Dhabi Emirate, United Arab Emirates
Posted:
March 12, 2020

Contact this candidate

Resume:

*.Qualification

B.E. in Civil Engineering (Full Time)

2.Name of the Candidate

MAHESH KUMBLE

3.Years of Experience

** ***** *** ** ******

4.Gulf experience

* *****

5.Mobile number

+919********* (WhatsApp), +971-********* (UAE)

6.Date of Birth

14th July 1977

7.Nationality

Indian

8.E-mail

*************@*****.***

9.Current Location

Abu Dhabi

10.Passport No.

N6718493 Valid up to :31-01-2026

11.Education:

●B.E. (Bachelor in Civil Engineering) from University B.D.T. College of Engineering, Davangere, Karnataka in 2004

12.Apostil/Attestation

●Sultanate of Oman

●United Arab Emirates

13.Other Trainings/License :

●Scaffolding Inspection

●Auto CAD

●Driving License issued at Sultanate of Oman

14.Countries of work Experience: India, Sultanate of Oman

15.Languages:

Language

Speaking

Reading

Writing

Reference

Excellent

Good

Poor

English

Excellent

Excellent

Excellent

Hindi

Excellent

Excellent

Good

Malayalam

Good

Good

Poor

Kannada

Excellent

Excellent

Excellent

Tamil

Excellent

Poor

Poor

Arabic

Good

Poor

Poor

16.Employment record:

From: Mar 2019 To: January 2020

Client/Employer: TECHNOFLOW CONSTRUCTIONS PVT LTD., MUMBAI

Positions held: Deputy Manager (Projects)

From: Dec 2016 To: February 2019

Client/Employer: TOWELL INFRASTRUCTURE PROJECTS COMPANY LLC.

Positions held: Sr. Project Engineer

From: March 2011 To: August 2016

Client/Employer: SIMPLEX Infrastructure Pvt. Ltd

Positions held: Project Engineer

From: Jan2006 To: February 2011

Client/Employer: ESSDEE Infrastructure Pvt.Ltd.

Positions held: Senior Project Engineer

From: April 2003 To: Dec 2005

Client/Employer: Hexagon Engineers Ltd.

Positions held: Site Engineer (Civil)

Detailed Tasks Assigned

17.Experience Record :

Detailed Tasks Assigned

Details Work Executed, Time period and The position held during the Work

Name of Assignment / job or project:

Continuous Nitration Plant, Pipe Raker

Year

11/03/2019 – Till Date

Location

Vapi, GIDC, Gujarat

Client

Aarti Industries Ltd, Vapi GIDC Gujarat

Main project features

The project has the following features

●All Civil Works and MEP works at Continuous Nitration Plant

●Pipe rack Foundation works for the Chemical Plant DCBH for the same chemical Plant

●Providing structural work in belt flaker

Name of Assignment / job or project:

Water Pipe Line Project,Elevated water Tower, Ground reservoirs under water distribution Network in Bawsher Wilayat of Muscat

Year

11/12/2016 – 21/01/2019

Location

Sultanate of Oman

Client

Public Authority of Electricity & Water, Sultanate of Oman

Main project features

The project has the following features

●Elevated tower of 35meter height and of c capacity 1500Cum near the Sea shore of Muscat city by providing the shoring around the foundations to prevent any seepage of sea water into the foundation. Structural platforms and staircase, waterproofing, tiling and painting works including asphalt road for the access.

●Ground reservoir of 2000 Cum capacity on the river banks (wadi) with insuwrap waterproofing, including compound wall yard piping, yard chambers

●Pump room, Control Building and Tanker Filling Station with complete Pipe line arrangements.

●Flow meter, Butterfly, Air valve, Washout, gate valve chamber for the pipe line

●Tanker filling stations including the inside hard standing area.

●Laying of pipe lines of various dia of HDPE & DI as per the profile including thrust boring and encasing with concrete in Wadi area

●Preparation of profile of the pipe line in accordance with Survey Sheet.

Position Held

Sr. Project Engineer

Activities Performed

Responsible for Preparation of Drawing with reference to the tender drawings and specification, Planning schedule for the works, Approval of Material from the consultant and the client, Procuring materials prior to the execution, Execution of the work as per the shop drawing, Specification and Safety.

