Resume:

Rhonda Mumford

Jackson, SC *****

Cell: 803-***-****

E-mail: ********.***@*****.***

Summary

Senior Designer with extensive experience in electrical design with 22 years of experience with strengths in walk downs, electrical schematics, conduit and cable tray routing, instrumentation and controls, fire and notification systems, SafeGuards & Security Systems, and single-line diagram development. Experience in Civil, Structural, and Architectural discipline work. Proficient with mechanical design including Piping & Instrument Design (P&ID), Flow Diagrams, Process Drawing Layout Sections & Details. Experienced in MicroStation, IRASB (MicroStation overlay), AutoCAD, Edison (Cable Routing program), PDMS, SmartPlant Review with Plant Pilot for PDS 3D modeler, Oracle, AIMS and E-Z Pipe, BlueBeam Revu, knowledgeable of Pro E. Excellent in MS Office skills & other work related software.

Education

Aiken Technical College 06/95 – 06/97

Associate Degree in General Technology

Minor in Occupational Technology w/ an emphasis in Industrial Drafting

Diploma in Industrial Drafting

Certificate in Computer Graphics

OSHA – 10 hour 12/15

Experience

Aerotek at Applied Control Technologies 10/04/18 – 06/07/19

Provided design support, as a subcontractor to a company for SCE&G. Design for electrical connection and elementary diagrams using Microstation and AutoCad. Project Management for projects, in which, includes management of drawing files and file management for incoming and outgoing drawings. Conceptual design for electrical systems for new design, new limit switches added to the Saluda River and Santee Cooper Dam, for SCE&G.

Aerotek-Facilities Engineer at Flex 10/04/17 – 06/23/18

Analyze facility products or equipment specifications and performance requirements to determine designs which can be produced by existing manufacturing or processing facilities and methods. Analyzes engineering proposals, process requirements and related technical data pertaining to industrial facilities machinery and equipment design. Determines feasibility of designing new plant facilities equipment or modification of existing facilities considering costs, available space, time limitations, company planning and other technical and economic factors. Use Computer Aided software, such as AutoCad 2018 to design and implement engineering changes to the facilities product. Lead projects and project teams to perform engineering tasks. Take measurements, perform calculations, order materials for new client product lines. Maintains safety and ensures compliance with electrical codes (NEC, OSHA, etc.)

Quality Plus Services 2/17 – 05/18/17 Electrical and Piping Cad Designer

At AmbioPharm, which is a pharmaceutical facility, I Perform walk downs for new piping design, create new piping isometric sketches from my field measurements. Create sketches for the piping contractor to use as they run pipe in the field, using AutoCad and BlueBeam Revu. Coordinated work with piping foreman, interpreted P&ID’s and plan drawings for the piping foreman. While the pipe fitters were fabricating pipe, I coordinated with the pipe foreman, the field measurements needed to match the fabricated fittings.

At EZGO I performed field walk-downs for a new Electrical cabinets. Created a new panel layout and wiring diagrams for client use, using AutoCad and BlueBeam Revu. While sitting in the fabrication shop I created drawings for special machined parts for the plant.

Owens Corning Fiberglass I performed a field walk-down, took measurements for a Civil/Structural handrail for the overhead crane, using AutoCad.

Spectrum Engineering Services 12/14 -7/23/16 Electrical Designer IV

I was the only employee for Spectrum Engineering on the Potash jobsite, which this jobsite is a Chemical Fertilizer Plant. While at Potash I worked Civil, Structural, Piping and Electrical disciplines for Spectrum. Maintained all files, records and project drawings, including transmittals, Scope’s of Work and coordinated all work for Spectrum. I performed a field walk-down to determine if the Urea Tower was structurally safe, which included taking measurements, sketches and pictures for documentation, help perform calculations with the Civil/Structural Engineer. I designed a Civil/Structural handrail for the Urea Tower that was a Safety Factor. I designed a Civil/Structural Platform in the Nitrogen Plant, which included handrails, stairs, bollards and Concrete. I designed a four story tall Civil/Structural platform for the Silencer, which included handrails, stairs and a platform that is Safe for the Workers. The building I work out of was the fabrication shop. Walk-down for the whole site for the Triconex cabinets, which included tracing all wiring to all special instruments and controls in the field to ensure the wires were connected to the correct circuit in the Triconex Cabinet. Created Loop sheets for the Triconex Cabinet for all new instruments. I walk-down the existing Triconex in the C-002 ACID plant and traced all the wiring to every instrumentation and controls, while preventative maintenance was being performed and help locate the instruments that I designed for a new Silencer. Walk down of all the panels (seven new panels) for the DEF Rail Loading, created new drawings from my walk-down and field sketches, created loop sheets from the sketches. Created a DEMO/Construction packages for cables, cable tray, lights, receptacles, power panels and fiber panels, block diagrams, window schedules, schematics and single line diagrams, connection drawings, block diagrams, wiring drawings. Worked with the contractor’s to ensure everything was coordinated with Potash site Engineering Supervisor’s and Spectrum. Walked-down the entire UREA Plant Panels for a New GE MCC Control Room. Took measurements of panels, instruments getting physical locations for them; so they could be re-located to New GE MCC Room. Did the layout drawing for all panels and located them on the plan view, using MicroStation and BlueBeam Revu. Created Bill of Materials for all panels worked on. Did walk-downs for the entire plant for Pressure Relief Valve’s and associated piping, did Isometric sketches applied to new site drawings in AutoCad and BlueBeam Revu. Conceptual design for new Contractor’s Building, which involved new design for a substation, new disconnect switches, new transformers all to be coordinated with Georgia Power and site engineering. All work done is used per NEC 2014 and standards.

