Post Job Free

Resume

Sign in

Manager Construction

Location:
Dubai, Emirate of Dubai, United Arab Emirates
Posted:
March 03, 2020

Contact this candidate

Resume:

CURRICULUM VITAE

JAINUDDIN

Contact- +919*********, +919*********, +919*********

Email Id: adb36x@r.postjobfree.com, adb36x@r.postjobfree.com

SAIPEM S.p.A. Email (adb36x@r.postjobfree.com) (GHRS131292) (SP 6557)

Career Objectives:

Looking ahead for an organization that offers me a chance to utilize my skills and help me to grow professionally.

Work Experience:

19 years of diversified experience in Manufacturing piping, pressure, vessels and. structural India and Middle East.

Employment History

Having vast experience in various types of piping pipe supports and equipment fabrication, and installation of site eructation and having good knowledge of shut down of refineries / Petro chemical & fertilizer industries, Site & factory fabrication of pressure vessel, heat exchanger and column, reactor, tower, tank, structural, production, planning, and time and study and material analysis.

Area in expertise

Saudi Armco project

Water treatment plant

Pressure vessel, tank fabrication and erection &pressure piping

Heat exchanger of all kinds of all material and size

Storage tank ( shop fabricated field fabricated /erection

Structural steel & chimney

Columns for Armco and sabic

SAIPEM Sanamprogetti- KSA (Onshore & Offshore)

Position – Pre-fabrication Supervisor Duration - 22/05/2016 to 09/03/2019

Client - Saudi Aramco Department- Project

Project Handled:MRJN,ZULF,HSBHA,ABSF,SFNY (LTA1 &LTA2)

Responsibilities as Pre-Fabrication Supervisor: (Onshore Activities)

Responsible for Fabrication of CS, SS, AS Pipe Spools as per ISO Metric

Fabrication of JACKETED LINES Pipe Spool as per ISO Metric

Responsible for piping fabrication and welding of 1400,000 dia inches including carbon steel, stainless steel and alloy steel.

Initiating implementation of SAIPEM S.p.A. in-house systems for progress monitoring and material management system .

Monitoring of piping material vouchers & engineering instruction for sub cone.

Responsible for weld mapping and AS Built of piping isometric,

Analyze material vouchers & co-ordinate with material management crew for the availability of material at workshop.

Distribute manpower as per workload.

Control the fabrication according to the revisions in engineering.

Arrange QC release reports & get the fabricated spools shifted to required locations

Coordinate with the subcontractor for the FBE (Fusion bounded Epoxy) shifting and receiving.

Full filling HSE precautions with subcontractor before starting the daily job.

Attending daily TBT (Tool Box Talk) with subcontractors workers.

Having issuing and operating authority for the Permit sing and issuing.

Responsible for the supports fabrication and supports voucher issuance for subcontractor.

Responsibilities as Pre-Fabrication Supervisor: (Offshore Activities)

Responsible for Hook Up Activities as Site Supervisor.

Receive direct instruction from Offshore Site Supertendent as well as Project team.

Supervising more than 30 peoples for various offshore site activities.

Responsible for various offshore structural activities as the part of Hook Up activities.

Jacket Punch list clearing and Coordinating with QC Dept for PID Inspection.

Responsible for Fabrication of CS, SS, AS Pipe Spools as per ISO Metric as per site condition.

Installing the spool on site after QC clearance

Coordinating for the hydro test and leak test activities for the spools.

Initiating implementation of SAIPEM S.p.A. in-house systems for progress monitoring and material management system .

Monitoring of piping material vouchers & engineering instruction for sub cone.

Responsible for weld mapping and AS Built of piping isometric,

Analyze material vouchers & co-ordinate with material management crew for the availability of material at workshop.

Distribute manpower as per workload.

Control the fabrication according to the revisions in engineering.

Arrange QC release reports & get the fabricated spools shifted to required locations

Coordinate with the subcontractor for the FBE (Fusion bounded Epoxy) shifting and receiving.

Full filling HSE precautions with subcontractor before starting the daily job.

Attending daily TBT (Tool Box Talk) with subcontractors workers.

Having issuing and operating authority for the Permit sing and issuing.

Responsible for the supports fabrication and supports voucher issuance for subcontractor.

FERROFAB FZE

JEBAL ALI DUBAI

Position : FABRICATION SUPERVISOR Duration : 17 /04/2014 TO 14/03/2016

Clients : PETROFAC, NOV, PDO, ARAMCO, Department : Manufacturing division Responsibilities:

Worked with close co-ordination between Superintendent and Construction Manager for the manpower, technical solutions and work requirements at site. Leading to the team of different trades such as, presser vessel tank Fabricators, Pipe Fabricators, fitter, and mechanical Helpers etc; to expedite the work in different areas of above ground and under ground Piping. Implementing new techniques to achieve the progress percentage as per the planning dept.work suppose to be done strictly as per the drawings supplied by the client such as Isometric drawings, P&ID, plan layouts, Line List etc.

BILFAL HEAVY INDUSTTRES LTD

JUBAIL INDUSTREAL CITY KSA

Position : FABRICATIONS SUPERVISOR Duration 12-05-2012 to 11-11-2013

Division : Process Equipment Division Department :Manufacturing division

Clients : ARAMCO, SWCC, ma’ Aden, JGC, etc.

Responsibilities:

Worked with close co-ordination between Superintendent and Construction Manager for the manpower, technical solutions, and work requirements. Leading to the team of different trades such as, Fabricators, Pipe Fitters, and mechanical Helpers etc; to expedite the work in different areas of above ground and under ground Piping. Implementing new techniques to achieve the progress percentage as per the planning dept. Work suppose to be done strictly as per the drawings supplied by the client such as Isometric drawings, P&ID, plan layouts, Line List etc.