Name of Assignment / job or project:

Construction of structural works under IL&FS Tamil Nadu Power Corporation LTD at Cuddalore Paringipettei Port.

Year

12/04/2012 – 30/07/2016

Location

Tamil Nadu

Client

Tamil Nadu Power Corporation LTD

Main project features

The project includes the following features

●Demineralization & Desalination plant, various water based structures such as comprehensive pump house, flocculate sedimentation tank, acid alkali storage tank, sea water intake tank and construction of pump house in sea shore and sea water desalination tank etc.

●All the structure on the shores of the sea are executed by means of the foundation work until the backfilling are carried out by war footing basis by continues drain out of water from excavation to backfilling. Sandbags along with reinforcement are used to prevent the collapse of sides

●Induced Draft Cooling Tower Construction

Position Held

Project Engineer

Activities Performed

Responsibility to execute given structure such as checking drawing, resource Management getting checked by the consultant, maintain quality and safety at site.

Name of Assignment / job or project:

Construction of DGEN 1200MW mega power plant (Gas Based) project

Year

11/03/2011 –11/04/2012

Location

Gujarat

Client

Torrent Power Limited

Main project features

●Construction of Cast-in-situ piles of 600mm dia of various lengths for all the structures in gas based power plant.

●Sheet piling, Anchored piling, contagious piling.

●Special foundations for the various structures in the power plant project such as laboratory building, HVAC systems etc.

●Foundation for TG and Boiler.

●Control Building and foundation for switch yard.

●Industrial Roads up to WMM, including Drains and culverts.

●Cable shaft pits and pull pits.

●Foundation Structure for Gas & water Pipe lines.

●Valve pits for firefighting pipes, process water pipes. Manholes and C.I.pipe distribution all around the power plant.

Position Held

Project Engineer

Activities Performed

Responsibility to execute given structure such as checking drawing, resource Management getting checked by the Client, maintain quality and safety at site.

Name of Assignment / job or project:

Construction of Jetty at ISPAT Steel Industry an Offshore Project Jetty Dharamtar Port near Alibaugh.

Year

02/03/2008 – 24/02/2011

Location

Maharashtra

Client

ISPAT INDUSTRIES LIMITED

Main project features

The project involves the following features

●Main Jetty of 200m Length and width 24m

●Approach Jetty of length 40m.

●Marine Piles of 800mm and 1200mm Dia with permanent liner plates of 8mm thick.

●Boring for Piles using Pre-fabricated steel Gantry of 90MT.

●Manufacturing Pre cast Beams; Pre cast Pile caps, Pre Cast slabs and its installations.

●Pile foundations for extended structures

Position Held

Sr. Project Engineer

Activities Performed

Responsible for the Survey activity done by Jr. Engineers and Surveyor, Resource management, getting checked by the client before some major activities . Periodical gantry checking by the Mechanical Team. Sub-Contractors bill etc., Taking regular reports from Jr Engineers and foreman

Name of Assignment / job or project:

Construction works for the Customs at Dharamtar Port at ISPAT Jetty

Year

05/08/2010 –01/10/2010

Location

Maharashtra

Client

Central Board of Excise and Customs, Mumbai

Main project features

The project includes

●Construction of carpet area of about 250Sqm;

●Water proofing works.

●Aluminums partition walls.

Position Held

Sr. Project Engineer

Activities Performed

Monitoring the entire work of the custom building by selection of material getting approval from the client and checking with the client when execute a major work.

Name of Assignment / job or project:

Construction of 200 Bedded Apple Hospital structural work including pile foundation and pile cap Kolhapur

Year

03/04/2007 – 01/03/2008

Location

Maharashtra

Client

APPLE HOSPITALS PVT LTD

Main project features

The project has the following features

●Type of Pile: Cast-in-Situ Piles

●Method of Boring : DMC

●Method of Concreting : Tremie Pipe concreting 2 Cooling tower

●Column beam structure and Roof slab,with Ram and staircase

Position Held

Sr. Project Engineer

Activities Performed

Project in charge for the entire project up to 5 floors all concrete structural works. Complete Management level work with 3 Engineers working under project. Execution of pile and pile caps by checking with consultant and client bore depth and all reinforcement etc. Material management, budget cash flow etc

Name of Assignment / job or project:

Sabarmati River Front Project Ahmadabad

Year

01/09/2006-02/04/2007

Location

Gujarat

Client

AHEMEDABAD MUNCIPAL CORPORATION

Main project features

The project includes Construction of 60cm thick Diaphragm wall along the river Sabarmati.