HIPP Engineering 09/13 -12/14 Electrical and Piping Designer

Walk-down for new CCTV security camera’s and the PIDAS fence for the new design on Potash property. Design and drafted P&ID’s and apply changes to the Loop diagrams, Panel Schedules, Cable schedules, Design cameras motion detection, and access control, schematics, single-line diagrams, read blueprints, back-checked all of the P&ID’s against the Loop Diagrams. Also, helped the team by using a conversion program that I found that converts .pdf files to .dwg drawings to ensure project came in way under budget. Checked all P&ID’s to ensure that all drawings related to the project reflect the changes that were done by walk down. Resolved problems found on P&ID’s and associated drawings. Walked-down a Caustic Acid room took measurements and helped place all the piping on the drawings for the project, coordinating the work with our home office, did most of the drawings in Isometrics layout, walked heat trace project and coordinated all the drawings with the home office. Wrote specification sheets for the Heat Trace Job.

Lowes 05/13 -06/14 Sales Specialist

Appliances Specialist at Lowe’s in Aiken, SC, with outstanding performance in Sales of all Appliances with sales exceeding expectations, Very Customer oriented, Team Leader in helping others to communicate with customers, Invoice using a DOS based program, interact with delivery to ensure customers are getting the correct orders they need, invoice install sales, LRT Gun, palm pilot, planograms, coordinate with other departments to ensure that the customer is getting all the help needed to perform all tasks needed to complete their projects. Down stock all appliances for customers and using a forklift.

The Shaw Group (CB&I) 02/09 - 07/12 Electrical Designer Engineer IV

Savannah River Site; Mox Shaw/Areva Mixed Oxide. Provided design for Safeguards and Security systems new project support for E3S requirements as well as CCTV, intrusion detection, motion detection, and access control. Input cables (using specification sheet and the NEC), cable tray, conduit and wire ways using a program called Edison. Conducted field walk-downs, took measurements and sketched the equipment, power panels, cable tray, to ensure it was placed in the correct spot on all drawings and placed in Edison. Wrote “Engineering Change Request.” Design logic diagrams, conduit and cable tray routing drawings, schematics, single-line diagrams, cable schedules, created ‘Engineering Change Request’ for work package revisions and additions. Checked electronic and manual cable block diagrams, single-line diagrams, vendor prints, and schematic drawings, cable schedules using the IEEE Standards and project procedures. I attend meetings to ensure all procedures and specifications for the packages I worked on were correct. I checked other Engineering groups packages and coordinated with all redline mark-ups, using a translator from France. Created bill of materials, specifications, Engineering Change Request, using the IEEE standards. Checked work packages for my boss using all procedures and standards.

Wal-Mart 05/08 - 2/09 Grocery Department Manager

Manager at the Wal-Mart in Aiken, SC. Very Customer oriented, Team Leader in helping others to communicate with customers, ordered grocery department items, took inventory, planograms, LRT Gun, coordinate with other departments to ensure that the customer is getting all the help needed to perform all tasks needed to complete their projects. Down stock all appliances for customers and using a forklift.

ACTS Incorporated 05/06 - 12/06 Electrical Designer Engineer IV

Westinghouse Savannah River Company Safeguards and Security Modifications. Provided design for existing changes to electronic Safeguards and Security systems (E3S) and new project support for E3S requirements as well as CCTV, intrusion detection, motion detection, balance magnetic switches, PIDAS and access control. Provided drafting assistance incorporating Design Change Packages (DCP), Design Change Notices (DCN), Design Change Forms (DCF) and redline comments to both electronic and manual drawings. Field-walk downs, prepared sketches and created new drawings. Provided design for re-routing and installation of new fiber optic cables and the installation of new associated equipment for site network upgrades using the IEEE Standards and project procedures.

