Post Job Free

Resume

Sign in

Project Civil Engineering

Location:
Fereej Ibn Dirhem, Qatar
Posted:
March 06, 2020

Contact this candidate

Resume:

JUNE S. ESCANDER

Blk ** Lot ** Manchester Phase *1, Brgy Pasong Camacille 1

Gen. Trias, Cavite, PHILIPPINES

Cell # +974******** (Qatar)

Cell # 639*********(Philippines)

Email: adb52q@r.postjobfree.com

APPLYING POSITION: SR. LAND SURVEYOR/ LAND SURVEYOR CAREER OBJECTIVE:

To acquire a position in a firm where I can utilize my experience as a land surveyor to be a strong asset. ACADEMIC BACKGROUND:

Bachelor of Science in CIVIL ENGINEERING (May 1991) LYCEUM of the PHILIPPINES

Intramuros, Manila, Philippines

WORK EXPERIENCED:

Company : LEIGHTON CONTRACTING QATAR (Habtoor Leighton Group}

: P.O Box 22478, DOHA QATAR

Designation : Land / Office Surveyor

Inclusive Date : Aug. 14, 2016 – Dec. 31, 2019

Description of Work:

• Responsible for all survey activities in the project.

• Re-run/Established of horizontal and vertical control points of the project.

• Checking and verification of existing and survey plan

• Plan, coordinate and supervise the work of several field survey crews.

• Keep detailed and accurate records of crew activities, survey data.

• Coordinating with the engineering and architectural personnel, clients, and others concerned with project.

• Preserved and maintain all the documents and survey data for the project.

• Maintaining equipment in proper condition and perform frequent calibration check.

• Attends inspection works with client and QC inspector checking position, centerline, elevation, dimension and verticality of structure foundation prior to final acceptance.

• Prepared RFIT’s for type of works such as (Treated Sewage Effluent pipeline, water system, electricity, street lighting, irrigation and drainage system, roads and etc.)

• Prepared accomplishment report.

Project involve:

Construction of Roads and Infrastructure

Um Al Houl Economic Zone QEZ-3 (Package 3.12A and 3.1B) Client: UM AL HOUL

SPECIAL ECONOMIC ZONE, BY MANATEQ

AL HOUL Client: UM

Aug. 14, 2016 – Dec. 2019

Company : BONG KYUNG CONSTRUCTION CO. LTD

: P.O Box 44371, Jeddah 21581 K.S. A

Designation : Land Surveyor/ Sr. Land Surveyor

Inclusive Date : May 18, 2014 – May 20, 2016

Description of Work:

• Responsible for all survey activities in the project.

• Re-run/Established of horizontal and vertical control points of the project.

• Checking and verification of existing and survey plan

• Plan, coordinate and supervise the work of several field survey crews.

• Instruct survey crews in the field layout of the more difficult construction projects, in replacing lost survey monuments, in setting property corners in city land from legal descriptions and title information and in performing other aspect of survey work.

• Keep detailed and accurate records of crew activities, survey data.

• Prepared RFIT’s for type of works such as ( Formation, Blinding, Foundation, Footing, Column and Etc.)

• Coordinating with the engineering and architectural personnel, clients, and others concerned with project.

• Preserved and maintain all the documents and survey data for the project.

• Work with contractors in providing survey data for expediting construction projects.

• Maintaining equipment in proper condition and perform frequent calibration check.

• Set out of placing of re-bars and formworks construction for rigidity and adequacy to support load and to ensure that the completed structures conforms to the lines and grades shown in the approved plans.

• Attends inspection works with client and QC inspector checking position, centerline, elevation, dimension and verticality of structure foundation prior to final acceptance.

• Prepared accomplishment report.

Project involve:

Construction of RC Public Housing Phase 7(4-Bedroom single Villa) Hai Al Jar, Harah 01 Yanbu, K.S.A.

Client: Royal Commission

May 18, 2014 – May 20, 2016

Construction of Housing in Haii Al-Aziziah A Phase 1 (3- and 2-Bedroom Apartment) Haii Al-Aziziah A Phase 2 Yanbu, K.S.A.

