Resume

Sign in

project Manager

Location:
Jeddah, Makkah Region, Saudi Arabia
Salary:
35000
Posted:
February 28, 2020

Contact this candidate

Resume:

ENG. MOHAMED SALLAH

PROJECT MANAGER - SENIOR CHIEF DESIGNER

NWC - MEWA - MODON - MUNICIPALITIES - HOUSING

adb1uu@r.postjobfree.com - 009***********

Page 1 of 9

Hydraulic - Hydrology

Stormwter – sewage – water feed w.w.t.p

infrastructure -buildings and government projects

PERSONAL INFORMATION

- Syrian – Married - Birth : 1970

- Languages :Arabic and English

- International Experience with

Global Consulting Firms

- Experience In PMO & PMC

Education

1- BSc in Civil Engineering on 1997

2- Post-graduate Diploma on 2000

In Environment Engineering

Position Required

Project Manager

Hydraulic Engineer

Chief Resident Engineer

Resident engineer

Chief designer

Senior utility designer

Principal civil Engineer

General Experience

Professional Engineer with 22

years of experience in Utility

and infrastructure Projects,

Design, Design review, Supervise,

Implement, and Technical

support with well-known

organizations in Syrian, UAE and

KSA along with a list of Clients

such as Ministry of housing,

Ministry of Environment Water

and Agriculture, National Water

Company, Eastern Province

Municipality, Saudi Industrial

Property Authority, Saudi

Electricity Company, and Aleppo

University .

10 years of project management experience for contracts valued between $2M and $115M; according to government procurement and competition system, include Attended various meetings in the office of the client;Regarding Bid Opening and Evaluation and project Briefings and Preparation of Feasibility reports, Comprehensive Design reports, and Bid Evaluation reports for various projects.

Over 15 years in Hydraulic and Hydrology projects, projects of floods and stormwater and reduce water levels in groundwater, and mix (stormwater and sewage water ) projects

Good Knowledge in Utility Requirements and Design Criteria of NWC, Modon, Ministry of housing and AASHTO ; balance and matching and harmony among all design parties.

Good Knowledge in network Analysis of Water and stormwaterand sewer, and calculation the Pipeline flows and preparing Hydraulic analysis for more than One Scenario and One Model by software

Review the project management plan and schedule submitted by contractors, and approve it.

Review and approve the safety plan submitted by contractors, ( HSE plan ), and working to ensure the safety of the site and men, and public and private facilities, and consolidating the safety methodology among workers Via lectures and practical applications.

Review and approve the quality management plan submitted by the contractor, to ensure work at a high level of quality, approving materials and suppliers, and setting up a mechanism to control procedures and standards for receiving materials before and after installation

Review and approve the risk management plan submitted by the contractor, and creating a risk register, and devising appropriate solutions according to for it .

Coordination and communication with supervisors of construction work on-site, and directing subordinates to tasks required of them, and Managing the relationship between team members and containing internal team conflicts, Motivating and Optimizing and evaluate Technical and Behavioral and Contextual Competencies of the team

Managing and supervising the contractor's works according to the contracts with the owner, and ensuring that they are working at a high level of quality and skill, and evaluating their performance and reporting to the owner.

Submit proposals to support quality control in all construction stages, and Strict applied in taking tests through effective monitoring, and support to implement the technical specifications in the project.

Coordination and communication between Stakeholder and PMO, and finding solutions to site problems, by Managing relationships and communications with clients, designer, contractors, supervision consultants, government management and regulatory authorities

Coordinate cross-projects activities, for deciding suitable strategies and objectives, and Submit proposals and recommendations, proportion to the financial of the project, then Apply change.

Planning of project management activities, adopting professional management systems, and compliance to PMO methodologies, and take periodic review procedures for project activities, and reformulate some technical plans to ensure the project completed within the approved time and budget,

preparing lectures and training engineers for the National Water Company, in addition to Lecturer for (design sewage )in the Engineers Authority in Jeddah, and a former lecturer at the University of Aleppo for ( book of sewer water drainage )and (book of environmental engineering), and a teacher at the Technical Institute for (book of Technology of Infrastructure Projects )and (Traffic Engineering)

