CURRICULAM VITAE
Email id: adb9e1@r.postjobfree.com 18th Street,
Muthamizh Nagar
adb9e1@r.postjobfree.com Kodungaiyur,
Chennai -600 118.
Mobile: 984*******.
OBJECTIVE:
To put the best of my efforts in the task entrusted to me with sincerity and determination under highly competitive and challenging environment.
PERSONAL PROFILE:
Name : G.Murali
Date of Birth : 17th Sep1986
Sex : Male
Nationality : Indian
Marital status : Single
Father’s Name : E. Govindaraj
Proficiency in languages : English & Tamil (Speak, Read & Write)
Hobbies : Listening Music
General : Have clean habits and keep a good health
EDUCATIONAL QUALIFICATION:
EDUCATION
NAME OF SCHOOL/ COLLEGE
YEAR OF
PASSING
% OF
MARKS
S.S.L.C.
St.Joseph’s Hr.Sec School
2002
87%
Diploma in Mechanical Engineering
Chengalvaraya Naicker Polytecnic College, Vepery
2005
66.33%
B.E Mechanical Engineering
Sathyabhama university
J.P.R Nagar Chennai
2014
74%
Project : 5 STAGE IN-LINE CALCINER PREHEATER
Customer : MADRAS CEMENT
Location : PREHEATER
Customer : JAYPEE BALAJI CEMENT
Location : Budawada Village, Jaggayyapet Mandal, Krishna District, A.P, India.
Duration : 2008-2009
Description:
It was a green project for 10000tpd production. This system was the combination of 12 vessels arranged in two strings; each string is of 6 vessels for hot gas & material separation & In-line calciner.
Position: Engineer
Project : 6 STAGE TWIN STRINGS IN-LINE CALCINER PREHEATER
Customer : ACC LIMITED
Location : P.O. Cementnagar, Dist Chandrapur, Maharashtra, India.
Duration : 2009
Description:
It was a green project for 7000tpd production. This system was the combination of 12 vessels arranged in two strings; each string is of 6 vessels for hot gas & material separation & In-line calciner.
Position: Engineer
Project : UPGRADING EXISTING 4 STAGES SINGLE STRING TO NEW 4 STAGE TWIN STRINGS IN-LINE CALCINER PREHEATER.
Customer : INDIA CEMENTS LTD
Location : Chilamkur, Kadapa District, Andhra Pradesh, India.
Duration : 2009-2010
Description:
It was a project upgrading existing 4 stage single string by introducing another string of 4 stages with in-line calciner for increasing the production from 2800TPD to 4500TPD. This new system was the combination of 8 vessels arranged in two strings; each string is of 4 vessels for hot gas & material separation & In-line calciner.
.Position: Engineer
Project : 6 STAGE TWIN STRINGS IN-LINE CALCINER PREHEATER
Customer : BIRLA CEMENT WORKS & CHANDERIA CEMENT WORKS
Location : Madhav Nagar, Sector-III, P.O.Cement Factory, Chanderia District.Chittorgarh, India.
Duration : 2010-2011
Description:
It was a green project for 5500tpd production. This system was the combination of 12 vessels arranged in two strings; each string is of 6 vessels for hot gas & material separation & In-line calciner.
Position: Engineer
Project : 5 STAGE IN-LINE CALCINER PREHEATER
Customer : VOTORANTIM CIMENTOS
Location : CUIBA, Ituacu&Primavera, Edealina, Rio Branco, Brazil.
Duration : 2012
Description:
It was a project of five plants in various location; three plants for 3000TPD, two plants for 5000TPD.This system was the combination of 5 vessels for hot gas & material separation & In-line calciner.
Position: Engineer
Project : 4 STAGE IN-LINE CALCINER WITH EXCESS AIR PREHEATER
Customer : CEMENTOS CRUZ AZUL LINE 7 WHITE CEMENT
Location : Mexio.
Duration : 2012-2013
Description:
It was a project upgrading existing preheater of 600 TPD for minimizing the dust in preheater outlet gas, pressure drop & better fuel combustion by the complete replacement of Stage 1 cyclone & the modification of lower most stage at above the cyclone cone. The existing SP preheater was converted as In–line calciner with excess air by introducing the calciner between the lower most cyclones & Kiln riser.This system was the combination of 4 vessels for hot gas & material separation & In-line calciner.
