Post Job Free

Resume

Sign in

Electrical Engineer Manager

Location:
Hyderabad, Telangana, India
Posted:
March 08, 2020

Contact this candidate

Resume:

PILYANAM RAMAKRISHNA

Dr No *-**, Peddanapalli Village, Yeleswaram Mandal, East Godavari District, Andhra Pradesh 533431

Contact: +91-903******* Email: adb7h1@r.postjobfree.com

Electrical Engineer - Erection, Installation,Commissioning and Maintenance

Seeking challenging and rewarding assignments across the industry

Profile

Competent, diligent and result oriented Electrical Engineer offering 6.7 years of experience across the Erection, Installation & Commissioning Activities, Site Management, Project Execution, Team Management and maintenance.

Proven competencies in implementing preventive, planned and predictive maintenance schedules to maximize uptime of equipment’s. Capable of conducting root cause analysis of failures and devising breakdown solutions with minimum turnaround time.

Exceptional capabilities in executing technically challenging projects, within defined time/cost parameters; Excellent analytical and conflict resolving skills with managerial strengths in synchronizing team efforts to catalyze work execution to specified quality standards.

Adept in ensuring Safety and observing physical conditions of work & work practices; adequate understanding in the areas of Work Place Safety, Process Safety Management & Safety Assessment.

Personal and outgoing with strong capabilities in fostering an atmosphere that motivates highly talented professionals to balance high-level skills with maximum productivity,

Core Competencies:

Project Planning & Execution ~ Erection, Installation & Commissioning ~ Operations & Maintenance ~ Technical Support ~ Strategic / Resource Management ~ Quality Management ~ Man Management ~ Process Operations ~ Resource Optimization ~ Site Management ~ Safety ~ Operational & Maintenance Efficiencies

Professional Experience

Previous Experience:

1. Worked in contract Sri Sai Shiva Ganga Electrical Works associated with Dr.Reddy’s labs (unit-5)

Period : Sep 2013 – July 2015

Designation : Site Engineer (Projects)

2. Worked in Aurobindo Pharma Limited (unit-11)

Period : Aug 2015 – Dec 2018

Designation : Executive Enginner (Maintenance)

3.Present Experience:

Working in Piramal enterprises limited (unit-3)

Period : Dec 2018 – Present

Designation : Executive (Projects & Maintenance)

Electrical project and maintenance Engineer

Defining the scope of projects while contributing to the project as the project architect and the areas of cost efficiency, time management & manpower planning for the project execution.

Initiating planning, execution, tracking / monitoring, controlling and completed the project as scheduled and implemented operational processes for increased efficiency.

Formulating operational strategies for the quality function by carrying out long term and short term quality planning in line with the organization requirements, ensuring proper facilities across the units for smooth operations.

Handling end to end execution of the design engineering projects and carried out detailed planning and scheduling to ensure execution of projects as per the defined technical & functional specifications and within budgetary parameters.

Witnessing testing & commissioning, recording and maintaining of commissioning results and reports and ensured the installed equipment’s were performed accurately after final start-up.

Reviewing as built drawings, operation and maintenance manuals; organized operation and maintenance training to end users with equipment/system vendors.

Supervising all site activities including providing technical inputs for methodologies of installation and commissioning of Electrical Equipment & Systems with site management activities

Conducting the preventive maintenance as per the schedules and maintaining the documents as per CGMP ready for any time audit.

Preparing the Root cause analysis and defining the corrective & preventive actions for breakdowns.

Conducting the Predictive maintenance for the condition monitoring of the Electrical Equipments and preparing the reports.

Preparing the monthly consumption reports and check for the scope of the energy conservation activities monthly.

Conducting the Electrical safety awareness trainings for the technicians.

Maintaining the critical spares by raising the PRs and following up with vendors the supply of them.

Involving in Trouble shooting activities to reduce the breakdown time.

Projects &Maintanace (Site Execution):

SUB STATIONS: Erection, Commissioning, operation & maintenance of Outdoor substations 33kV/415V.

TRANSFORMERS:

Erection, Testing, Operation & maintenance.

Distribution Transformers 132KV/11kv 20MVA, 11kV/0.440kV up to 2.5MVA, 33KV/440V 2MVA.

PANELS:

Erection, Testing, & Trouble shooting

LT Boards PMCC’S, PCC’S& MCC’S 440V.

MOTORS: Erection, Installation & Testing of LT Motors up to 200 KW make ABB, CG, SIEMENS, and BBL & SIEMENS for various applications.