ENG. MOHAMED SALLAH

PROJECT MANAGER - SENIOR CHIEF DESIGNER

NWC - MEWA - MODON - MUNICIPALITIES - HOUSING

adb1uu@r.postjobfree.com - 009***********

Page 2 of 9

Hydraulic - Hydrology

Stormwter – sewage – water feed w.w.t.p

infrastructure -buildings and government projects

Current Position

PROJECT NAME : DESIGN AND SUPERVISION SERVICES FOR AL JAWHARA RESIDENCE PROJECT

Employer Name : KHATIB & ALAMI

Position : Project Manager

From : September 2019 - Until now

Client : Ministry of housing (MOH )

Estimated Cost : (417.000.000) SR

Location : Jeddah -KSA

PPrroojjeecc

tt OOvveerr

vviieeww aa

nndd RReess

ppoonnssiibb

iilliittiiee

ss::

The development of the Al-Jawhara Residence Project has a gross area of anticipated to be 227,000 m2, In addition to a total of approximately 800,000 m2 of public and service areas.

Design Review of the buildings and Landscape and masterplan, in addition to Design infrastructure networks, roads, potable water, sewage water, stormwater, irrigation, medium voltage cable, and submit to approval.

Coordination among Management of stakeholders as: designer ( khatib & Alami CO.) and Real estate developer and National Housing Company, and Ministry consultant PARSONS, and Main Contractor, Sub-contractors, Suppliers, Local Authorities, other consultants.

Previous Professional Experience

PROJECT NAME : ENGINEERING CONSULTANCY CONTRACTS TO SUPERVISE WATER PROJECTS

Employer Name : MUSTANG AL-HEJAILAN ( WOOD GROUP )

Position : Projects Manager

From : June 2018- October 2019

Client : Ministry of Environment Water and Agriculture (MEWA )

Estimated Cost : (342.500.000) SR

Location : Al-Qassim -KSA

PPrroojjeecc

tt OOvveerr

vviieeww::

Water Projects Manager in Al-Qassim Region, Engineering Consultancy Contracts of two feeding lines and three STP projects, These Contracts are Supervise of Construction of four treatment plants in the towns of Al-asyah, Ayoun al-Jawah, Al-Nabhaniyah, and Shamsiyah . In addation to Two feeding lines To Al-Buraida City, as folwing :

Feeding line No 1 in Al-Qaseem, Length = 62057 m.l of carbon steel, ( 272’034’9 S.R )

Feeding line No 2 in Al-Qassem, Length = 76740 m.l / carbon steel, ( 315’524’213 S.R )

WWTP in towns of Al-asyah, Q= 15000 m3/day, ( 55’027’550 S.R )

Compact WWTP in Al-Baiytha, Q= 600 m3/day, LS tanks, ( 3’199’486 S.R )

WWTP in towns of Ayoun al-Jawah, Q= 18000 m3/day, ( 81’134’089 S.R ) MMyy RReess

ppoonnssiibb

iilliittiiee

ss iiss::

o Management the design review team of the Hydraulic Analysis, structural, mechanical, electrical and chemical design; for three Waste water treatment plant WWTP for Al-Asyah towns and Ayoun al-Jawah town and Al-Baiytha village

o Management the design review team of the hydraulic Design of Feeding line No 2 in Al-Qassem o Studying the obstacles and situations in which implementation of parts of the project is faltering and proposing hydraulic suitable modifications to the design if necessary o Review the Schedule, cost, and quality of the project and ensure that the value of the value engineering is applied in the design of all projects

o Preparing and issuing change orders after the approval of the Directorate. ENG. MUHAMED SALLAH

PROJECT MANAGER - SENIOR CHIEF DESIGNER

NWC - MEWA - MODON - MUNICIPALITIES - HOUSING

adb1uu@r.postjobfree.com - 009***********

Page 3 of 9

Hydraulic - Hydrology - Buildings

Stormwter – sewage – water feed w.w.t.p

infrastructure -buildings and government

projects

o Provide the owner with Suggestions about the best materials, equipment to achieve the lowest costs in operation and maintenance

o Monitoring and evaluating the performance of contractors, and their Targeted implementation ratios, the development of reform plans, and advising in relation to the Stumbling projects o Adoption of managers and project engineers, and Recommend to adoption sub-contractors, and technical submissions, and shop drawings, and method of statement, and monthly invoices, and Bills of modified Quantities And apply the professional management systems (PMO) for MEWA

