Post Job Free
Sign in

Manager Engineer

Location:
San Pedro, Laguna, Philippines
Posted:
March 03, 2020

Contact this candidate

Resume:

Mr. Wenceslao Agarao Mission “CV”

Contact. No. Mob. No. 094******** / 092******** : Res 02 88472105 : Email : adb39m@r.postjobfree.com Page 1 of 11

WENCESLAO AGARAO MISSION

Construction Manager / Project Manager /Site Manager / Projects coordinator Projects Consultant

Career Highlights:

Over Thirty Seven ( 37 ) years of experience in Construction & Project Management including supervision, Procurement-contract administration, QAQC Function’s & Total implementation of health – Safety & Environmental management in various types of Civil Engineering Projects; such as; Buildings, Sports Complex, Schools complex, Marine Projects – ( Ports, Mooring dock, Coastal Protection, QayWall, Jetty, Slipway, Intake/Brine Channels, Outfalls)

, Oil & Gas Projects, Industrial Projects, Substations, Desalination & Power Plants, ( Infra-Structure Projects – Roadworks, Drainage System, Sewerage system and Water reatment, Water distribution networks, Communication

& power networks, Gas distribution networks’, Irrigation networks, Soft & Hard Landscaping works ),Pumping stations, University complex, Building’s, Hospitals, Luxury Villa compound complex, Runways & Taxi ways, Air Wing

& Fighter Jet Shade Structure, Ammunition Depot, Swimming/Diving pool, Chimney Slip Forming construction, Dams & Irrigation projects.

Assigned in different departments - Operation Department - Technical Department / Projects Control Department – QAQC/HSE Department – Estimation Department.. Have gained formal training and Certification in IOSH – Institution of Occupational Safety and Health ( Managing Safety ) & NEBOSH International General Certificate including Fire Warden Awareness Course and got Certification in IRCA – International Register for Certified Auditors for ISO 9000

: 2000 – Lead Auditor for Quality Management System. Held Position such as – Project Manager /Technical Manager, Project Site Manager, Project Coordinator, Project Engineer, QAQC Engineer, Project In-Charge, Quantity Surveyor, Site Engineer, Supervisor, Maintenance InCharge, including Tendering + Procurement/Contract administration & evaluator of all Sub-contractors weekly & monthly accomplishments.

Computer Literate: Extensive used in Excel, Word, M/s Project, Power Point & Computerized Reporting Mr. Wenceslao Agarao Mission “CV”

Contact. No. Mob. No. 094******** / 092******** : Res 02 88472105 : Email : adb39m@r.postjobfree.com Page 2 of 11

Objective :

To be able to apply and enhance my knowledge in Construction & Project Management & Quality Management System. To contribute the success of the company and be an asset. To have a pleasant and harmonious relations, share knowledge & ideas with superiors, colleagues & clients with the best of my Skills, ability, capability, & Experience.

PERSONAL STRENGHT:

Fast & correct decision maker, responsible and competent, ability to solve work problems independently, analytically and cost oriented, management systems and procedures, good leadership and sense of commitment. A

“ can – do “ attitude.

KEY STRENGTHS:

PROJECT MANAGEMENT AND CONSTRUCTION MANAGEMENT

PROCUREMENT & CONTRACT ADMISTRATION

QAQC, HEALTH AND SAFETY MANAGEMENT

TEAM BUILDING & LEADERSHIP

CLIENT RELATIONS & PEOPLE MANAGEMENT

Duties / Responsibilities :

1. Report to General Manager

2. Tender Stage - Manage technical team to Review Tender documents and identify, difference between Specifications, Drawings, BOQ, project deliverable requirements and provide checklist report to Estimation and commercial department for any cost consideration – Prepare Tender Technical Submittals in coordination with various departments.

