Post Job Free

Resume

Sign in

Sr Mechanical Engineer Hvac

Location:
Qibla, Kuwait City, Kuwait
Salary:
1850 kd
Posted:
March 02, 2020

Contact this candidate

Resume:

C.V

Eng. Moheb Shafiq El-Azab El-Ammawy

(**th years Practical Experience )

E-mail : mohebelammawy@ yahoo.com Mob.No. : +965-********

Date of Birth : 5-3-1968

Religion : Muslim

Nationality : Egyptian

Certificate : B.Sc. Mech. Power Eng, Alexandria University

Graduation Date : 1991 (Excellent in Graduation project)

Passport No. : A 22778633, valid till : 18/05/2025

Scope of Services : Senior Mechanical Engineer

HVAC & Refrigeration : Design/Review &Supervision

{PL, FF, LPG, Steam systems

Swimming Pools,Fountains } : (Design /Review &Supervision).

Lifts & Elevators : Supervision of Execution/ Installation Works.

Egypt Eng., Syndicate : Membership No : 5261/ 32 .

Kuwait Society of Eng., KSE : Lifetime Membership No : 19847

: HVAC Consultant No, 1523

MEW Certified A/C Eng. : (No: 24/2015)

Languages : fluent in Arabic, English & little French.

Driving License : Valid Gulf Driving License till 21/10/2019

Computer skills :

- Auto CAD : All versions.

- Thermal Load calculation programs ( Carrier E-20-II, HAP 5.11, Elite etc) .

- Ducts / Pipes design manually and by using different software programs.

- Windows, Microsoft Word, Excel,Power Point, Internet Browsing etc .

Skills and Experience :

To provide leadership and subject matter expertise to the project to achieve time, cost, quality and safety objectives

To monitor and report on the production of information with respect to the discipline-related services submittal progress

To review submitted shop drawings and material submittals (and the like) against the drawings and specifications, local codes and statutory requirements and international best practice

To check and ensure co-ordination between discipline-related services works and all other disciplines

To provide technical input and experience to resolve discipline-related engineering issues on the Project

To monitor the Engineers and Inspectors performance to ensure that they are fulfilling their roles and responsibilities

To maintain open communication with the client and contractor's discipline engineers on project related issues

To coordinate the works to ensure successful project hand-over

To maintain a daily project related diary

To prepare project reports (written and photographic) on progress of works, quality and technical conformance of the works, safety and other matters

To attend technical and progress meetings with the contractor/client's representative

To identify issues and risks that need to be brought to the attention of senior project management as necessary

To manage the QA/QC project requirement with the related discipline

To prepare correspondence on subject matter expertise to issue to the client/contractor as required to meet project objectives

To peview as built and O&M manuals for completeness

To primary point of contact for Project Team Leader and senior site personnel on project related issues

To maintain an open dialogue with the relevant authorities

To monitor other staff

To supervise and technically assist discipline Engineers/Inspectors

To assist Quantity Surveyor in the assessment of contractor's claims for variation to contract

To assist the Planner in the assessment of contractor schedules and other planning matters

To attend project engineering meetings

To review the construction documents and coordinate with the other engineering disciplines

To understand and ensure implementation of the recommended project procedure

To research, establish and document the regulatory and code requirements related to the project

To ensure the orderly completion and timely assessment of project submittals and documentation

To demonstrated knowledge of specific discipline techniques, procedure, codes of practice and relevant international standards

To demonstrated experience and capability in all aspects of relevant discipline engineering within construction field

To demonstrated ability to maintain a positive client relationship and professional firm image

To understand, identify and assess project risk

To communicate effectively, both verbal and written

To organize, lead, and motivate people

AS A Senior HVAC Design Engineer :-

To prepare preliminary design concept for HVAC projects.

To make HVAC system and load Analysis on preliminary basis.

To design Complete HVAC System based on the Architectural Drawings.

To upgrade the design Jobs with necessary coordination with Project Architect / Structural Engineers and with other services (Electrical, IT, Plumbing and Fire Fighting. etc).

