Post Job Free

Resume

Sign in

Civil Engineering Manager

Location:
N Mydukur, Andhra Pradesh, India
Posted:
February 27, 2020

Contact this candidate

Resume:

CURRICULUM VITAE

Name : B.C.P.VENKATA SUBBAIAH

E-mail : adb0my@r.postjobfree.com

Qualification : Surveyor and Estimator and B.Tech (Civil Engineering)

Experience : 20 Years & 02 Months.

Career Objective:

A result driven, competent civil engineering professional with 20 years & 02 months experience in highways/Expressways, Railways, Airports and Industrial Civil Engineering Works. Seeking a challenging assignment as Project Manager or any other suitable post in a reputed firm involved construction/general engineering works.

Task assigned in this project:

Tasks and responsibilities of the “Senior Construction Manager” shall include but not limited following:-

Supervision of construction activates of Earthwork, GSB, WMM, and Bituminous work DBC & BC & Blanketing, Ballast.

Preparation of working drawings, cross-sections with auto plotter & auto cad.

Preparation of work programmer and its close monitoring at site on day –to-day basis.

Checking the field tests and quality control measures during the construction at site.

Supervision of construction activities of earth work in embankment, morrum with sand blanketing and spreading of ballast and lining of track (Tamluk-Digha new railway line 60km. from Contai to Digha, west Bengal).

Calibration of the equipment’s at field for the various activities related

Preparation and implantation of methodology of construction activities.

Maintaining record set of drawings of Road works and cross-drainage works.

Measurements of completed activities and works in progress.

Verification of lines /levels/inspection of the various activates related to the work time to time.

Final inspection of works and checking of the as built drawings of the completed structural works.

Key Qualification:

Had over 14 years of Experience in National Highways road works & 2 years’ Experience of canal works and 4 years’ Experience in Railway works.

Had experience of working as a Senior Manager in TATA PROJECTS LIMITED In

Western Dedicated Freight Corridor, Package CTP-13, Sachin-Vadodara, at Gujarat.

Had experience of working as a Manager in AFCONS INFRASTRUCTURE LTD in Six laning Agra to Lucknow Express Way package-IV between K.M.172+500 to 236+500 K.M in Uttar Pradesh.

Had experience of working as a Construction Manager in CONTINENTAL ENGINEERING CORP. in four laning of N.H-7, Package C-13, Anantapur, Andhra Pradesh.

Had experience of working as a “Senior Engineer” and Assistant “Construction Manager” in LARSEN & TOUBRO ECC in four laning of NH-7Kothakota – Jedcherla in Andhra Pradesh and International Airport, Shamshabad in Andhra Pradesh and four laning of NH-4 Satara – Kolahapur in Maharashtra.

Had experience of working as a “Senior Engineer” in NCC in four fourlaning of NH-2 Sasaram – Dehri – on – Sone, Section Package No: IV – C in Bihar.

Had two years’ experience in earth works, Site grading work, Railway embankments, Concrete pavements, Box culverts, Pipe culverts and drains.

Has through understanding and experience of modern construction technology / machines and Project Management Systems

Has experience of MORTH specifications. IS and IRC Coads and international best practices and extensively applied these in the construction of four laning of National Highway Projects.

Employment Record

(1). TATA PROJECTS LIMITED (SECUNDERABAD),

Name : Sachin to Vadodara Railway Project in Gujarat.

Project Value : 2500 Crores.

Client : Western Dedicated Freight Corridor Corporation of India

Limited (WDFCCIL).

April, 2018 to Till Date.

PROJECT EXPERIENCE: WDFC CTP-11, Deployed as “Senior Manager” for ex-

ecution and Co-ordination of Formation work- Embankment, Sub-Grade, Blanketing,

& Cutting (Hard Rock), & Planning and Monitoring of the above Projects.

(2). AFCON INFRASTRUCTURE LIMITED (SAPOORJI&PALLONJI), MUMBAI

Name : Agra – Lucknow Expressway Project, Package – IV (4545).