Client: Royal Commission

April 01, 2015 – Nov. 30, 2015

Company : RIZZANI DE ECCHER-OHL-BOODAI-TREVI (Joint Venture)

: P.O Box 24081, Safat 13101, KUWAIT

Project : Construction, Completion and Maintenance of Roads, Overpass, Sanitary and Stormwater Drains as well as other Services for Jamal Abdul Nasser Street Designation : Land Surveyor

Inclusive Date : Mar. 20, 2013 – Dec. 31, 2013

Description of Work:

A.) Sub Structure:

• Responsible for all survey activities in the project.

• Re-run and Established horizontal and vertical control within the project.

• Setting out of bored pile, pile cap, column, plinth, pier head and x and y axis for bearing plate.

• Encoding of survey data in survey software.

• Coordinating with the engineering and architectural personnel, clients, and others concerned with project

• Preserved and maintain all the documents and survey data for the project.

• Maintaining equipment in proper condition and perform frequent calibration checks.

• Drafting 2-D maps of an area with the use of computer-aided design (CAD) & as built drawing of constructed structures such as center of bored pile, 4 corner of pile cap and pile cap and column.

B.) Super Structure

• Responsible for all survey activities in the project.

• Setting out location of scaffolding of diaphragm, wing wall, jack location and segment erection.

• As-built survey location and level of segment before and after erection.

• Encoding of survey data in survey software.

• Coordinating with the engineering and architectural personnel, clients and other concerned with project.

• Preserved and maintain all documents and survey data for the project. Company : HORIZON ARABIA GROUP W.L.L

: Office 27 – 28, 7th Floor Sh. Eid Bin Mohd

C-ring Road, Doha Qatar

Designation : Land Surveyor

Inclusive Date : Feb. 26, 2012 – Oct. 7, 2012

Description of Work:

• Responsible for all survey activities in the project.

• Re-run and Established horizontal and vertical control within the project.

• Checking and verification of existing and survey plan

• Setting out of lot boundary, raft area of basement 2 for excavation of foundation of column and slab.

• Computation of area and volume of cut for foundation of basement 2 level.

• Setting out of column, lift, fire lift, manhole, drainage, electrical and mechanical line layout. Encoding of survey data in survey software.

• Coordinating with the engineering and architectural personnel, clients and others concerned with project.

• Preserved and maintain all the documents and survey data for the project.

• Maintaining equipment in proper condition and perform frequent calibration checks.

• Computation of survey data; such as point of horizontal alignment, stationing, finish grade elevation, top level manhole drainage, electrical manhole etc.

• Drafting 2-D maps of an area with the use of computer-aided design (CAD) & as built-drawing of constructed structures such as drainage, column, lift, fire lift, manhole, drainage, electrical and mechanical line layout.

Project Involve:

Proposed HILTON HOTEL BUILDING

(2B + G + M + 4 Floor)

Client: SHEIKH FAISAL BIN QASSIM AL THANI

Al Nassher, Doha Qatar

Feb. 26 – Oct. 7, 2012

Propose COMMERCIAL & HOTEL APARTMENT-BUILDING

(2B + G + M + 7 Floor)

Client: Son of ABDULRAQEEB A Q AL-HILALI

Fereej Bin Mahmoud, Doha, Qatar

Jul. 21, 2012 – Oct. 7, 2012

Company : AL MABANI GENERAL CONTRACTOR CO.

: P.O. Box 2781 Jeddah 21461, K.S.A

Designation : Land Surveyor

Inclusive Date : May 21, 2009 – Nov. 25, 2011

Description of Work:

• Responsible for all survey activities in the project.

• Setting out the site using surveying instruments and global positioning system (GPS) to have graphic presentation of exact coordinates of the site features and create photogrametrics records.

• Setting out of Taxiway, Apron, Open Ditch, and other utilities such as (Deepcan, Electrical manhole and line, sewerage, and potable line and manhole and etc.)