3. Successful Bids & Award of Contract - Manage technical team to Review Contract documents and identify, difference between Tender Documents & Contract Issued Documents ( Specifications, Drawings, BOQ, project deliverable requirements, Risks) and provide checklist report to General Manager, Planning, HSE/QAQC, Procurement /Cost Control, estimation and commercial department for any additional/omission on Issued contract documents requirements. – Manage in Preparation project start-up deliverable in coordination with various departments. ( Mobilization requirements, Procurement Schedule, Shop Drawing schedule, Material Lists, Subcontract works, Project team & Resources requirements, Budget review, Method Statement preparation, QAQC/HSE requirements, Review of Activity Sequencing. 4. Coordinate work of all concerned departments to identify opportunities to reduce project costs and increase operational efficiency

5. Provide management team with regular meeting, reports for project delivery forecasts and coordinate them functionally and operationally for successful execution to ensure timely completion of project within budget and comply with Client’s contract requirements and project specification. 6. Manages and coordinates the use of resources; staff, employees, and equipment to ensure they are utilized to the maximum efficiency

Mr. Wenceslao Agarao Mission “CV”

Contact. No. Mob. No. 094******** / 092******** : Res 02 88472105 : Email : adb39m@r.postjobfree.com Page 3 of 11

7. Review all submittals to insure it is in accordance to project specification and contract requirements and conduct Quality Audits

8. Establish & coordinate harmonious working relationship with Clients, Public Authorities & Consultants to encourage team spirit within the operation from project start until project closeout 9. Management of all Technical related Quality matters on projects during project execution 10. Coordinating with Subcontractors or insure timely, safety and quality execution of works 11. Follow-up on Material Submittals and procurement to ensure timely delivery to site 12. Review & follow-up with specialized sub-contractors Shop Drawings Submittals and procurement to ensure timely delivery to site

13. Planning of Projects including cash flow forecasts and procurement schedules and ensuring their implementation including Budget Finalization agreed by the Commercial Department and Management.. 14. Prepare Project Quality Plan, Process control, Inspection and Test Plans & procedures 15. Monitoring of Progress and Cost Control to achieve target dates and budgets 16. Manage Project Closeout Documents Guidelines, submittal of all As-Built and Record Documents including coordination with Client & subcontractors for their scope. 17. Manage the preparation of Operations and Maintenance Manuals + Testing and Commissioning. 18. Reporting to higher management with regards project development and Quality assurance Matters. Professional Experience: Relevant projects:

Infrastructure Project

Roads and Infrastructure in the North of New Salata – Qatar Street Lighting & Roadwork’s

Engineering Works for Street Lighting

3000 Public Houses Project. 780 UNITS Combined

Coordinated Infrastructure Project @ Saliyah -Qatar -Teyseer Combined Infrastructure, Block 800, 6 & 7,West Bay, Doha - Qatar

- Teyseer

Mesaaid Road & Boundary wall project, Mesaaid

Municipality-Qatar - Amcon

QR 6.9 million

QR 5.9 Million

QR 80 Million

QR 60 Million

QR 20 Million

Schools & University

Complex

Construction of 3 New Schools Group 7A Package 1- ITC Construction of 3 Schools (19, 20 and 21 ) of 23 Schools – ITC Six Model Schools for Boys and Girls @ Doha Villages - ITC VCU – Virginia Commonwealth University – Qatar - ITC University Of Qatar – Midmac

University of Life, Pasig City Philippines – NCBI

QR 155 Million

QR 180 Million

QR 103 Million

QR 190 Million

QR 360 Million

P 160 Million

Mr. Wenceslao Agarao Mission “CV”

Contact. No. Mob. No. 094******** / 092******** : Res 02 88472105 : Email : adb39m@r.postjobfree.com Page 4 of 11

Hospital & Building

Muaither & Wasbaj Health Center – Qatar : ITC

Expansion to Ministry of Finance and Petroleum Affairs Building. - Qatar - Midmac