Project Value : 2000 Crores.

Clime : Uttar Pradesh Expressway Industrial Development Authority.

Jan 2016 to February, 2018.

PROJECT EXPERIENCE: Six laning from Agra to Lucknow Express Way .

Package-IV between K.M.172+500 to 236+500 K.M in Uttar Pradesh.

Deployed as “Manager” for execution and co-ordination of Earth Work, laying GSB, WMM,D.B.M, and B.C and Preparation of Cross Sections Drawings, Planning and Monitoring of the above Projects.

(3). PROGRESSIVE CONSTRUCTION LIMITED, HYDERABAD.

Dec2013 to Dec2015.

Project Experience: RMC-6 (Polavaram Project)

Deployed as “Deputy Project Managers” for Execution and Co-ordination of Canal Execution, Lining, Structural works, Quality and Safety with in time work Completion.

(4).CONTINENTAL ENGINEERING CONSTRUCTION, ANANTAPUR.

Dec 2007 to March 2009

PROJECT EXPERIENCE: Four laning and strengthening of the existing two lane section between km336.00 to km 376.00 on N.H-7 in Andhra Pradesh.

Deployed as “Senior Construction Manager” for execution and co-ordination of Earth Work, laying GSB, W.M.M, D.B.M and B.C and Preparation of Cross Sections Drawings, Planning and Monitoring of the above Projects.

(5).LARSEN & TOUBRO ECC, CHENNAI.

Dec 2003 to Oct 2007.

PROJECT EXPERIENCE: Four laning and strengthening of the existing two lane section between Kothakota to Jedcherla on NH-7 in Andhra Pradesh.

AND

PROJECT EXPERIENCE: GMR International Airport main access road, Shamshabad in Andhra Pradesh.

Name : Hyderabad International Airport Project.

Project Value : 450 Crores.

Client : GMR Hyderabad International Airport Limited.

AND

PROJECT EXPERIENCE: Four laning and strengthening of the existing two lane section between Satara to Kolhapur on NH-4 in Maharashtra.

Name : Rehabilitation and Upgradiation Satara –

Kolhapur Section of National Highway – 4 between Km 668.0 to Km 697.0

Project Value : 120 Crores.

Client : Maharashtra state road Development

Corporation.

Deployed as “Senior Engineer”, “Assistant Construction Manager” for execution and co-ordination of Earth Work, laying GSB, W.M.M, D.B.M, and B.C and Preparation of Cross Sections Drawings, Working Drawings, Planning and Monitoring of the above Projects.

(6).ECI ENGINEERING & CONSTRUCTIONCO.LTD, HYDERABAD.

Mar 1997 to Nov 2003.

i) June 2002 to Nov 2003 (NAGARJUNA CONSTRUCTION COMPANY, HYD)

Project: Four laning and Strengthening of the existing two lane section between KM 110 to KM 140 on NH-2 (Construction Package IV-C) in Bihar GTRP/6.

Deployed as “Senior Engineer” for execution and Co-Ordination of earth works, laying of Geotextile, G.S.B, W.M.M, D.B.M and B.C and Preparation of Cross-Section Drawings working drawings, planning and monitoring of four laning and strengthening of the existing two lane section from KM 110 to KM 140 on NH – 2, Bihar. The project Dehri-On-Sone to Sasaram town of 21 Km’s Length. New Road Bridge over Sone River of 3.2 KM Length, two minor bridges, six under passes 17 RCC Box Culverts and 36 RCC Hume Pipe Culverts NP-4.

ii) Jan 2000 to Feb 2002.

Project: Tamluk – Digha New Rail Line Project, Contai, Midnapur, (WB).

Alignment of track.

Construction of earth embankments, blanketing & spreading of ballast.

Lining of track.

Checking the center line of track & formation level for each layer

Conducting the field test for MDD & OMC.

Lying of pipe culverts & Construction of Box culverts.

