Resume

Sign in

Engineer Civil

Location:
Coimbatore, Tamil Nadu, India
Salary:
As per norms
Posted:
November 06, 2019

Contact this candidate

Resume:

CURRICULUM VITAE

Name : VRP. RAJA

Date of Birth : 09.06.1963

Father’s Name : V.R.Perumalsamy (Late)

Passport No. :J 0477231

Religion/Caste : Hindu / Telungu Chettiar.

Nationality : Indian

Native Place : Chittode (Erode Dt)

Address No 8 Sundara Apartments

56 Seerangapalayam Road

Salem – 636 007 Tamil Nadu, India. Mobile : 094***-*****

Email : adarty@r.postjobfree.com.

EDUCATIONAL QUALIFICATION

DEGREE

INSTITUTE

UNIVERSITY

YEAR

B.E. (Civil)

S.T.J.Institute of Technology, Ranebennur.

Karnatak University, Dharwad.

1989

Training attended : PMP Preparatory Training at Synergy School of Project Management, CADD Centre, Mylapore, Chennai

Computer skills : MS Office, MS Project, STAAD.Pro and Auto CADD

Languages Known :Tamil, English & Kannada

Professional Experience : 26 Years

WORKING EXPERIENCE

Employer

From

To

Designation

Hindustan Dorr-Oliver Ltd, ( A leading EPC Co) Mumbai & Chennai

Jan 2012

Till

Senior Manager – Projects Civil

Aker Solutions, Aker Power Gas Pvt Ltd, Mumbai (A leading Basic Engg., FEED, PMC and EPCM Co based in Norway and Offices at Mumbai & Pune)

April 2010

Dec 2011

Lead - Civil Engineer

Working as a Civil Consultant for Dalmia Cement (Bharath) Ltd Dalmiapuram, Trichy Dt

Oct 2009

March 2010

Civil Engineer

Working as a Civil Consultant for The Madras Aluminium Co Ltd, (A Group Company of Vedanta Resources, UK) Mettur Dam, Salem Dt

April 2006

Sep 2009

Civil Engineer

Jayam Consultants Pvt Ltd, Chennai

August 2004

March 2006

Project Engineer

Self Employed

Nov 2003

July 2004

-

SRC Projects Pvt Ltd, Salem (NHAI/ Road Contractor)

Sept.2001

Oct 2003

Sr. Engineer

SIV Industries Ltd., Sirumugai (Manufacturers of Rayon Yarn, VSF, Pulp)

April 1995

Sept . 2001

Junior Engineer

(Civil-Projects)

Mukesh & Associates, Salem

Jan 1995

April 1995

Site Engineer

T.C.Raghavan&Co, Salem

July 1994

Dec 1994

Site Engineer

R.Balakrishnan & Associates, Erode

Jan 1991

May 1994

Site Engineer

Arkie Consultants, Erode

July 1988

Dec 1990

Site Engineer

PROJECTS EXECUTED

Design & Construction Management for Fluid Catalyst Cracking Unit, Fluegas Desulphurization Unit, LPG Merox Unit, Jetfuel Merox Unit, Gasoline Merox Unit and Caustic Storage Unit for Cuddalore Refinery Project, Nagarjuna Oil Corporation Ltd., Cuddalore. Works includes foundation, super structure and Erection of Equipments for Reactor regenerator, Main column, Wet gas compressor, Absorber area, MCBS, Main air blower area, Steam drum, Catalyst hopper area, Plant air compressor area, Pipe Racks, Splitter area, Stripper area, Switch house, FAR, Underground drain drum.

Qty of concrete 31500cum Reinforcement steel 3400MT Structural steel 2800MT

Client : Nagarjuna Oil Corporation Ltd., Cuddalore.

PMC : CB&I Lummus Crest Mauritius

Client’s Representative : Construction Management Team

EPCM (V2 Construction) : Aker Solutions, Aker Powergas Pvt Ltd, Mumbai

Contractor : Petron Engineering Construction Ltd, Mumbai

PROJECTS ESTIMATE

Total Estimated cost of the project : Rs.211 Crores

Estimated cost of the civil works : Rs. 68 Crores

Construction work for Civil, Mechanical, Electrical & Instrumentation work for Niobium Thermite Production Facility Plant for Nuclear Fuel Complex at Hyderabad. Project Estimate Rs 30 Crores

Design Engineering Procurement Supply, Construction, Erection Testing and Commissioning of two streams of Sea Water RO Plant of 30m3/h capacity on Turnkey Basis and operation and maintenance of the Plant at Zirconium Complex, Pazhayakayal, Tuticorin. Project Estimate Rs 14 Crores