●Length of the Diaphragm wall: 1320M

●Method for adhere line surface: Bentonite Solution.

●Method of Concreting : Tremie Pipe concreting.

Position Held

Sr. Project Engineer

Activities Performed

Responsible for entire 2KM stretch up to ground level including guide wall and diaphragm wall by monitoring the entire team comprises of engineers and foremans, managing day to day activities and getting approved by the client, equipment and labour management etc

Name of Assignment / job or project:

Construction of SBR and Water treatment plant

Year

24/06/2006-31/08/2006

Location

Maharashtra

Client

NAVI MUMBAI SPECIAL ECONOMIC ZONE LTD

Main project features

The Project involves Construction of SBR and Water treatment plant including the provision of cast-in situ pile foundation,

●Provision of micro piles for the waste water tank.

●Provision of Cast-in-situ tank for SBR of dia 500mm

●Construction of Tank of 8m X 25m

Position Held

Sr. Project Engineer

Activities Performed

Monitoring the entire Civil Activities that is under this project getting approval from the client and checking with the client when execute a major work.

Name of Assignment / job or project:

Construction of G+11 residential building for, Central PWD in Soon Mumbai, all works excluding landscaping.

Year

14/01/2006- 23/06/2006

Location

Mumbai

Client

CENTRAL PUBLIC WORKS DEPARTMENT, MUMBAI DIVISION

Main project features

The project includes Construction of pre-cast pile foundation for G+11 building for, Central PWD, Type-IV Quarters including the Pile cap for 4 Buildings.

●Type of Pile: Pre-cast Piles

●Method of Boring : Liner Piles

●Pile Size: Bored precast PILES OF 500mm and 450mm dia

●Plinth Area: 35m X 16 M

●Column beam structure

●Shear wall up to 2.2m wide

●Fire refuge area at 8th floor

Position Held

Sr. Project Engineer

Activities Performed

Responsibility to execute Pile foundation including pile cap by checking drawing, resource Management getting checked by the consultant, maintain quality and safety at site.

Name of Assignment / job or project:

Construction of Bridge across River Madriki

Year

04/06/2004- 24/12/2005

Location

Karnataka

Client

Public Works Department, Govt of Karnataka

Main project features

The project includes the following features

●Length : 100m carriageway, 10m width (Max)

●Foundation: Open Foundation (Controlled blasting of the Rocks)

●Superstructure: Pre-stressed (Post tensioned) Cast-in-situ Box Girder.

●Execution: Bridge was across the river Madriki and the open foundation for the same was constructed using cofferdam for the piers. Epoxy coated reinforcement used for the entire structure

Position Held

Site Engineer

Activities Performed

Responsible for preparing the Bar bending schedule for the structure, execution of the work by supervising the skilled labors. Checking with consultants before all the pours by preparing pour card and raising RFI. This Work is done along with the Road work.

Name of Assignment / job or project:

Upgradation of State Highway from Hattigudur to Jevargi (Karnataka)

Year

04/06/2004- 24/12/2005

Location

Gulbarga District Karnataka

Client

Karnataka State Highway

Main project features

The project involves Upgradation of State Highway from Hattigudur to Jevargi of Length 12.5KM & 13m Width

Position Held

Site Engineer

Activities Performed

Responsibility to checking levels of sub grade, sub base and WBM and checking testing for compaction by the consultant, maintain quality and safety at site. This work is done along with the Construction of Minor bridge.

18.Certification:

I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my qualifications, and my experience. I understand that any willful misstatement described herein may lead to my disqualification or dismissal, if engaged.

Date: 03-03-2020

Place: Abu Dhabi

MAHESH KUMBLE



Contact this candidate