The Palm twin Tower (52 Floor) – Al Seal Qatar - Part Time Marriott Hotel - Harinssa Qatar – Part Time

Bezad Office Building & Luxury Villa @ Muntaza – Qatar - Teyseer

National Children’s and Laying Hospital,

Quezon Boulevard, Philippines - NCBI

FACECORF Office Building – Intramuros, Manila (Pamvir) Sto. Nino Municipal Building and Public Market – (Pamvir) Western Samar Philippines

QR 280 Million

QR 150 Million

QR 350 Million

QR 420 Million

QR 30 Million

P 360 Million

P 5 Million

P 15 Million

Sports Complex

Renovation of 7 2nd Grade Sports Club & Doha Stadium : ITC Development of Sumaisma & Barzan Cultural & Social Center : ITC Renovation of Khalifa Tennis & Squash Complex ITC Development of Qatar Sports Club : ITC

Qatar Sports Club Broadcasting : ITC

Development of Al Arabi Sports Club - Qatar : ITC

Development of Al Khor, Al Wakrah & Al Ahali Sports Club Qatar : ITC

Design & Build Rayyan Sports Club - ITC

University of Life Sports Complex, Olympic Swimming Pool & Indoor Facilities - Philippines : NCBI

University of Qatar Sports Complex, Olympic Swimming Pool, With Indoor Facilities for Men & Women - Qatar : Midmac QR 108 Million

QR 104 Million

QR 42 Million

QR 102 Million

QR 25.3 Million

QR 40.5 Million

QR 129 Million

QR 20 Million

P 380 Million

QR 360 Million

Mr. Wenceslao Agarao Mission “CV”

Contact. No. Mob. No. 094******** / 092******** : Res 02 88472105 : Email : adb39m@r.postjobfree.com Page 5 of 11

Design & Build +

Alteration and

renovation

& Fit out Projects

Tornado Tower Fit-out Works– Qatar : ITC

Eatopia Restaurant @ The Gate - Qatar : ITC

Mr. Issa Private Villa – Qatar : ADCON

Renovation and Development of 2nd Grade Sports Seven Sports Club - Qatar : ITC

Renovation of Khalifa Tennis and Squash Complex - Qatar : ITC Renovation of Burgos Church – Makati Philippines : Pamvir QR 76 Million

QR 40 Million

QR 3 Million

QR 108 Million

QR 42 Million

P 15 Million

Marine Projects

Construction of Jetty & Lighthouse Platform- Doha

Cornich - Qatar : AMCON

Doha Corniche Beautification Project- Qatar : AMCON Offshore Marine Facilities for Qatar Fertilizer Facilities Civil works.

- Qatar : AMCON

EPC Marine Dock Facilities @ Q-Chem-Civil works : AMCON Slipway Improvement @ Marina Mariot Hotel - Qatar : AMCON Al Kuwary Jetty & Slipway Project- Qatar : Midmac

QR 75 Million

QR 150 Million

US$ 125 Million

QR 250 Million

QR 8 Million

QR 5 Million

Mr. Wenceslao Agarao Mission “CV”

Contact. No. Mob. No. 094******** / 092******** : Res 02 88472105 : Email : adb39m@r.postjobfree.com Page 6 of 11

Industrial, Power,

Desalination and

Water

Reservoir Project

Energy Center @ Doha Festival City - Qatar : ITC

Nodco Refinery Expansion projects – Civil Work - Qatar :Teyseer NGL- 4 Expansion Project – Civil works - Qatar : Teyseer CP – 2 & CP-4 @ Qatar Foundation- Qatar : ITC

Civil Works Ras Abu Fontas “B” & “C” Desalination Plant Additional Facilities - Qatar : Teyseer

Ludo & Luym Cooking Oil Refinery,Power &

Desalination Project, Pasil, Cebu, Philippines : RS Arrieta/Pamvir G+1 Workshop & Office for Qatari – German Switchgear