• Computation of survey data on road work such as intersection, horizontal and vertical alignment stationing finish grade elevation.

• Computations of area and volume of cut and fill of sub-grade, sub-base, base course and asphalt.

• Drafting 2-D maps of an area with the use of computer-aided design (CAD).

• Preserved and maintain all the documents and survey data for the project.

• Maintaining equipment in proper condition and perform frequent calibration checks.

• Checking and verification of existing and survey plan. Project Involve:

KING ABDHULASIS INTERNATIONAL AIRPORT

Mass Earthworks Project

May 21, 2009 – Jan 31, 2011

KING ABDHULASIS INTERNATIONAL AIRPORT

(Phase 1)

Feb. 01, 2011 – Aug. 30, 2011

KING ABDHULASIS INTERNATIONAL AIRPORT

(Phase 2)

Sept. 01, 2011 – Nov. 25, 2011

Company : AL NABOODAH ENGINEERING (L.C.C)

: P.O. Box 33900 Diera, Dubai U.A. E

Designation : Surveyor

Inclusive Date : Jan. 25, 2008 – Feb. 22, 2009

Description of Work:

• Responsible for all survey activities in the project.

• Computation of survey data on road work such as intersection, horizontal and vertical alignment stationing finish grade elevation.

• Computation of area and volume of cut and fill of subgrade, sub-base, base course, and asphalt.

• Setting out of road alignment, simple curve, spiral curve, intersection point, Roundabout and services such as ( Sewerage system, water system, electricity, street lighting, irrigation and storm water drainage system and etc.)

• Maintaining equipment in proper condition and perform frequent calibration checks.

• Preserved and maintain all the documents and survey data for the project.

• Drafting 2-D charts and maps of an area with the use of computer-aided design (CAD) and other cartographic techniques.

• Checking and verification of existing and survey plan. Project Involve:

• DUBAI WORLD CENTRAL

Jebel Ali Airport

JXB1/ INF/ 103A

• STORM WATER DRAINAGE and

SEWERAGE SYSTEM

(Phase 1)

Jan. 2008 – Dec. 15, 2008

• AIRFIELD AND INFRASTRUCTURE

Contract No. JXB1/ INF/ 051

Roads and Infrastructure of the

Phase I Residential City

Dec 16, 2008 – Feb. 22, 2009

Company : AL SARH TRADING & CONTRACTING CO.W.L. L

: P.O. Box 1350, Doha Qatar

Designation : Surveyor

Inclusive Date : May 2005 – Sept. 2007

Description of Work:

• Responsible in all survey activities in the project.

• Computation of survey data on road work such as intersection, horizontal and vertical alignment stationing finish grade elevation.

• Computation of area and volume of cut and fill of sub-grade, sub-base, base course and asphalt.

• Setting out of road alignment, simple curve, spiral curve, intersection point, roundabout and services such as (Treated Sewage Effluent pipeline, water system, electricity, street lighting, irrigation and drainage system and etc.)

• Checking and verification of existing and survey plan.

• Run & establish vertical and horizontal control within the project.

• Maintaining equipment in proper condition and perform frequent calibration and checks.

• Preserved and maintain all documents and survey data for the project.

• Prepared as-built drawing of road, road alignment, elevation and all utilities done in project &

` drafting 2-D charts and maps of an area with the use of computer-aided design (CAD). Project Involve:

• ERC 1406/ D1/ C1

Re-construction of Al Khor Corniche Roade

Municipality of Al Khor

March 2006 – September 2007

• TMRM 2005 C1 Road Maintenance Zone 70-74

Al Dayeen Municipality (Al Khisa Road, Umm Salal Ali, Umm Garn) November 2005 – March 2006

• ABM Military Ground Parade

October 2005 – November 2005

• ERC 659 – RTW in Central Rayyan

May 2005 – October 2005

Company : D.M. WENCESLAO & ASSO. INC.

: 306 E. Rodriguez Sr. Blvd. Quezon City

Tel. # 712-44-94, 712-05-79, 712-05-9

Description of Work:

• Run horizontal and vertical control within the project.