To calculate / provide HVAC Electrical Loads to Electrical Engineers for the system in each design stage for their necessary actions.

To coordinate with Architectural and Structural Engineers for necessary wall openings, sleeves, shafts, false ceiling, raised floor…..etc.

To design complete HVAC& Ref, systems for all types of D/X, Air / Water Cooled including all equipment like D/X units, Fan coil units, Air Handling Units, Heat Recovery Units, Air/ Water Cooled Chillers, Chilled Water Pumps, Expansion Tanks (open /closed Types), Air/sand separators, Cooling Towers ….etc.

To make units selection based on manufacturers' catalogues (manually or computerized).

To Design Sheet Metal Duct Systems for Supply, Return and Exhaust air.

To Design Chilled Water Piping systems for supply and return / reverse return, Condenser water Piping systems for supply and return

To prepare the (general& particular) specifications.

To check the design drawings for the ongoing projects.

To prepare the Bill of Quantities and make the cost estimation for the projects.

To enquire the prices and specifications for particular projects for all the equipment like DX units, AHUs,Hivar, PACUs, Chillers, Cooling Towers etc.

To submit the Design drawings to Ministry (MEW) and take approvals for the design.

To calculate the complete Smoke Ventilation system and take approval from Kuwait Fire Department (KFD).

To attend the client meetings for their necessary demands / comments and incorporating them.

To do all required coordination for different services ( HVAC & Refrigeration,PL, FF, LPG, Steam, Swimming Pools, electrical HV/LV) (in Design &construction stages)

AS: A Senior Mechanical Supervision Engineer

( HVAC, Refrigeration,Plumbing,LPG, Steam, Swimming Pools &Fire Fighting systems):

To review & check mechanical workshop/composite drawings, submittals and take suitable

actions on time .

Supervision of construction of mechanical works of HVAC, Refrigeration, plumbing,Steam,

LPG( Liquefied Petroleum Gas ) Firefighting systems .

All installation jobs including sheet metal duct works, Chilled / condensate water piping

(Black Steel Sch., 40, 80) and all mechanical equipment installations.

Checking the daily progress in the site & approve / reject check listed items compared with the Contract Conditions, Specifications, Contract Drawings, B.O.Q.s & International Standards .

To make value engineering for HVAC projects.

To study and select the best for the HVAC equipment like Air / water Cooled Chillers, Cooling Towers, AHUs, FCUs, Chilled / condensate water pumps, DX Units, Expansion Tanks, Air/Sand Separators, Valves etc ) from different Makes/Suppliers / Contractors and making comparison and selection on the basis of competitive prices and best specification

To check the progressive payment request for the corresponding works completed at site and follow ups.

To Evaluate and make cost estimate for HVAC / PL& FF projects.

To attend meetings (progress / coordination) with different parties and taking necessary actions .

To prepare snag lists for the HVAC, PL & FF projects

To Check and grant approval for the snag items

To Follow-up & approve the TAB (Testing, Adjusting & Balancing) works.

To Check and grant approval for the BAS (Building Automation System) based on contract documents and actual/future requirements of the projects.

To Study & approve the As-built drawings

To Provide HVAC, PL&FF input for the current/final report and current/final payment.

To Approve HVAC, PL & FF systems operation and maintenance staff.

I have a Good communication and time management skills, I am very interested in attending all ASHRAE, Suppliers, Manufacturers' Seminars & I have also soft & hard copies of many References, Standards & Catalogues.

I hope that I'll do my best with you and my C.V. meets your requirements.

Sincerely Yours

Summary of Previous Projects

Projects in Kuwait

Dar SQC international Engineering Consultants.

(From 5/2011 till date) Senior Mechanical Engineer

Supervision (HVAC&PL/FF Works) & Design, Review/modifications, Value engineering.

Mysk by Shaza Hotel ( Design Review &Supervision) (under construction)

Supervision (HVAC&PL/FF Works) & Design, Review/modifications, Value engineering.