Position: Engineer
Project : 5 STAGE SEPARATE LINE CALCINER WITH DOWN DRAFT PREHEATER
Customer : EDO CEMENT
Location : American southwest-San Antonio
Duration : 2014
Description:
It was a project upgrading existing preheater of 2000 TPD for minimizing the dust in preheater outlet gas & pressure drop by the complete replacement of Stage 1 cyclone & the modification of
De-sox duct. This system was the combination of 4 vessels for hot gas & material separation, separate line calciner with down draft and De-sox duct.
Position: Senior Enginee
Project : 6 STAGE TWIN STRINGS IN-LINE CALCINER PREHEATER
Customer : EMAMI CEMENT LTD.,
Location : Balloda Bazar, Chhattisgarh, India..
Duration : 2014-2015
Description:
It was a green project for 9000tpd production. This system was the combination of 12 vessels arranged in two strings; each string is of 6 vessels for hot gas & material separation & In-line calciner.
Position: Senior Engineer
Project : 5 STAGE IN-LINE CALCINER PREHEATER
Customer : SHIVAM CEMENT
Location : Nepal
Duration : Sep-2015 to Jan-2016
Description:
It was a five stage balancing tower is designed for 800TPD along with existing ILC 5 stage tower operating at~1100TPD, to support the customer required 1900TPD, The existing kiln is retained and new CB cooler is designed for new balancing tower alone.
Position: Senior Engineer
Project : 5 STAGE SLC-D PREHEATER
Customer : CAMPANHIA DE CIMENTO DA PARAIBA-CCP
Location : COMPANHIA DE CIMENTO DA PARAIBA FAZENDA
Duration : Jan-2016 to Apr-2016
Description:
It was a project upgrading existing preheater of 4500 TPD The existing kiln is retained and new CB cooler is designed for new balancing tower alone.
Position: Engineer
Project : 5 STAGE IN-LINE CALCINER PREHEATER
Customer : FANCESA CAL ORCK’ O”
Location : SUCRE, BOLIVIA
Duration : Sep-2016 to MAR-2017
Description:
It was a five stage balancing tower is designed for 2100TPD 2-base Kiln new design burnerand clinker cooler.
Position: Senior Engineer
WORK EXPERIENCE:
1) Employer : Flsmidth Minerals Pvt. Ltd.,
Period of working : Nov-2008 – Till date.
Products : 1.Designing of Cement Plant Layout
2. Designing of Cement Plant Machinery Equipments
Position Held : Engineer (Grade-II)
Department : Engineering Pyro
Nature of work :
Preparing the Detail Engineering as per G.A Dwgs.
Preparing the B.O.Q.
Preparing the Check-list.
Documentation as per I.S.O.
2) Employer : Mill more Engineering Pvt. Ltd.,
Period of working : Aug-2007 to Aug-2008
Products : 1.Manufacturing of Paddy parboling & drying Plants
2. Manufacturing of Modern Rice Processing Machinery
Position Held : Design Engineer Trainee
Department : Design -Mechanical
Nature of work :
Preparing the Detail Engineering as per G.A Dwgs.
Preparing the B.O.M.
Preparing the Check-list.
Co-ordination between the Design-Office, & Workshop.
Documentation as per I.S.O
3) Employer : Enpro Engineering Pvt. Ltd.,
Period of working : Aug-2006 to Aug-2007
Products : Manufacturing of Busduct and Busbar
Position Held : Cad Designer
Department : Mechanical
Nature of work :
Preparing the Detail Engineering as per G.A Dwgs.
Preparing the B.O.M.
Preparing the Check-list.
Co-ordination between the Design-Office, & Workshop.
Documentation as per I.S.O
4). Employer : TVS Autolec Limited, Chennai – 602102.
Period of working : June – 2005 to June – 2006
Products : Manufacturing of Oil Pumps, & Water Pumps
Position Held : Machine Shop Supervisor
Department : Production
Nature of work :
Preparing the Process Chart
Inspection at all the levels
Preparing the documents as per I.S.O.
Co-ordination between all the sides, like, quality Office, Wendor, & Workshop
Supervising the Workshops
Skill Set & Tools Used:
Autocad-2004, 2006
Pro-e Wild fire-2.0
Solid works-2007, 2008
MS- Office
DECLARATION:
I hereby declare that all the above furnished details are true to the best of my knowledge
Date:
Place:
Chennai-118.
Yours Faithfully,
( G.Murali.)