• Computation and plotting of subdivided and consolidated of parcel of lot.

• Computation of survey data on road works; such as point of intersection, horizontal alignment, stationing, finish grade elevation, drainage, utilities, volume computation of cut and fill, etc.

• Checking and verification of survey plans.

• As-built drawing of constructed structures such as drainage, roads, line ditches, canals, etc.

• Conduct trigonometric, differential, profile leveling and cross sectioning.

• Responsible for all survey works, related to the project (Hydrographic, topographic, boundary, etc.)

• Responsible in recording daily work activities and accomplishment report.

• Plotting of survey data and volume computation of dredge fill.

• Encoding of survey data in survey software.

• Hydrographic survey of dredging area.

• Volume computation of dredge fills.

• Monitoring high and low tide base on tide table.

• Quantify volume of sub base, base coarse and asphalt materials needed to purchase.

• Setting-out boundary, relocation, and topographic, hydrographic survey.

• Layout pile driving position and responsible for the record and computation.

• Preserved and maintain all the documents and survey data for the project.

• Supervised work being done (formwork & scaffolding of beam and slab, re-bars & concreting.)

• Prepared Us-Built plan drawing of the project.

• Maintaining equipment in proper condition and perform frequent calibration checks. Project Involve:

Project : ASEANA BUSINESS PARK

Pres. Diosdado Macapagal Blvd. Construction

Pres, Diosdado Macapagal Bridge, Price Mart Building

(Blvd 2000, Asean Ave., Belle Ave., Bradco Ave.)

Baclaran, Parañaque

Designation : Surveyor/ Quantity Surveyor

Inclusive Date : May 2000 – May 2005

Project : Repair/Rehabilitation of Lucena Multi-Purpose Pier Dalahican, Lucena City

Designation : Surveyor/ Field Eng’r

Inclusive Date : February 1999 – May 2000

Project : CIUDAD NUEVO, RECLAMATION PROJECT

Caridad, Cavite City

Designation : Surveyor/ Field Eng’r

Inclusive Date : August 1992 – Feb. 1999

Project : Dredging/ Trenching

Pilipinas Shell Petroleum Company

Tabangao, Batangas City

Designation : Survey aide/ CE Aide.

Inclusive Date : March 1992 – August 1992

OTHER SKILLS :

Can operate personal computer (Microsoft Word/ Excel/ Auto CAD/ Auto Desk Civil 3D) and Xerox Copier. INSTRUMENTS HANDLED:

• GPS LEICA (VIVA GS10 Base and Rover)

•TOTAL STATION LEICA TS 06, TCR 1205 & TCR 805 & BUILDER 503,301

• TOTAL STATION TOP CON GTS 220, 721, 751

• NA720 AUTO LEVELS / AUTO LEVEL RUNNER 24 (LEICA)

• NIKON D50 & C100

• SOKKIA

• ECHO SOUNDER

PERSONAL INFORMATION:

Date of Birth : June 26, 1968

Place of Birth : Cubao, Quezon City

Citizenship : Filipino

Sex : Male

Civil Status : Married

Name of Wife : Leonida E. Escander

December 29, 1971

Name of Child : Warlon Jay E. Escander

September 12, 1993

: Airra Len E. Escander

March 16, 1999

: Katelyn Joy E. Escander

August 14, 2004

Father’s Name : Pablo D. Escander (Deceased)

Mother’s Name : Warlita S. Escander (Deceased)

CHARACTER REFERENCES:

Engr. BENEDICTO M. MENDOZA Jr.

Project Manager

D.M. Wenceslao & Asso. Inc.

Ciudad Nuevo, Cavite City

Engr. CHARLIE BALANGATAN

Project Superintendent

Leighton Contracting Qatar

Doha, Qatar

+974-********

Engr. EMMANUEL MOTEL Jr.

Owner/Managing Director of

KEACADD Bim & CAD Consultancy

Doha, Qatar

+974-****-****

I hereby certify that the above information here is true and correct. JUNE S. ESCANDER__

Applicant_



Contact this candidate