Curve setting with the theodolite.

iii) March 1999 to Jan 2000

Project: Numligarh Refinery, Numligarh, Gologhat, (Assam).

Construction of internal roads 20 Km’s

Construction of cross-drainage work’s

Preparation of Monthly Running bills & final bills.

Preparing & checking the sub-contractor bills.

iv) Mar 1997 to March 1999

Project: Jindal Vijayanagar Steels Limited, Toranagallu, Bellary (Karnataka)

Supervision of construction activities of earthwork embankment, GSBC, WMM, DBM & as per specifications for state Highway work.

Checking the field tests and quality control measures during the construction.

Maintaining records & set of drawings of road works

Cutting & filling of earthwork including Soft rock, Hard rock with blasting, chiseling & control blasting.

Checking the cutting & formation level.

Conducting the field & lab tests

Maintaining drawings, lab test records & field record for each layer according ISO 2001.

Construction of pipe culverts, pipe culverts with encasing, Box culverts, Slab culvers, Sub-Ways, Retaining wall & Drainages.

(7).NAGARJUNA CONSTRUCTION COMPANY LIMYTED, HYDERABAD.

Feb 1996 to March 1997.

Project: Kiga Nuclear Power Project, Mallapur, Karnataka

Deployed as “Assistant Engineer” execution following nature of works:

Cutting & filling of earthwork including Soft rock, Hard rock with blasting, chiseling & control blasting about 33 lakhs cubic meter.

Checking the cutting & formation level.

Conducting the field & lab tests.

Maintaining drawings, lab test records & field record for each layer according ISO 2001.

Construction of pipe culverts, pipe culverts with encasing, Box culverts, Slab culvers and Retaining wall.

Preparation of working drawings, bar bending schedules & shuttering arrangements.

Construction of compound wall about 4 KM`s.

Preparation of Monthly running bills and final bill for client.

Checking the sub-contractor bills.

(8).SRINIVASA CONSTRUCTION PRIVATE LIMITED, HYDERABAD

Dec 1993 to Jan 1996

Project: SRBC Right Branch Canal, Beeravolu, Banaganapalli, Andhra Pradesh.

Deployed as “Quantity Surveyor” execution following nature of works:

Execution of Earth work and lead the Survey team in Fixing Alignment Theodolite.

Preparation of Running Bills.

Maintain quality & safety of works.

CERTIFICATION

I, the undersigned certify that to the best of my knowledge and belief, this bio-data correctly describes myself, my qualification & my experience.

(B.C.P. VENKATA SUBBAIAH)

APPLICANT

PERSONAL DETAILS

Position Applied : Senior Position (Highways &Railways&

Industrial Civil Engineering Works)

Name : B.C.P. VENKATA SUBBAIAH

Name of Present Firm : TATA PROJECTS LIMITED

Profession : Project management

Date of Birth / Age : 10THJan, 1969 / 50 Years.

Academics : 1) Intermediate Vocational Course (SURVEYOR

AND ESTIMATOR)

2) B.Tech (Civil Engineering).

Experience : +20 YEARS

Marital Status : Married

Family size : Self + Three

Emoluments Drawn : Rs: 1,26,000/- (CTC)

+Site Allowances: Rs: 30,000/-

Emoluments Expected : Negotiable

Mailing Address : B.C.P. VenkataSubbaiah

D.NO.6-325-12-5,

Vinayakanagar,

Proddatur Road,

Mydukur (Post&Mandal) – 516 172

Kadapa (Dist) A.P

Mobile No. 096********.

Mailing Address : adb0my@r.postjobfree.com

Contact Number : 096********

Computers : Microsoft Word & Excel.

Nationality : Indian

Languages Known : English, Telugu, Hindi

1. Passport Details :

Pass port no : R5910714

Date of issue : 06/10/2017

Date of Expiry : 05/10/2027

2. Driving Licence :

Driving Licence no : AP10420190033269

Date of issue : 05/12/2019

Date of Validity : 09/01/2019



Contact this candidate