- Salam Meta Coat - Qatar : ITC

QR 30 Million

QR 180 Million

QR 20 Million

QR 110 Million

QR 180 Million

P 600 Million

QR 27 Million

Power & Substation

Projects

Civil Works - New Doha “J”, Doha “H”, Airport Supper, West Bay Lagoon, Naeeja Extension, Ras Qutayfan

220/66/11 KV Substation – Alstom -Qatar : Teyseer

New Trade Center 66/11 KV Substation-Alstom - Qatar : AMCON Construction of Q-Chem 132KV Switching Station -Qatar : AMCON

Saliya, Al Wakra and Wajba Turbine Project –Alstom - Qatar : Midmac

QR 220 Million

QR 29 Million

QR 30 Million

QR 150 Million

Villas Complex

Construction of Sheika Hadiya Villa @ Lusail City : Adcon Construction of Sheika Galiya Villa @ Murakie Qatar : Adcon Construction of Sheik Khalid & Sheik Talal Palace Villa : Adcon Design & Build 36 Villas for HBN- Um Salal – Qatar : Adcon Design & Build 5 Villas for HBN @ Um Salal – Qatar : Adcon Design & Build 2 Villas for HBN @ Um Salal – Qatar : Adcon 10 Villas Residential Compound @ West bay Lagoon : ITC Mr. Jaasim Al Mohanadi Villas, Majilis & service buildings

@ Naseriya Area- Qatar : Teyseer

QR 2.5 Million

QR 3.5 Million

QR 7 Million

QR 40 Million

QR. 7 Million

QR. 2.5 Milliom

QR 19.9 Million

QR 30 Million

Mr. Wenceslao Agarao Mission “CV”

Contact. No. Mob. No. 094******** / 092******** : Res 02 88472105 : Email : adb39m@r.postjobfree.com Page 7 of 11

Luxury Villas, Indoor

Swimming Pool &

Majilis

.H.H Sheik Hamad Bin Althani Majilis & coffee House@ Shahaniya - Qatar : Teyseer

Construction of Abdullha, Khalid, Ghazi &Khalid Manai : Teyseer Delux Villas including Interior Finishing works for Sheik Khalid Abdulah - Qatar : ITC

Construction of Indoor Swimming Pool for H.E Sheik Khalid Bin Kahlifa Al Thani- Qatar : Teyseer

Ang Tahanan, CCP Complex, Philippines : NCBI

QR 5 Million

QR 9 Million

QR 60 Million

QR 70 Million

P 350 Million

Residential

Development

Complex

Refugee Processing Center. Morong, Bataan Philippines. United nation Project - NCBI

P 60 Million

Special Project

:

Design & Build Roof garden in Private Location - Qatar Diwan Emeri Interior Finishes – Kemsumco/Midmac

QR 30 Million

QR 600 Million

Taxi Ways, Special

Shade Structures

Air Wing Forces Fighter Jet Shade Structures, Parking Bay, Ammunition Depot and Taxi ways - Qatar : Midmac Nodco Refinery Workshop - Qatar : Teyseer

PNOC Warehouse – Mabini, Batangas, Phil.

QR 1.8 Billion

QR 9 Million

P 15 Million

Communal Dams &

Irrigation Projects in

Western Samar. Phil

National Irrigation Administration ( NIA ) - Philippines La Paz Communal Irrigation Project,- Gandara,W. Samar San Agustin on Communal Irrigation Project Gandara, Samar, Mawacat Irrigation Project,

Sta. Margarita Communal Irrigation Project.

P 150 Million

P 80 Million

P 50 Million

Mr. Wenceslao Agarao Mission “CV”

Contact. No. Mob. No. 094******** / 092******** : Res 02 88472105 : Email : adb39m@r.postjobfree.com Page 8 of 11

Career Experience Summary:

1. Advance Construction Trading & Contracting/. : Doha, Qatar: October 2015 – Feb. 2019 Possition : Technical Manager

Projects : Stockyard Facilities – QP Dukhan, Compound Villas, Luxury Palace Villas, Infra Structure Projects, Fit- out Projects.