PROJECT NAME : TREATED SEWAGE EFFLUENT WATER TRANSMISSION LINE - RIYADH

Employer Name : CH2M ( JACOBS )

Position : PMC / Chief designer

From : December, 2017 - Until June 2018

Client : NWC

Estimated Cost : (45.500.000) SR

Location : Riyadh -KSA

PPrroojjeecc

tt OOvveerr

vviieeww::

Supply Treated Sewage Effluent (TSE) from HEET STP South Riyadh to Saudi Aramco’s Riyadh Refinery for non-potable purposes, the minimum flow supply of 11.000 m3 / day and a maximum flow demand of 20.000 m3 / day. For this purpose is necessary to build a new pipeline system, which will include TSE storage tanks, a TSE Pump Station and the corresponding connecting pipeline to the Saudi Aramco Refinery, the Main parts of the PST are:

Left Station (2P Flow 174 L\S and Head 32 m )

Pumping Station (2P Flow 260 L\S and Head 140 m )

three Steel tanks capacity of 30000 m3

three Surge tanks ( capacity of 35 m3, L=10 m, D=2.5m, internal pressuer =2.5 Mpa)

Pressure Ductile pipeline, Diameter of 500 mm, length of 13 km

Discharge Pipe Header, Bypass Line, Flowmeter Chamber, PST Block Valve, Compressed Air Unit, Water Quality Chamber, Transformer shelter, E&I-Container Chamber MMyy RReess

ppoonnssiibb

iilliittiiee

ss aarree::

Design Review the Reports of ( Geotechnical, Hydraulic Analysis, Steel tank calculation, Construction Calculations,Cathodic Protection Packoge )

Assistant Project Manager – and Supervising on Construction works and installation pipeline and HSE Officer, and ( QA-QC ) Engineer too

PROJECT NAME: REQUEST FOR PROPOSAL FOR STUDIES AND SUPERVISION OF THE WATER AND WASTEWATER PROJECTS IN JEDDAH AND MAKAH - TAIF CITIES BUSINESS UNITS ), ( PMO contract)

Employer Name : PARSONS

Position : Senior design Wastewater Engineer / PMO project

From : September 2016 TO December 2017

Client : NWC

Estimated Cost : ( 80.000.000 ) SR

Location : Makah & Taif - KSA

MMyy RReess

ppoonnssiibb

iilliittiiee

ss aarree::

a. Working in Environmental Studies Office of NWC in Taif City, for Design Review Taif projects, Designed by Saudi Engineering Union as the following :

23 Contracts Of Wastewater Network

25 Contracts Of Water Networks

2 Contracts Of Strategic Water Reservoirs capacity each one 300'000 m3

Contract Of Water Pump Station

ENG. MUHAMED SALLAH

PROJECT MANAGER - SENIOR CHIEF DESIGNER

NWC - MEWA - MODON - MUNICIPALITIES - HOUSING

adb1uu@r.postjobfree.com - 009***********

Page 4 of 9

Hydraulic - Hydrology - Buildings

Stormwter – sewage – water feed w.w.t.p

infrastructure -buildings and government

projects

Contract Of Radio Communication Network For Control And Monitoring System b. Design Review the scope of work and documents submitted by Designer consultant (khatib and Alami) as : (Preliminary Design Report), (Conditions of Contract),(Technical Specifications),(BOQ’s),(Final Design Report)

c. Design Review the Calculations and Hydraulic Analysis and Drawings and Master Plan and layout of water and sewer systems and forced mains, and Checked the preliminary cost estimates to the all projects before bidding.

d. Resolve disputes between citizens and NWC, and develop satisfactory engineering solutions for both parties, this falls under the name of Stakeholder Management e. Prepare Design Checklist to all stage of design review (documents, drawing, Sewage water, Water Reservoirs, Pumps Station, )

f. Training courses for NWC engineers about the NWC system requirements and design criteria and Design handly method without softwareand design and modeling Sewer network.

PROJECT NAME : AL-FAISALIYAH MIXING CHAMBER OF DRINKING WATER IN JEDDAH

Employer Name : SAUDI CONSULTING SERVICES - SAUD CONSULT.