Welding i.e., SMAW,GTAW,MIG, FCAW,GAMW,SAW,with single wire and double wire ( twin wire saw/tandem saw)

Strip cladding, electro slag strip cladding esw.tube to tube sheet welding,internal bore welding for tube and ferrules welding, ss, al bronze welding, duplex welding ss & E625inconel etc,

Pressure vessel fabrication of all kinds with various designs ranging from 2 tons to 2000 tons fabricated.

Major clients; SAUDI ARAMCO,SK ENGG, DAELIM, SAMSUNG,DOOSAN and many others

ZAMIL STEEL INDUSTRIES

DAMMAM INDUSTRIALCITY -II, DAMMAM, K.S.A.

Position : FABRICATION SUPERVISOR Duration : 18-01-2010 to 25-01-2012

Division : Process Equipment Division Department : fabrication Manufacturing

Clients : ARAMCO, SWCC, PETROFAC INTL LTD, JGC, etc.

Responsibilities:

Working under the Manufacturing Department’s Production Shop for its Process Equipment Fabrication’s such as Pressure Vessels, Reactors, Strippers, drums, Flakers, Heat -Exchanger, Etc. Following Different Standards and Codes such as ASME, TEMA, ANSI, ARAMCO,Etc. Handling a large number of manpower consists of different trades such as (Fabrication/Welding (Fabrication/Welding), Fabricators, Fitters; Welders (SAW/FCAW/SMAW/GTAW) .Ensuring the production output meets the acceptable quality levels and adheres to specific American Welding

Society (AWS) codes and all applicable standards, reviewing daily production report and analyzing the causes for any deviation. Ensuring the reduce in process wastages and also reduce in fabrication costs and its process quality at all stages.

GALFAR ENGINEERING (OMAN)

Position : PIPING SUPERVISOR. Duration: 1st March, 20008 to 4th Dec, 2008

Project : Harebell Project Oman Department : Piping &.Structural

Owner : P .D.O Client : Petrofac

Responsibilities:

Worked with close co-ordination between Superintendent and Construction

Manager for the manpower, technical solutions, and work requirements. Leading to the team of

Different trades such as, Fabricators, Pipe Fitters, and mechanical Helpers etc; to expedite the work in

Different areas of above ground and under ground Piping. Implementing new techniques to achieve

the progress percentage as per the planning dept. Work suppose to be done strictly as per the

Drawings supplied by the client such as Isometric drawings, P&ID, plan layouts, Line List etc.

ARBIAN INDUSTRIES L .L.C (OMAN)

Position : Fabrication Foreman Duration: 19th Dec, 2005 TO 22nd, NOV 2007

Department: Fabrication Client : Oman. P D O / Petrofac /

Responsibilities:

Major work done was of Tank, presser vessel piping skid package with skilled manpower. The tasks

Were completed.

Within the time limit given by the client. Repairing work was done such as Structures,

Pipelines,, fabrication shop

For the job under fabrication such as Pressure Vessels, Heat Exchangers, Flakers,

Filters, etc. Maintaining the quality

As per the various codes such as TEMA, ASME, ASTM, ANSI.

LARSEN & TOURBO LIMITED (INDIA)

Position : Fabrication Supervisor Duration : 11th Feb, 2004 TO 20th Oct, 2005

Project : Workshop, Poway, Mumbai

Responsilibiltes : Followed instructions of Workshop Engineer related to the Fabrication shop work.

Also Handled a Fabrication shop work in the absence of senior. Got knowledge related to expedition of work.

VIJAY TANK & VESSELS ( P) LTD

Position : Fabrication Foreman Period : 10th Jan, 2001 TO 02nd Feb, 2004

Project : VADODRA GUJRAT

Responsibilities :

Followed instructions of Workshop Manger related to the Fabrication shop work. Also Handled a Fabrication shop work in the absence of senior. Got knowledge related to expedition of work. Completed the project of Tire Curing Press Machine with the successful result oriented report.

OFFSHORE BOSIET Training

SMTC GLOBAL, Saudi Arabia

Certficate.No: 622857002806180012

Date of Issue: 26-06-2018

Date of Expiry: 27-06-2022

Technical Qualification:

Diploma in Mechanical Eng. From Al kabirPolytechnic, Jamshedpur (year – 2001)

Software Skills:

MS OFFICE (Excel, Word, Power Point) Expert user.

BASIC COMPUTER

Professional Skills:

Conversant with various codes and standards such as ASME,ANSI,ASTM,TEMA,API & SABIC standards,HSE Management system and Construction Safety Codes.

Skilled in planning and practical execution of various constructions works, identifying technical issues and subsequent problem solving for successful on time completion of projects.

Detailed study of scope of work and identification of all activities involved with the execution of each work.

Preparation of project execution plans and construction method statement for different mechanical works based entirely and specifically on the scope of work and project specification.

Preparing equipment, material and manpower requirement lists and corresponding mobilization plans.

Practical Execution and Supervision of works as per the schedule with strict observance of Quality Standards & Project Specifications.

Achievements:

Winner of Consolation Prize in Safety Poster Competition held in July 2008 at GULFAR ENGG. OMAN Best Performer Safety & Quality in GULFAR ENGG. OMAN

PERSONAL VITAE

Date of Birth :25th July 1980

Gender :Male

Marital Status :Married

Religion :Islam

Nationality :Indian

Languages Known : English, Hindi, Arabic &Urdu.

Passport Number :Z3582752

Place of Issue :JADDAH

Date Of Issue :23/04/2018

Date Of Expiry :22/04/2028

Write : English, and Hindi

Read : English, Hindi,

JAINUDDIN



Contact this candidate