2. Dragonhart Construction Enterprises, Inc. Quezon City : July 15, 2015 to August 2015 Possition : Consultant

Projects : Pasig & Muntinlupa Infra Structure Porjects 3. International Trading & Contracting Co. : Doha, Qatar: June 2003 – Nov. 2014 Possition : Project Engineer/ Project Site Manager / Technical Manager / QAQC Manager Projects : Buildings, Sports Complex, Fit out Works, Swimming Pool, Stadium, Sports Hall, Schools, Luxury Villas, Palace

4. Amcon Limited / Amcon Project Management : Doha, Qatar : Oct. 1999 – June 2003 Possition : Project Engineer/ QAQC Engineer

Projects : Oil & Gas Projects, Marine Projects. – Nodco Expansion Refinery Project, NGL-4 Project, Marine Projects – Jetty, Q-Chem. Port, Rock Armoring, Intake & Brine Channels, Shore Line Protection, Power & Substation, Schools, Infrastructure & Roadwork.

5. Teyseer Contracting : Doha,Qatar : Oct. 1989 – Oct. 1999 Position : Site Engineer

Projects : Power & Desalination Plants, Substations, Pumping Stations, Infrastructure Projects Roadwork’s, Sewage system & water treatment Plant, Water & Distribution network, Power & communication Networks, Buildings, Luxury villas, Steel Structure, Swimming pool. Galaxy Trading & Contracting Previous Name

ECC – Excavation & Crushing Company – Affiliate Company Part Time : Technical Manager Mr. Wenceslao Agarao Mission “CV”

Contact. No. Mob. No. 094******** / 092******** : Res 02 88472105 : Email : adb39m@r.postjobfree.com Page 9 of 11

6. Midmac Contracting : Doha, Qatar : June 1982 – Sept. 1989 Position : Civil Supervisor

Projects : Buildings, University Complex, Sports Complex, Turbines Power Plants, Taxi ways & Runways, Aircraft

& Fighter Jet Shade Structure, Ammunition Depot, Palace + interior, Swimming Pool, Diving Pool, Oil & Gas Projects, Substations, Roadwork & Infrastructure.

7. Pamvir Builders / R. S. Arieta Construction: Philippines: Jan. 1981 – Jan. 1982 (June – Dec. 1979) Position : Project Engineer

Projects : Power & Desalination Plants, Refineries, Cement Factory, Chimneys, Hospitals, Buildings, Steel Structure, Warehouse, Markets, Residential Housing.

8. New City Builders : Philippines: Dec.1979 – Dec. 1981 Position : Project Engineer

Projects :Hospitals, Refugee Processing Center – Admin Building, University of Life- Dining Hall,Stadium, Swimming Pool & Diving Pool, Shooting Range, Sports Complex, Bliss Housing Complex. 9. National Irrigation Administration: Philippines: April – June 1979 Position : Project Inspector – Clerk of Works

Projects : Dams & Irrigation Projects.( Lapaz – San Agustin Gandara, Mawacat ) Education & Qualifications:

1974 – 1979 : College – B.S.A.E. (Bachelors’ of Science in Agricultural Engineering) University of Eastern Philippines : (U.E.P.) Northern Samar 1970 – 1974 : Secondary

Tiburcio Tancinco Memorial Vocational School : Calbayog City 1964 1970 : Elementary

Sevilla Elementary School Sto. Niño, Western Samar Mr. Wenceslao Agarao Mission “CV”

Contact. No. Mob. No. 094******** / 092******** : Res 02 88472105 : Email : adb39m@r.postjobfree.com Page 10 of 11

Training and Memberships :

AQUAPHONC 101 PHILIPPINES : Philippines Trade Training Center 22 June 2019 SNAP Hydropohonics ; IBP UPLB 17 June 2019