Design of Training Institutes for PAAET at Sabah Al-Ahmed Area (under design)

(Around:107000 M2 AC areas /5300 RT total capacity c/w thermal/ice storage tank)

KOC Projects (O&VIPD Complex )@ South Ratqa

AUK (American University of Kuwait) Generic& Admission Buildings.

AUK (American University of Kuwait) Student Union Building

New HQ of PAAF (Public Authority of Agriculture Affairs &Fish Resources)

Gleeb Elshuyoukh Yoyth Center (Public Authority of Sports)

Swaber-6 Commercial Tower@ Sharq,Kuwait .

Dewan Al-Amiri,18 villas @ Kifan

Mellinium (Salmiyah Hotel Development Project) :( PM/CM : Projacs )

Responsibilities :

(Design Review/modifications for all mechanical services & complete Supervision):

-HVAC : 2106 TR total cooling capacity [( 3+1) x 702 TR] water cooled centrifugal chillers (Carrier ), ( 3 +1 ) primary chilled water pumps (Armstrong), (2+1) secondary chilled water pumps for Hotel, (1+1) secondary chilled water pumps for Residential building, ( 3+1)condensate water pumps, (3+1) Induced Draft Counter Flow Cooling Towers, centrifugal sand separators etc.

-Plumbing, Fire Fighting, Fuel systems, Liquefied Petroleum Gas system, Steam system, Compressed Air system, Swimming Pools, Fountains, Laundry & Kitchen Services etc.

-Design Review& modifications for all mechanical services in residential building and preparing all tender documents.

-Redesign for many commercial areas in different floors in the hotel building due to new requirements of Client, I.D, and Operator etc.

-Reviewing & checking all submitted shop/composite drawings and taking suitable actions after discussion with all concerned parties.

-Reviewing & Checking all submitted materials, equipment, accessories ...etc compared with

the Contract Conditions, Specifications, Contract Drawings, BOQs & International Standards .

-Solving all site problems due to site limitations & giving practical solutions with minimum variations to avoid any claims as possible.

-Making all required inspections according to International Standards &contract conditions.

-Attending all site meetings with all concerned parties and taking all necessary actions.

-Reviewing & checking all submitted variation orders.

-HVAC : 2106 TR total cooling capacity [( 3+1) x 702 TR] water cooled centrifugal chillers (Carrier ), ( 3 +1 ) primary chilled water pumps (Armstrong), (2+1) secondary chilled water pumps for Hotel, (1+1) secondary chilled water pumps for Residential building, ( 3+1)condensate water pumps, (3+1) Induced Draft Counter Flow Cooling Towers, centrifugal separators etc .

Farwaniah Hospital (new extension)

( Outpatient, Dental and Main buildings,

Around 450,000 m2 / KD 340,000,000 (project value)

( Preliminary Design Concept & specifications for HVAC Works.)

Infectious Deseases Hospital (IDH) :

Design review for MEW submission

Al-Musallam residential building @ Salmiya

KOC Exhibition Building at Abdulliya Preserved Area (LEED certified building) Design for PL/FF Works

KOC desert camp (1,050,000 m2) (competition)

Preliminary Design Concept for HVAC&PL/FF Works.

CHEVRON 1,2,3,4 (Joint Operation projects)

Design for PL/FF Works, BOQ & Specifications

PAHW Gardens (11 nos)Public Authority for Housing Welfare,

Design for PL/FF Works, BOQ & Specifications.

Amro bin El-Aas Mousque

Design /Review for HVAC, PL/FF Works, BOQ & Specifications.

Girls Youth Centers (PAHW)

Design Review for HVAC, PL/FF Works& specifications.

New HQ., of PAAF(Public Authority of Agriculture Affairs &Fish Resources).

Preliminary Design Concept for HVAC&PL/FF Works.

MOFA Security Fence (MOI Main Building & Gates )

Design for PL/FF Works, BOQ & Specifications.

