Post Job Free

Resume

Sign in

Land Surveyor

Location:
Fereej Ibn Dirhem, Qatar
Salary:
QAR 10000
Posted:
March 13, 2020

Contact this candidate

Resume:

NOAH L. VILLARIASA

Address: #*** ***** **., ******, ******, Cebu, 6006, Philippines

E-mail : adb97b@r.postjobfree.com / adb97b@r.postjobfree.com

Philippine Mobile No. +63-949-***-****

Qatar Mobile no. +974******** / +974********

Position Desired: Land Surveyor

KEY QUALIFICATION

15 years of extensive experience in the site/Land Surveyor in various large and medium

Project which under take high rise buildings, roads and bridges, box culvert, pipe lines, pipe

Culvert and other roadway structures.

SKILLS

Know how to operate a total station like TOPCON229, LEICA TC 803, SOKKIA, NIKON,

TRIMBLE 5503 and M3Series, TRIMBLE and LEICA GPS/GNSS and all kinds of automatic levels. With basic AutoCAD and Civil3D.

EMPLOYMENT RECORD:

POSITION: LAND SURVEYOR 31 August 2014 up to 31 December 2019

LEIGHTON CONTRACTING QATAR (WLL)

P.O. Box 22478 Doha, Qatar Project Name: Construction of Al Mutahidah Tower

Project Cost: QAR 580 Million

Project Description: 25 Story residential towers with 480 apartment 2 parking levels and gross floor area of 160,500m2.

Project Name: GTC600/2013 Pipeline for Mega Reservoir Corridor Main1 Phase A&B

Project Cost: QAR 1.6 Billion

Project Description: 102 km. Pipeline Potable Water with 30 Wash-out Chambers and 16 Air Valve Chambers.

Project Name: Manateq-Qatar Economic Zone 3(Roads and Infrastructure Project)

Project Cost: QAR 660 Million

Project Description: 11 km main road with 6 km local roads and Utilities such as electrical duct and cable line, pipeline, potable, TSE and sewerage system.

DUTIES AND RESPONSIBILITIES:

Conduct basic calculations using field note data.

Read/Utilized and interpret design drawings.

Provide vertical and horizontal controls.

Supports field measurement and layout.

Study/Learn and interpret CAD computer applications.

Provide consistent and superior quality documents for survey.

Controls pipeline alignment and levels.

Setting-out limits of excavation.

Setting-out shuttering/formworks alignment and level

Setting out and Establish gridline for building columns, control vertical and horizontal alignments

Setting out column foundation corners and establish levels

As built different types structure of the buildings

Using Leica Total Station, Leica Automatic Level and GPS.

Prepares weekly and monthly reports.

POSITION: SURVEYOR

25 June 2012 to 1 April 2014

PRIVATE FIRM (Local)

Catmon, Cebu, Philippines

DUTIES AND RESPONSIBILITIES:

Perform duties related to Land Surveying for identifying land ownership and property boundaries.

Conducts records management activities and perform historical and legal ownership research.

Subdividing and locate boundaries of private land properties and assist to provide land title.

Using TOPCON 229 total station.

POSITION: LAND SURVEYOR

10 February 2008 to 14 June 2012

MIDMAC CONTRACTING CO. W.L.L.

P.O. Box 1758 Doha, Qatar

Project Name: New Doha International Airport (NDIA) Contract Package No. 14

Project Cost: QAR 1.5 Billion

Project Description: Airside/Landside/Roadways/Bridges and Parking

DUTIES AND RESPONSIBILITIES:

Conduct standard calculations to identify areas, elevations and volumes of field survey notes.

Develop and Inspect Land Surveying project contracts.

Interpret drawings and coordinates.

Provide horizontal and vertical controls.

Setting out center line, left and right of the road and establish road level.

Setting out drainage, pipeline, alignment and locations of head walls, ditches and establish level.

Setting out of location and alignment of the one thousand five hundred fifty four car parking shades foundation and establish levels.