Ash dyke work (with LDPE Lining), Ash recovery system, Pipe line supports,

Drains, Buildings & Plant Roads at 1x250MW LFPP-STCMS ELECTRIC COMPANY, UTHANGAL, Neyveli

Construction of 1x25MW Coal based Captive Power Plant (TG Deck, Boiler Foundations) at The Madras Aluminium Co Ltd, Mettur

Admin office interior modification work / Alumina plant painting, Road work, Secured Land fill (SLF), Dry Scrubber Plant (FTP), Tilting table structure at Foundry for MALCO Plant & CSR/Clinic Building, Sewage Treatment Plant and Plastifelt work for quarters roof for MALCO Colony.

ARRS Multiplex/Shopping Malls (with 5 Cinema theatres) at Salem

General Managers’ Apartments and Plant Road for Dalmia Cement (B) Ltd Dalmiapuram Trichy

Widening to four lanes and rehabilitation of existing two lane Carriageway of Salem Byepass of section (NS/12) NH – 47 from Km. 199.20 – Km.207.60)

Widening to four lanes and rehabilitation of existing two lane Carriageway of Kancheepuram-Walajahpet of section NH – 04 from Km. 88.000 – Km. 107.242 (as a Project Coordinator)

Nuclear Power Corporation works at Koodankulam (as a Project Coordinator)

Second floor at Head Office building for SRC Projects (P) Ltd Salem

Spinning mill construction work at Dharapuram for M/s.AswinTextiles Pvt Ltd., Tirupur

Discharging area (Hot Rolling Mill) for The Salem Steel Plant at Salem.

EFFLUENT TREATMENT PLANT AT SIV INDUSTRIES LTD., SIRUMUGAI

Oxygen Activated Sludge Process Reactor Tank

(Design given by Linde Ag,Germany)

Primary Clarifier (Design given by Linde Ag, Germany)

Oxygen Plant (Design given by Linde Ag, Germany)

Neutralization tank with acid resistant tile lining

Lamella Clarifier Pump pits Equipment foundations

Control Centre for the above works

MCC rooms, Transformer yard, Sub-station extension work

29m Dia. Secondary Clarifier / 20m Dia. Thickener

12m Dia. “ECONCL” Clarifier

Irrigation pump house for pulp plant coloured water

630mm dia. HDPE pipe line supports (Bridge work) for irrigation work.

PULP PLANT AND RAYON PLANT AT SIV INDUSTRIES LTD, SIRUMUGAI

Pulp plant coloured and non coloured effluent drain segregation modification work with acid resistant tile lining

Coloured effluent storage tank at CS2 plant

Rayon plant exhaust gas duct rehabilitation work

ANTI CORROSIVE PAINTING FOR THE ABOVE WORKS.

Sugar mill machinery foundation works, Distellery buildings and machinery

foundation works for Salem Cooperative Sugar Mills Ltd., at Mohanur, Salem

Coal mill building & foundations and Drying yard for The India Cements Ltd., Sankari, Salem Dt.

Residential, Official buildings, Commercial complexes & School buildings at Erode.

KEY ROLES AND RESPONSIBILITIES

Ensure completion of civil works according to project specifications and complying with engineering standards and all relevant national, international codes and standards

Review of quality plan, get it approved by client and its implementation

Review of method statements of work and get it approved by client

Review of Inspection and Test Plan and its implementation

Regular monitoring of quality of works and its control by issuing NCR if required

Conduct regular site audit

Monitor progress of works ensuring timely completion within budget

Provide technical advice regarding design, construction and program modifications

Liaise with PMC

Coordinating with Project team, Consultants and Contractors

Project planning, budgeting, preparation of Bill of Quantities and execution of work

Drawing verification, layout checking, bill checking, bill preparation

Fixing of Sub-Contractors, Controlling and handling the man power

Preparation of Tender Documents and related papers

Tender drawing quantity calculation for tenders cost estimates

Planning and scheduling of work

Receiving & checking of RA bills

Quantity reconciliation for material / labour / equipment utilization

Preparation of bill of material

Receiving & Processing of progress reports from site office

Preparation of profiles Maintaining updated records of work completed/to be completed/BOQ value/operative value of every contract Checking piece rate contractors bill for payment

Procuring of Project site materials

ISO Coordinator (In SRC Projects (P) Ltd at Salem)

Preparation of tenders and BOQs

Maintenance of Industrial, Office, School buildings, Quarters, STP and ETP (Civil works)