Villas projects ( Design for PL/FF Works, BOQ & Specifications)

The Associated Engineering Partnership (TAEP)

1- Credit &Savings Bank Headquarters ( Ministry of Public Works –SPA /145 )

(from 6/2010 till 5/20211)

As : A Senior HVAC Design Engineer & MEP Coordinator

Responsibilities:

-Thermal Load calculation using ( Carrier E-20-II, HAP 4.5 & Elite : Chvac 7.01.30 ) programs.

-Under floor air conditioning system/raised floor for all working stations

-Duct design with manual ductlator & programmed.

-Pipes networks design.

-All required coordination for different services ( HVAC &PL, FF ) .

-To prepare the (general& particular) specifications and all contract documents .

-To prepare the Bill of Quantities.

-To do BAS/Schematic diagrams,sequence of operation etc

AS: A Senior Mechanical ( HVAC)Engineer ( Supervision )

2- Kuwait National Library ( KNL ):( Ministry of Public Works –SPA /115)

(from 10/2009 till 1/2010)

Responsibilities:

- Review for all HVAC works ( 1000 TR total cooling capacity [( 2+1) x 500 T R ] water cooled centrifugal chillers (York ), ( 2+1 ) primary chilled water pumps, (1+1) secondary chilled water pumps for part A, (1+1) secondary chilled water pumps for part B, ( 2+1)condensate water pumps, (2+1) Induced Draft Counter Flow Cooling Towers, centrifugal separators, AHUs, FCUs,VAVs,Exhaust / Fresh air fans

-Check and grant approval for the snag items

-Follow-up & approve the TAB works

-Check and grant approval for the BAS (Building Automation System) .

-Study& approve the as-built drawings

-Provide HVAC input for the final report and final payment.

-Approval of HVAC systems operation and maintenance staff.

Pan Arab Consulting Engineers ( PACE )

(from 1/2/2010 till 31-3-2010)

AS: A Senior Mechanical Engineer( HVAC ) ( Supervision )

1-The Avenues Phase 3: ( Al-Rai Real-estate Company) (CM:Mabanee )

Project Description ( Fast Track Project):

The Avenues – Phase III project is an integrated commercial and recreational landmark project comprising a multi-purpose retail centre, food courts, showrooms and other recreational facilities. The project location in Al Rai district of Kuwait adjacent the 5th Ring Road .

( Foot Print Area:102,241 M2,Total Built-up Area :452,703 M2, Total AC Area : 88400 M2).

The project area is subdivided into seven main zones identified as follows :

1. Harvey Nicols 2. Central Plant Room 3. Grand Avenues West 4. Grand Avenues East

5. Luxury Mall West 6. Luxury Mall East 7. Retail Souk & Soku

- Central plant room for Phase 3&4 (22000 TR total cooling capacity )

- [( 10+1) x 1100 T R ] water cooled centrifugal chillers (Carrier ) ( 10+1 ) chilled water Production pumps1870 gpm each, (5 +1) chilled water distribution(VFD) pumps (3740 gpm each), (1+1) chilled water Tertiary(VFD) pumps( Taco USA), (10+1) Induced Draft Cross Flow Cooling Towers (Marly USA) (3300 gpm each) ( 2+1) condenser water pumps(3300 gpm each), centrifugal sand separator, condenser water pump (3300 gpm), AHUs, FCUs,Exhaust / smoke / Fresh air fans 6 chilled water Tertiary (VFD) pump sets, BAS (Building Automation System) .

Responsibilities:

- Responsible for HVAC works Design Verification, Confirmation of Compliance with specifications

and contract conditions .

- Checking and approval of the Contractor's work and coordination with other trades,

- Supervision & Coordination of execution / installation of HVAC works.

- Attending coordination and progress meetings to review project execution status.

- Checking / Approval of Shop/Composite Drawings and Material submittals submitted by the Contractors.

2-Kuwait business Town KBT (Towers #3,4,5,6)

(July2010)

As a replacement of Supervision HVAC& Mechanical Engineers (during their annual vacations).