Setting out and lay-out the seven (7) electrical sub-station buildings and levels.

Setting out the location of 21 bridges bored piles and establish levels.

Setting out the alignment of the MSE wall panel and levels.

Setting-out shuttering/formworks alignment and levels.

Control embankment layer by layer and control base preparation.

Using Trimble total station 5503 Series, Trimble GPS Series 5800 and wild automatic level.

POSITION: LAND SURVEYOR

5 December 2006 to 6 March 2007

TOYO CONSTRUCTION CO., LTD.

Ormoc City, Leyte, Philippines

Project Name: Rehabilitation and Enhancement of Ormoc Flood Mitigation Structure in Ormoc City Philippines.

DUTIES AND RESPONSIBILITIES:

Hydrographic survey and locate exact location of boreholes of seabed level.

Establish vertical controls and control the alignment of SSP pile driving of existing cargo berth.

Setting out horizontal alignment, cross sectioning establish vertical control and control excavation.

Setting out the alignment of retaining wall, reinforce concrete box culvert,

Gabions and establish levels and other survey works.

Using Sokkia Total Station and Nikon Automatic Levels.

POSITION: LAND SURVEYOR

8 April 2003 to 1 December 2006

HANJIN HEAVY INDUSTRIES AND CONSTRUCTION CO., LTD

Bulilis, Ubay, Bohol, Philippines

Project Name: BHIP II Irrigation Canal and Appurtenant Structures

Project Cost: PHP 1.2 Billion

Project Description: A ten kilometer (10km) concrete main canal with 55.7 km Lateral

Concrete canal, service roads and 800 meter diversion tunnel.

DUTIES AND RESPONSIBILITIES:

Studies specification to plan procedures for project on basis of starting and completion times and confers with direct foreman and sub-contractor engaged in planning and executing.

Work procedures interprets a job specification and coordinates various phases of construction to avoid delay.

Scheduling manpower and equipment.

Check preview contract drawing and coordinates with concerned authorities for

Joint establishment of horizontal and vertical clearance.

Setting out the centerline of the main canal, cross section and establish vertical controls.

Setting out the centerline of diversion tunnel, control excavation and establish level and other survey works.

POSITION: SURVEY INSTRUMENT MAN / FOREMAN

16 January 1995 to 12 May 1999

DONGSUNG CONSTRUCTION CO., LTD.

Catmon, Cebu, Philippines

Project Name: Restoration of Cebu North Road Project Contract Package Number 5

Project Description: A One Hundred Two Kilometer (102km) road with 47 km asphalt and

55 km PCCP and 33.5 km retaining walls

DUTIES AND RESPONSIBILITIES:

Setting-out shuttering/formworks alignment and levels.

Earthworks scheduling the heavy equipment activity every day.

Setting out centerline of the road and cross sectioning.

Establish vertical controls, control base preparation and control string line elevation for road concrete pouring.

Plotting of cross section (office works).

Supervised installation of grouted riprap, stone masonry retaining wall, concrete

retaining wall, installation of RCBC/RCPC and other survey works.

EDUCATIONAL BACKGROUND

College: CENTRAL MINDANAO UNIVERSITY 1990 – 1994

Musuan Bukidnon

Course: BS Civil Engineering

High School : KIBURIAO NATIONAL HIGH SCHOOL 1985 – 1990

Kiburiao, Quezon, Bukidnon

Elementary : KIBURIAO ELEMENTARY SCHOOL 1979 – 1985

Kiburiao, Quezon, Bukidnon

PERSONAL INFORMATION

Age : 47 years old

Date of Birth : December 27, 1972

Gender : Male

Citizenship : Filipino

Height : 5’5” (1.651m)

Weight : 72kgs. (158.73lbs)

Civil Status : Married

Religion : Roman Catholic

Languages : English, Filipino and Cebuano

Passport No. : EB9998850

I deliberately signify that the above information is true and correct as to the best of my knowledge.

NOAH L. VILLARIASA

Applicant



Contact this candidate