Lockwood Greene 09/05 -04/06 Electrical Design Engineer III

Electrical discipline group working on drawings such as Electrical Schematics, Instrumentation and Controls, Logic and

Loop Diagrams, Fire Detection and Notification Systems, Ground and Lightning Protection Systems, Conduit and Cable Tray Routing, Lighting Layouts, and Single Line Development. Drafting assistance provided on all blanket task orders (all disciplines) incorporating (DCP), (DCN), (DCF) and redline comments to both electronic and manual drawings. Provided design for re-routing and installation of new fiber optic cables and the installation of new associated equipment for site network upgrades. Field walk-downs, prepared sketches and created new drawings. Performed lighting calculations using Lithonia VISUAL Professional Lighting software program using the IEEE Standards and project procedures

.

Pro2Serve Technologies 01/01 - 09/05 Electrical Designer

Provided design for existing changes to electronic Safeguards and Security systems (E3S) and new project support for E3S requirements as well as CCTV, intrusion detection, motion detection, and access control. Electrical discipline group working on drawings such as Electrical Schematics, Instrumentation and Controls, Logic and Loop Diagrams, Fire Detection and Notification Systems, Ground and Lightning Protection Systems, Conduit and Cable Tray Routing, Lighting Layouts, and Single Line Development. Drafting assistance provided on all blanket task orders (all disciplines) incorporating Design Change Packages (DCP), Design Change Notices (DCN), Design Change Forms (DCF) and redline comments to both electronic and manual drawings. Field walk downs, prepared sketches and created new drawings. Provided design for re-routing and installation of new fiber optic cables and the installation of new equipment for site network upgrades. Input cable and raceway into PDMS program.

Sandia National Laboratories (SNL) Building #836, #960 and #840

Vault Type Room Expansion, Provided Title II and Title III Support for updating of client drawings- Building #960, Lighting Improvements, used MicroStation J cad files for updating drawings and utilizing client raster drawings. Replaced all fluorescent fixtures and added new switches. -Building #840 Machine Shop.

Los Alamos National Laboratory

PF-4 Unpacking Room, TA-55 Switchgear Upgrades Generated new multidiscipline drawings, new schematic drawings, and updated client drawings.

Westinghouse Savannah River Company

Westinghouse Savannah River Company Safeguards and Security Modifications Blanket Task Order. Provided design for existing changes to electronic Safeguards and Security systems (E3S) and new project support for E3S requirements. CCTV, intrusion detection, motion detection, and access control. Field walk downs and created sketches in the field so I could create new drawings.

H-Area Building 234-7H

Provided Title II built-to-print design of life storage enclosure, environmental chambers, and over exhaust hoods. H and F Area Tank Farm and Surrounding Areas Lighting Improvements. Prepared schematics detailing control of lighting fixtures via hand-off-auto switch photocell. Field walk-downs to prepare new drawings from my measurements.

Building 703-44A

Uninterruptible Power Supply Replacement Provided design support for preparation of DCP to upgrade existing uninterruptible power supply (UPS) system for building. Field walk downs and created sketches in the field so I could create new drawings. Took measurements for all the panels, cable tray, and conduit in the MCC and the battery back-up room.

Parsons Savannah Services 01/97 - 01/01 Associate Cad Designer Westinghouse Savannah River Company

Provided Design support for all disciplines on the blanket task order. Provided design support for Heat Trace System for High Level Waste F-Tank Farm Service Piping Upgrades Projects. Assisted in site walk downs for field verification to ensure design was constructible prior to final design. Provided design support for upgrades to the existing Fire Detection System in the Effluent Treatment Facility (ETF) in 241-81H. Initiating devices, notification appliances, auxiliary relays, and alarm points between fire detection panels. Provided design support for a new Programmable Fire Detection System in 735-A and 735-11A. Assisted in the design of initiating devices, notification appliances, and shutdown controls for the existing HVAC system. Provided electrical and instrumentation design support for the Tritium Administration Facility in 246-H. Assisted in the design of the electrical distribution system, manual initiated fire protection occupant notification, fire detection, lighting communications, ground and lighting protection systems. Provided design support for the installation of a new Programmable Fire Detection System, lighting system, grounding system, power system, and communications system in 703-44A.

Provided design support for the following projects at WSRC:

F-Tank Farm Temperature Recorder Upgrades, Electrical and Instrumentation Upgrades of 105 and 108 K & L Instrument Air Upgrades, Building 299-2H Compressor Cooling Water Systems Upgrades, Electrical and Instrumentation design and specification for building 241-49H & 241-64H Air Compressor Upgrades, Lighting and Receptacle Design in the Tritium Administration Facility and ROBOF Compressor Buildings 244H and 245H, Responsible for the electrical and instrumentation design, construction support, PDMS input, card status reports and start-up support for storm water upgrades in H-Area tank farm.



Contact this candidate