Position : Senior Water Resources Engineer /QA-QC

From : June 2015 to September 2016

Client : NWC

Estimated Cos : ( 96.000.000 ) SR

Location : Jeddah

MMyy RReess

ppoonnssiibb

iilliittiiee

ss aarree::

Supervising the construction works of the Drinking water mixing chamber as QA-QC Position to Adoption of the materials submitted by the contractor ( Abu Algadayal ) in addition to the following :

Design Review the construction Drawings Designed by Saudi Engineering Union (Khatib and Alami).

Design Review the Hydraulic Analysis network and Hydraulic Report submitted by (Artelia Co & Sogreah Co) .

PROJECT NAME: 3 PROJECTS IN YANBU CITY CONTRACTED BY YAMAMAH & IAMAR COMPANIES

Employer Name : SAUDI CONSULTING SERVICES - SAUD CONSULT.

Position : Senior Design review Engineer/ Wastewater netwok

From : January 2015 to June 2015

Client : NWC

Estimated Cost : ( 270.000.000 ) SR

Location : Yanbu

MMyy RReess

ppoonnssiibb

iilliittiiee

ss aarree::

Those projects are : (Sewage Water Lines) And (Execution The Main Pumping Stations) And (Raising The Efficiency Of The Main Sewage Pumping Station)

Design review the Hydraulic Analysis for for those three projects, consisting of (total lengths of Pipe networks is 70 km - 5 Pump Stations - 3 Lift Stations)

Design review, Calculations, Shop drawings & as Built drawings, and solve all problems of Infrastructure networks.

PROJECT NAME: DESIGN STORMWATER AND REDUCE THE LEVEL OF GROUNDWATER

Employer Name : SAUDI CONSULTING SERVICES - SAUD CONSULT

Position : Senior Stromwater Design Engineer

From : February 2014 to December 2014

Client : Eastern Province Municipality

Estimated Cost : (400.000.000)SR

ENG. MUHAMED SALLAH

PROJECT MANAGER - SENIOR CHIEF DESIGNER

NWC - MEWA - MODON - MUNICIPALITIES - HOUSING

adb1uu@r.postjobfree.com - 009***********

Page 5 of 9

Hydraulic - Hydrology - Buildings

Stormwter – sewage – water feed w.w.t.p

infrastructure -buildings and government

projects

Location : Dammam

MMyy RReess

ppoonnssiibb

iilliittiiee

ss iiss::

Setting the initial study to link the second design stage with the first stage implemented, By studying the level and diameters of the outfall, And study the variable groundwater level, n addition to linking the new area points with the old regions and unifying the benchmark point

Design and modeling stormwaterLines for Dammam and Dhahran and Al Khobar, with Unlimited software (SewerGems V8i), the Catchment area was 100 km2, and Design lift stations with capacity of 20,000 m3/h ; those Network lines are set Taking into account Topography of the Earth a by GIS and All existing and future Utilities networks, of water, drainage, electricity, petroleum, telephone and mobile networks, which we obtained from government departments. Develop the Preliminary Design Report of the project strategy, and all proposed scenarios.

Study the Catchment and porosity and the impermeable stratum and infiltration and groundwater flow and interflow, and interference of wells, and the overland flow and perennial stream and surface runoff

Study the quantity of stormwater by Rational method, input the Return Period 10-25 years in the IDF graphic curve to know the Rainfall intensity. take into consideration the time on concentration is 5-10 mints and the suitable factor of surface runoff for each area, from Manning formula the result is the Diameter of pipe

Prepare calculations and hydraulic analysis of scenarios proposed of stormwaterflows, to reach the lowest possible cost in terms of pipe size and coverage.

PROJECT NAME : DESIGN INFRASTRUCTURE INDUSTRIAL CITIES IN KSA

Employer Name RADICON GULF CONSULT

Position : Senior Utility Design Engineer

From : February 2012 to January 2014

Client : MODON

Estimated Cost : (unknown) SR

Location : Al-Khobar

MMyy RReess

ppoonnssiibb

iilliittiiee

ss aarree::

Those cities are : (Women's industrial city in Al Hasa, area of 500,000 m2) and (Industrial city in Dohrma, area of 5,000,000 m2) and (The 4th industrial city in Jeddah, area of 5,000,000 m2)

management of the Design team to Study and locate all existing Or proposed of the owner like Water facilities, Water Reservoirs, and Fire facilities, and Stormwater facilities, and Irrigation facilities

Preparing the Diagram of the water flow, drink water net, sewer water net, stormwaternet, and irrigation lines, to control the demand of future sewage water, and the capacity of STP.

management of the Design team to prepare Infrastructure Reports, like (Concept Design - Roads - electricity - surface System of StormwaterDrainage - Potable and Fire Water Distribution System - Wastewater Collection and industrial Wastewater Collection System - Irrigation System - Landscape Design ).