Academia

BTech (EEE); Kakinada Institute Of Engineering And Technology, Korangi; 2013; 74.13%

12th; Minerva Junior College, Prathipadu; 2009; 94.7%

10th; Minerva Junior College, Prathipadu; 2007; 86.3%

Personal Dossier

Date of Birth: 1st Aug 1992 Languages Known: English, Hindi, Telugu References: Available on request

ANNEXURE

1.Clients

Dr Reddy labs

Responsibilities

Preparation and implementation of activity Schedule as per erection priority & front availability.

Review/ report to project manager the actual work with the activity schedule and to initiate corrective action wherever necessary.

Description

Erection & commissioning “Auxiliary Power Distribution Boards, Illumination of Plant Area.”

Location

Peddadevulapalli

Duration

3 months

Team Size

5 members

Clients

Dr Reddy labs

Responsibilities

Assist/ supervise of erection and commissioning works to ensure all the Safety Environment and Health Standards measures are taken by the workmen.

Estimating the material requirement for carried out job & calculating match material front & constraint effected front.

Description

Erection & commissioning of 6 LT panels

Replacing the old outdated LT panels

Location

Peddadevulapalli

Duration

4-year

Team Size

10 members

2.Clients

Dr Reddy labs

Responsibilities

Preparation and implementation of activity Schedule as per erection priority & front availability.

Review/ report to project manager the actual work with the activity schedule and to initiate corrective action wherever necessary.

Description

Strengthening of rain water recycling system in the water

Location

Peddadevulapalli

Duration

3-months

Team Size

6 members

3.Project

Erection,Commissioning and testing of all pharma Equipments in N-block module-03 in Aurobindo unit-11

Responsibilities

Preparation and implementation of activity Schedule as per erection priority & front availability.

Review/ report to project manager the actual work with the activity schedule and to initiate corrective action wherever necessary.

Description

Installation of operating panels (VFD panel, PLC panel and breaking resister panel) for centrifuge,Reactors, Vaccuum pumps,anfds, blendor,microniser,powder processing unit etc on proper platform provided in the PCC room.

Installation of flp HMI in the field as per easy operation for the end user.

Commissioned, tested and ensured that the installed equipment’s were performed accurately after final start-up.

Reviewed as built drawings, operation and maintenance manuals; organized operation and maintenance training to end users with equipment/system vendors.

Location

Pydibhimavaram

Duration

6-months

Team Size

4 members

4.Project

Erection,Commissioning and testing of Imported(Germany)UVlamp control panel.

Responsibilities

Preparation and implementation of activity Schedule as per erection priority & front availability by initiating the change control.

Review/ report to project manager the actual work with the activity schedule and to initiate corrective action wherever necessary.

Description

Installation of Panel with all the parameters set in to the HMI.

Installation of the UV Lamp 10KW in the reactor.

Commissioned, tested and ensured that the installed equipment’s were performed accurately with the necessary qualification documents like URS,DQ,FRS,IQ,OQ and PQ .

Reviewed as built drawings, operation and maintenance manuals; organized operation and maintenance training to end users with equipment/system vendors.

Location

Piramal Enterprises limited, digwal.

Duration

1-months

Team Size

2 members

5.Project

Erection,Commissioning and testing of Digital clocks in the site.

Responsibilities

Preparation and implementation of activity Schedule as per erection priority & front availability by initiating the change control.

Review/ report to project manager the actual work with the activity schedule and to initiate corrective action wherever necessary.

Description

Installation of digital clocks at the areas listed in the change control.

Commissioned, tested and ensured that the installed equipment’s were performed accurately with the necessary qualification documents like URS,DQ,FRS,IQ,OQ and PQ .

Reviewed as built drawings, operation and maintenance manuals; organized operation and maintenance training to end users with equipment/system vendors.

Location

Piramal Enterprises limited, digwal.

Duration

2-months

Team Size

3 members

Expertise In:

Industrial power distribution jobs as an Engineer Electrical & Planning, looking after Projects, Execution, Preventive and Breakdown maintenance at site and utility equipment.

Planning & Scheduling total site activities to complete the project in time.

Co-ordination, Planning, Erection/ Installation, Testing of LT Switchgear/ Control Panels, MCC panels and operation of DOL, RDOL, STAR/DELTA,SOFT Starters &Transformers, HT/ LT Motors, Supervision of HT/ LT Cable Laying – Underground/ Tray, Bulk material handling systems of conveyors (Hoist),industrial lighting & Maintenance of Construction Power supply of site electrical systems etc.

Erection, Testing & Commissioning of Total Electrical System related to pharmaceutical plant.



Contact this candidate