3-Centeral Bank of Kuwait, CBK (head quarter)

(Dec.2010)

As a replacement of Supervision HVAC Engineer (during his annual vacation).

Dar Saleh Al-Qallaf Engineering Consultants (SQC int.)

(From 2/2008 till 10/2009)

AS: A Senior Mechanical Engineer (Supervision) (HVAC, Plumbing & Fire Fighting)

1-Faris Resort - Khiran (60 Villas & Administration Building) - ( Project Manager : Projacs )

Complete design review & All necessary modifications & supervision for all mechanical services plus outside services.

2- Salmiyah Hotel Development Project :( Project Manager : Projacs )

(Design Review for all mechanical services & complete Supervision)

Al-Bait Al-Maamour Trading Co., ( BMC ) (11/2007 to 8/2008 )

As : HVAC Projects Manager :-

Responsibilities:

-To prepare all submittals of HVAC equipment for the consultant’s review& approval .

- To make HVAC shop/composite drawings coordinated with all other services.

-Construction of mechanical works of HVAC ( plumbing &Firefighting works also)

- All installation jobs including sheet metal duct works, Chilled / condensate water piping installations and all equipment installations.

-To make the daily progress in site & checklists according to the Contract Conditions.

-To enquire the prices for the HVAC equipment like form different suppliers and making cost comparison and selection on the basis of competitive and specification)

-To prepare the purchase order against the final quotations and follow up for their delivery in time.

-To prepare the progressive payment request for the corresponding site works and follow ups.

-All HVAC units connections to power supply& Automatic control systems (BAS) elements.

-Testing, Adjusting & Balancing ( TAB ) for all HVAC systems

-Handling over HVAC systems.

-Static Pressure Calculations using different methods, Duct programs

-Pump Head calculations according to actual executed pipes network with all accessories.

- Closed type expansion tank Size. Calculation

-Pipe sizing and duct sizing both manually and software aided.

- Evaluation and cost estimation of HVAC projects.

-Attending the pre-tender meetings to rectify any mistakes and show any confusion making necessary site visit (if needed).

1-Central Medical Stores New Plant Room / MOH ( Ministry of Health ) in Subhan :

(4 x 385 TR Water Cooled Centrifugal Chillers,4 Ch.W.Pumps,4 Cooling Towers,4C.W. Pumps, Air / Sand Separators,Pressurization Unit, AHUs,FCUs,Condenser& Chilled water piping etc.,)

2-HVAC for Rouda & Hawally Co-Operative Society Administration Building at Rouda

( LUAY AHMED AL-SALEH Consultants ) .

3- HVAC for Manqaf Schools ( Public Authority for Housing Welfare, PAHW ) .

( K.G,Primary, Intermediate Schools, 2 Local Mosques, 2 Emam Houses ) (Contract #1042 KDL) .

4- HVAC for Saad Al-AbdAllah City (Public Authority of Housing and Welfare)

( Primary School, Local Mosque, 321 houses...etc) (Contract 1039 KDL) .

5- HVAC Duct layout for IPG (Independent Petroleum Group) building at Al- Jabriyah .

6 – Cost estimation & Pricing for many projects in Kuwait .

Dar Al Dowailah Engineering Consultants and Construction Managers.

(from 7/2006 to 9/2007 ) ( Head of Mechanical Department )

AS : Senior Mechanical Engineer ( Design & Supervision)

HVAC, Ref, Plumbing, Swimming Pools & Fire Fighting

Responsible for :

-Preliminary Design, Calculations, Detailed Design, and Supervision of Execution/ Installation Works

-Critically review drawings, calculations and specifications at all design stages and provide valuable design input and direction.

- Interfacing and working with clients in a professional manner to achieve project goals.

- Managing work of other Mechanical Engineers and drafters to meet project and client requirements.

-Review & check mechanical shop drawings and mechanical submittals.

-Supervision of construction of mechanical works of HVAC, Plumbing and Firefighting works

1 - Vegetable and Fruit Market (VFM), Sulaibiya.