PROJECT NAME: STORMWATERAND ROADS PROJECTS, NEAR BEACHES AND DOCKS

Employer Name : AL-HABSHI & INFRASTRUCTURE IAMMAR CONTRACTOR CO

Position : Projects Manager Of StormWater Projetc

From : March 2010 to January 2012

Estimated Cost : ( 70.000.000 ) SR

Client EASTERN PROVINCE MUNICIPALITY

Location : Khobar - Dammam

MMyy RReess

ppoonnssiibb

iilliittiiee

ss aarree

:

ENG. MUHAMED SALLAH

PROJECT MANAGER - SENIOR CHIEF DESIGNER

NWC - MEWA - MODON - MUNICIPALITIES - HOUSING

adb1uu@r.postjobfree.com - 009***********

Page 6 of 9

Hydraulic - Hydrology - Buildings

Stormwter – sewage – water feed w.w.t.p

infrastructure -buildings and government

projects

Execution stormwater Lines long to 12km from GRP pipes Diameter of 400 to 3000 mm, and catch basin, and Manholes Depths to -12 m, and Build Pressure Line / Diameter of 1200mm Long 800 m, and Horizontal directional drilling ( HDD) with two pipes Diameter 1100 mm long 60 m .

Execution box and Pipe culverts under the road, to transfer water to the Artificial Lake,

Execution Highway near Bahrain Bridge, on the coast directly, with attention to the existing marine docks, seemed as fingers in the sea, and Build a new marine pavement with new docks for expanding the width of the existing road to 60 m width along 7 km, by Backfill the sea with Boulder and Pitching.

PROJECT NAME: PROJECTS OF ENGINEERING UNIT CONSULTING IN ALEPPO UNIVERSITY

Employer Name : THE ENGINEERING UNIT AT ALEPPO UNIVERSITY

Position : Senior Principal Design Engineer

Company Location : Syria -Aleppo

From : March 2003 to February 2010

MMyy RReess

ppoonnssiibb

iilliittiiee

ss aarree

DDeessiiggnn

EEnnggiinn

eeeerr ffoo

rr tthhee

ffoollllooww

iinngg pprr

oojjeeccttss

:

11-- DDee

ssiiggnn oo

ff MMiixx

NNeettwwoorr

kkss sseeww

eerr wwaatt

eerr aanndd

SSttoorrmm

wwaatteerr

Design Of Mix Network For Sewer Water And StormWater and Torrents For Four Villages In IDLIB.

Design Of Mix Network For Sewerwater And StormWater of Hittin Housing Town . 22-- DDeess

iiggnn ooff

AAuuttooss

ttrraaddaa

AAlleepppp

oo AAll--RR

aaqqaahh CC

iittyy (

4488..0000

00..000000))

$

Participation in study and design highway project from Aleppo City to Al-Raqah City Length of 186 km,

Study The Drainage Of Floodwater In Low-Lying Areas, And Study Pipe Culvert, And Box Culvert, And Siphons In The Necessary Places.

Structural Study Of A Number Of Box Culvert About 30 With Multiple Dimensions, Class (12 Slots X 3m X 3m) To ( 2solts X 1m X 1m) ; To Divert Flood Water And Torrents . 33-- LLeecc

ttuurreerr

aatt FFaacc

uullttyy oo

ff CCiivvii

ll aanndd

AArrcchhiitt

eeccttuurraa

ll EEnnggii

nneeeerriinn

gg

Books of Environmental Engineering - sewage water - Traffic Engineering

PROJECT NAME: CHECK ENVIRONMENTAL INDUSTRIAL DRAWINGS

Employer Name : SYRIAN ENGINEERING SYNDICATE

Position : Senior Environmental Consultant Engineer

Company Location : SYR- Aleppo

From : January 2007 to February 2010

MMyy RReess

ppoonnssiibb

iilliittiiee

ss aarree::