IOSH Institution of Occupational Safety & Health : Certificate . No. 666895 : Managing Safety : UK Base In association with Northfield Training – Doha Qatar No. 3596 March 2019 NEBOSH EGC National Examination Board In Occupational Safety & Health based in UK

( Northfield Training Center – Doha, Qatar ) March 2019 Fire Warden ( Northfield Training – Doha – Qatar) March 2019 PMP Training Program 40 Contact Hours ( PMP book 4th & 5th Edition ) – Focal Qatar 2011 Introduction to Project Management – College of the North Atlantic – Qatar 2011 Green Building Principles & LEED Core Concepts Program, Qatar Green Leaders 2011 Legal Perspective on Contract Management – Salam International ( In House Training ) 2010 Project Management Institute ( PMI ) Member PMI Member: ID No. 106****-**** PMP Training Program 35 Contact Hours ( PMP book 3rd Edition ) – Syscom Qatar 2007 Lead Auditor Training Course – Velosi Qatar : Quality Management System – ISO 900*-****-**** IRCA – Certified Lead Auditor for Quality Management QCS IRCA QMS ISO 9000:2000 Certificate No. A18021/406/2004 2004

Certificate of M/S Project Planning & Management New Horizon – 2003 Scaffold Inspection Awareness

CITB (Construction Industry Training Board) – Cert.No. SSC/ST/065 2003 SE Supervisory Course – LG Engineering HSE Office, Nodco Refinery Expansion Project 2002 Certificate of Primavera Planner 1999

Formation of Entrepreneurs and Creation of Enterprises 1996 M.S. Word /Excel for Windows 1994

Slip Forming Techniques Aquila Philippines 1981

Ministry Of Public Works & Highways Workshop Manila 1980 Formworks, Reinforcement cutting preparation, Post Tensioning, Concrete works, Welding, Piling Prefab building, Structural Steel including Estimating Bill of Materials. Mr. Wenceslao Agarao Mission “CV”

Contact. No. Mob. No. 094******** / 092******** : Res 02 88472105 : Email : adb39m@r.postjobfree.com Page 11 of 11

Field Trip & Seminar:

Tunneling & Open Pit Mining Exploration – Marinduque Mining Corp. – Bagacay Mines 1979 Drilling Exploration – Tongonan Geothermal Power Plant – Ormoc, S. Leyte 1979 Slip Forming Techniques Aquila Philippines 1981

Ministry Of Public Works & Highways Workshop Manila 1980 Formworks, Reinforcement cutting preparation, Post Tensioning, Concrete works, Welding, Piling Prefab building, Structural Steel including Estimating Bill of Materials. Field Trip & Seminar:

Tunneling & Open Pit Mining Exploration – Marinduque Mining Corp. – Bagacay Mines 1979 Drilling Exploration – Tongonan Geothermal Power Plant – Ormoc, S. Leyte 1979 PERSONAL DETAILS :

Name : Wenceslao Agarao Mission

Date of Birth : 28 September 1957

Address : Block 3, Lot 16, Rosario Complex, San Pedro, Laguna Status : Married with 3 Children’s

Religion : Catholic

Passport No. : P5506409A – valid until 03 January 2028 SSS No. : 03 – 5576947 8

Pag – ibig No. : 1210 – 0724 – 1664

Philhealth No. : 19-026****** 4

Driving License : D04—121782 Valid until 2021 September 28 References:

Engr’r Gil de la Pena

General Manager Garuda Construction Co.

8760 Santol St., San Antonio Village

Makati City

Tel # 88 – 46 – 34 / Mob. # 091********

Acknowledgement:

I hereby acknowledge that the content of my “CV” are true and correct. Wenceslao Agarao Mission:

Mr. Ricardo Lagui

Boom Construction Projects Contracts Manager

Mob # +974-********



Contact this candidate