-( 4+1stand by) Water Cooled centrifugal Chillers 1000 TR each ) & Plumbing and Firefighting works

-Many separate Buildings in VFM.( HVAC by using DX units ) & Plumbing and Firefighting works

-Many cold stores in V.F.M.

-Redesign for many supermarkets, restaurants, banks, shops, offices, stores…etc )

2- Colleges of Technological Studies (Male & Female Buildings) ( P.M.: Turner Projacs )

( Public Authority of Applied Education &Training -PAAET- in Shuwaikh Campus)

(4+1stand by) Water Cooled Centrifugal Chillers 860 T.R. each)

(All design stages except for final tendering stage)

3 - Dowailah Villa. (Supervision).

(220 TR D/X units) (Redesign & shop drawing & complete coordination for all services, all ducts openings in slaps & beams & All Mechanical works.

4 - El-Awady Multistory Car Park at downtown, Sharq

( All Mechanical works ( Supervision ) ( 7 floors - each floor about 7200sq m )

HVAC for lobbies & staircases – ventilation systems (smoke & fresh air ) c/w smoke & fire dampers,volume control dampers,Firefighting works (sprinklers network covers all floors & fire hose real cabinets deluge system for generator room, 1 Jokky&2 fire pumps (1500 gpm, 8 bar).

5- Racing Track in Hunting & Equestrian Club.

(Supervision for HVAC& all mechanical services).

6 - Dasman Residential Tower (16 floors) HVAC, Plumbing & Fire Fighting Systems (Design).

7 - Fadila villas complex in Funtas. HVAC, Plumbing (Design)

8 - Raja El Habbaj Residential Tower (Design) .

9 - Eight Residential Buildings in Salmiyah (smoke ventilation) (Design).

10 - Six Residential Buildings in Hawally ( Smoke ventilation). (Design)

11 - Olympic swimming Pools complex in Khitan,( 3+1 Air cooled chillers - 420 TR total ) ( Design) .

12 - Olympic swimming Pools complex in Farwaniah,(3+1 Air cooled chillers 426 TR total) ( Design) .

13- Residential Tower in Hawally. ( Design)

14- Gleeb Al Sheyoukh - Co-operative Society. (smoke ventilation).

15- El Sheikh Bader Celebration Hall ( Design).

16- Azzour & Mina Abdullah pumping stations (many buildings ) ( Design)

( J.V. with NJS (Nippon Japan ) COSULTANTS CO., LTD. )

-Azzour pump station (3+1 Air cooled chillers 212 TR each )

-Mina Abdullah pump station (3+1 Air cooled chillers 154 TR each )

-Mina Abdullah Brakish water pump station (3 x 20 TR D/X Ducted Split units ).

-HVAC for Chemical & laboratory Building (18 TR D/X Ducted Split unit 1with heat

recovery +3 x18 TR D/X Ducted Split units ) in both Azzour & Mina Abdullah .

-Ventilation for Inlet valve Building in both Azzour & Mina Abdullah .

-HVAC for Sub stations ( 7 D/X Mini Split units ) in both Azzour & Mina Abdullah .

-HVAC for Chemical building (A/C for Electrical room-18 TR D/X Ducted Split unit )

& Ventilation for the entire Building in both Azzour & Mina Abdullah .

-HVAC for Generator building (A/C for Electrical rooms 3x18 TR D/X Ducted Split unit )

& Ventilation for the entire Building in both Azzour & Mina Abdullah

Dar Al khaleej Consulting Engineers ( 6/2006 )

1- Al Oula Fuel stations ( Design)

2- Residential Tower in Salmiya ( Blajat Street) ( Supervision ) .

3- 2 Residential Towers in Salmiya ( Elbedaa zone) ( Supervision ) .

4- Mosque in El Qourain (Design Review).

5-Olympic Swimming pools ( Bahary Club in Salmiya) (Design Review) .