Check the environmental requirements for the industrial projects for a license

PROJECT NAME: COMPLETION 47 VILLAS

Employer Name : AL- AFRA CONTRACTING

Position : Site Civil Engineer

Project Location : UAE -Abu Dhabi

From : January 2000 to February 2003

PROJECT NAME : MANUFACTURE STEEL HANGAR AND COOLING & RESERVOIRS

Employer Name : KRAYEM INDUSTRIES CO

Position : Construction Engineer

Company Location : Syria - Aleppo

From : November 1997 to January 2000

ENG. MUHAMED SALLAH

PROJECT MANAGER - SENIOR CHIEF DESIGNER

NWC - MEWA - MODON - MUNICIPALITIES - HOUSING

adb1uu@r.postjobfree.com - 009***********

Page 7 of 9

Hydraulic - Hydrology - Buildings

Stormwter – sewage – water feed w.w.t.p

infrastructure -buildings and government

projects

Qualifications

Education

BSc. Degree In Civil Engineering - Environment Engineering / Complete : Aleppo University, On 10-1997

Post-graduate Diploma In Environment Engineering / Complete : Aleppo University, Syria On 11-2000

Scholarship - Master In Environment Engineering / Not complete : University of Padova, Italy On 2001

Scholarship - PHD study in traffic engineering, / Not complete : Government Penza University, Russia, On 2006, The title of the PhD thesis is " Modeling traffic flows in the Syrian Arab Republic "

Computer Software Skills

1 Ms Office

2 Autocad 2002

3 Sewer Cad 5.5

4 Sewer Gems V8i

5 Storm Cad V8i Saudi Consulting April 2014

6 Water Cad V8i Saudi Consulting June 2015

7 Land disktop Syrian Engineering Syndicate October 2011 8 Staad Pro

Professional certificates

1. Primavera Khatib Center August 2004

2. Project Management Professional AlKhawarizmi College July 2016 3. OSHA Safety : Transport Safety Udemy June 2016

4. OSHA Safety : PPE Udemy June 2016

5. How to Run Professional Meetings Udemy June 2016 6. COURSES IN INFORMATION SECURITY, HSE AND HAZARD JACOBS CH2M 2018 7. COURSES IN PROJECTS MANAGEMENT (POM) PARSONS 2016

Professional registration

I. Saudi Council of Engineers : Membership (189 650), Professional Engineer, Validity up to 26-4-2022 II. Syrian Engineering Syndicate : Membership (61 807) Consultant Environmental Engineer Member of the Environment Committee

III. Syrian Computer Society : Since 1998, Level of Participation: active Engineer Best regards

Engineer Mohamed Sallah

KSA - Jeddah

Telfon : 009**-*********

Emai : adb1uu@r.postjobfree.com

ENG. MUHAMED SALLAH

PROJECT MANAGER - SENIOR CHIEF DESIGNER

NWC - MEWA - MODON - MUNICIPALITIES - HOUSING

adb1uu@r.postjobfree.com - 009***********

Page 8 of 9

Hydraulic - Hydrology - Buildings

Stormwter – sewage – water feed w.w.t.p

infrastructure -buildings and government

projects

IMAGE FILE

1. Signing a contract to implement the Al-Jawhara Residences project in Jeddah توقيع عقد تنفيذ مشروع مساكن الجوهرة ريزيدنس في جدة https://twitter.com/jawharaResidenc/status/1201583130920017920 ENG. MUHAMED SALLAH

PROJECT MANAGER - SENIOR CHIEF DESIGNER

NWC - MEWA - MODON - MUNICIPALITIES - HOUSING

adb1uu@r.postjobfree.com - 009***********

Page 9 of 9

Hydraulic - Hydrology - Buildings

Stormwter – sewage – water feed w.w.t.p

infrastructure -buildings and government

projects

2. Minister of Housing, Majed Al-Hugail, visited the Al Jawhara Residence project in Jeddah زيارة معالي وزير الإسكان الى مشروع الجوهرة ريزيدنس https://twitter.com/jawharaResidenc/status/1188474983032524801 3. The head of the northern sector of the water company Ibrahem Burqabh inspects projects under implementation in Al-Qassim

رئيس القطاع الشمالي بشركة المياه م إبراهيم برقيبة يتفقد المشاريع الجاري تنفيذها بالقصيم hhttttppss::

//aajjeell

.ssaa//vvSS

55rrmm22//



Contact this candidate