Projects in Egypt :

Fully accomplished works ( Design / Execution ). ( 10/1995-5/2006 ) .

( My Own company with many consulting offices ) Mainly( Bakry Consulting Engineers )

1- HVAC works for Administrative building of Ceramica Prima Factory in El-Sadat City.

2- HVAC works for Eng. Mamdouh Abbas' Villa ( Hatem Hassan consultant office )

3- HVAC works for Eng. Rasheed M. Rasheed's Villa ( Hatem Hassan consultant office )

4- HVAC works for Cairo 2000 Tower's entrance ( Hatem Hassan consultant office )

5- HVAC works (chilled water ) for Omar Effendi's HQ Adly street, Cairo . ( El-Safa

Consultant office )

6 - HVAC works for Omar Effendi Branch, Ahmed Oraby St. ( El-Safa consultant office )

7- Final Stage of Installations & complete Testing, Adjusting,Balancing & Commissioning

For HVAC system in Rockets warehouses& workshops ( 2x65 TR + 2x130 TR Air cooled

Chillers ) in Wady Houf under (CORE) Cairo.

8 - TAB (Testing, Adjusting,Balancing & Commissioning ) for HVAC system in

Military Mubarak City.

9 - HVAC works for Miro's restaurant & kitchen Maady, Cairo .

10- HVAC works for METRA factory for Monitors 6th October City.

11- Cold store in Shoubra El khima.

12- HVAC works for Mr. Samih Zaben's Villa( chilled water system ). (Bakry Consulting Engineers ) .

13 - HVAC works for Mr. Hesham Fouad, Villa.

14- HVAC works for Glass factory 10th Ramadan City (Bakry Consulting Engineers ) .

Cost Estimation &Pricing for the following Projects :

( Some sharing in design & following up installation works partially )

1-Mobiserve Co., First Office Building 6th October City.

2-Tower Villas Sharm El-Shikh City ( 65 TR chiller) (Bakry Consulting Engineers ) .

3-Solimaniah Villa Misr Alex., Desert Road .

4-Rozieka Villa Sharm El-Shikh City (Bakry Consulting Engineers ) .

5-Merna Mall in New Cairo City .

6-DAW Middle East Lbaoratories 10th Ramadan City.

7-Egyptian Industries Union Building in Cairo ( US Aid )

8-HVAC for Southern Cairo Sub Station( Sabbour Consulting Engineers) .

9-HVAC for Al-Qantara Sharq Sub Stations( Sabbour Consulting Engineers ) .

10-HVAC for Dabour Cosmetics Factory in 10th Ramadan City.

11-HAVC for Clean Area building in Qader Factory.

12-HAVC for Elephant Island Hotel, Aswan.(1000 T.R ) (Bakry Consulting Engineers ) .

13-HVAC for Foreign Affairs Department of Cairo Bank, Adly St.

14-HVAC for Goods Village Laboratories in Cairo International Airport.

15-HVAC for the Experimental Theatre in the Balloon-Agoura .

-Maintenance works for HVAC systems in many hospitals, office buildings, factories etc .

ELECON ( Electrical,Ref& HVAC Services ) (5/1993 to 9/1995 )

As a Design & Tenders Engineer

1.El Alabamian press (4 x 19 T.R ducted spilt D/X units ) in 6th October City.

2.HVAC for Administrative building of Al-Mohandes Insurance Co (3 x 250T.R water Cooled chillers)

3.HVAC for Sports Court of Egyptian Sugar& Desalination Co.in Hawamdiyah (220TR).

4.Ventilation for Tura Prison .

5.HVAC for Suez Canal Bank, 10th Ramadan City Branch .

6.HVAC for Suez Canal Bank, Zamalek Club Branch .

7.HVAC for Engineering Syndicate in Damietta .

8.Ventilation for University Students City kitchens.

9.HVAC for Bank Misr, Alexandria Branch.

10.HVAC for Press and Warehouses of Al-Ahram Institution in 6th October City.

( Sabbour Cosultant Office )

11.HVAC for florescent Lamps Test laboratories in Cairo Airport.

12.Two Cold Stores in El Amriyah and El Basateen, Ministry of Defense – Egypt (500 T.R each ) .

13.HVAC for Bank Misr, Ismaliya branch.

14. Ventilation Works for Nile Medical Company.

15.Cold Store for Alexandria Co.

16.HVAC for Civil ID Center in Gharbiyah Governorate. ( Sabbour Cosultant Office )

17.HVAC for Civil ID Center in Sharqiyah Governorate. ( Sabbour Cosultant Office )

18.HVAC for Civil ID Center in Ismaeliyah Governorate. ( Sabbour Cosultant Office )

19.HVAC for Automatic Control Building in New and Renew Energy Authority Hurghada.

( Sabbour Cosultant Office )

20.HVAC for High Institutes of Engineering, Medicine, Languages and Natural Therapy in

6th October City . ( Dr.Eng. Shaker Consultant Office )

21.HVAC for Bank Misr, Qasr Al-Nile Branch.

22.HVAC for Embaba General Hospital. ( Dr.Eng. Esam Eldin Khalil Cosultant Office )

23.Ventilation for Bank Misr's Warehouses in Omraniyah - Gizza.

24.HVAC for Nahdat Misr Press. ( Dr.Eng.Tharwat Abo-Arab Cosultant Office )

25.Two Cold Stores of Omara Co.

26.HVAC for Medicine Faculties, Al-Azhar University . ( 4x1000+500 T.R water cooled Chillers with primary/secondary ch.w. pumps ) . ( Dr.Eng. Shaker Cosultant Office )

27.HVAC for Carpet City, Nasr City. ( 70 T.R Air Cooled Chiller ) ( Hatem Hassan Consultant Office ) .

28.HVAC for Egypt Gulf Bank, 10th Ramadan City Branch.

29. HVAC for Civil ID Center in Dakahliyah Governorate.

30. HVAC for the Administrative Building in Agricultural Researches Center.

31. Ventilation for 10th Ramadan City Sub Station .

32.HVAC for Al-Safwa Tower,Al-Haram (Egyptian Expert House Dr.Eng.Medhat Abo-Zaid) .

33. HVAC for Hilton Dahab, Sharm Al-Shaikh.(Bakry Consulting Engineers ).

34. HVAC for Al-Kuraimat Electric Station.

35. Cooling Towers and Water Pumps for Al-Nile Medicine Company.

36. Cold Stores of Cairo University Hospitals .

37.HVAC for Residential Building in Dokki.

38. HVAC for Wings Tours and Hotels Co ( Dr.Eng. Shaker Consultant Office ) .

39. HVAC for Diving Insurance Center in Sharm Al-Shaikh ( Dr.Eng. Shaker Consultant Office )

40. HVAC for the Egyptian Company of cables in 10th Ramadan City.

41. HVAC for Celebration Hall in Bombard House. ( Dr.Eng.Farouk Elgouhary Cosultant Office)

42. Ventilation for Al-Ahli Bank warehouses in 6th October City ( Sabbour Cosultant Office ) .

43. HVAC for Cairo Bank

44..Mina Garden City ( 80 Villas) Cairo-Alex. Desert Road .

El-Hagar Office ( Dewatering Contracts ) (10/92 to 1/93 ) (As a Site Engineer)

1 - Sewage Water Treatment Plant in Qalyoub .

( construction of the dewatering system entirely : deep wells, submersible pumps, DBs, MSBs,

Generators, fuel storage & distribution system of piping network )

Egyptian German Lifts Co,( LIFT MUNICH ) (As a Mechanical Site Engineer) (6/92 to 10/92)

1-Pyramizza Hotel in Dokki

2-Tower No 20 El Mesaha Square, Dokki .

3- Commercial Studies Institute, Garden City – Cairo.

Summer Training (1987-1991) in many fields:

Internal Combustion Engines ( repairing & maintenance ),

Textile



Contact this candidate