Saturday, May, ****
Dear Sir:
I would like to submit my CV in your esteemed organization as per my line experience and qualification detailed.
In brief, I am working as an MEP Engineer in PREMIER INTERNATIONAL PROJECTS L.L.C.
I have successfully completed b-tech degree in mechanical engineering. Honesty, Dedication, Hard Work and Discipline are four core values and hallmark. I have learnt to anticipate, innovate and above all I am extremely flexible in whatever work I accept, thereby I believe I can prove to be an asset to any organization where I am employee I would appreciate the opportunity to validate my claims and discuss the possibilities of starting a career with your esteemed organization. Should you also feel that I am qualified of your interest and would welcome an opportunity to meet you personally? Thank you and await your valuable consideration and look forward to hear from you soon. Sincerely,
Krishnaprasad PV
Krishnaprasad P.V
******@*****.***
Sohar, Oman
Page 2 of 7
KRISHNAPRASAD P.V
Address: Krishna Nivas, Lakkidi Near Railway Gate, Palakkad (Dist),-679301 Phone: +91-860*******, +968********; Email: *****************@*****.*** To secure a position where hard work, dedication and the ability to acquire new skills will fetch the advantage to any company I work for, and also to bring the potential of my firm to stand up tall.
‘Recognized for driving Growth and Profits in highly technical environments’ ACADEMIC QUALIFICATION
• B.TECH degree in Mechanical Engineering, Nehru College of Engineering and Research Centre, Thrissur,
University of Calicut (2010).
• Higher Secondary Certificate, Seventh Day Adventist Higher Secondary School, Ottappalam, Palakkad,
Kerala Govt State Board (2006).
• Secondary School Leaving Certificate,
NSSKPT V.H.S.S, Ottappalam, Palakkad,
Kerala Govt State Board (2004).
WORKING EXPERIENCE (8 Years 00 Months)
Position Company Country From To
MEP Engineer Premier International Projects LLC Oman May-2014 Till date Mechanical Engineer Gujarat NRE Coke Limited India Apr-2011 Apr-2014 Page 3 of 7
• AG/UG Piping fabrication, welding and erection.
Experience in Brief
• Familiar with piping materials such as CuNi, PPR, HDPE, GI (SCH-40), CPVC, UPVC, HPVC, MS(seamless), GRP & RTR piping.
• Familiar with butt fusion welding for HDPE pipe joining.
•
•
Water Supply, compressed air line, oil line, Drainage and Storm water
•
Fire Fighting (SprinklerSystem,FM200,DelugeSystem,Hydrant, Hose reel & Extinguisher)
•
Installation & commissioning of Fire pump (Jockey, Electric driven & Diesel engine)
•
HVAC LAYOUT making and execution in site as per client and consultant approval.
•
Ducted AC work execution in site as per approved drawing.
• Preparation of external & internal shop drawings (fire fighting, water &,drainage) Inline duct fans and diffusers Layout making and execution in site
• Preparing as-built drawings as per site condition.
• Sanitary installation (Wash Basin, Mixers, EWC, Bathtub, Jacuzzi, Rain Shower etc.)
• Preparing gas pipe line drawing as per the ROP approval and executing in site.
• LPG tank and vaporizer installation and commissioning.
• Burner installation and commissioning for heating oven.
• Boiler installation and commissioning for galvanizing plant.
• Compressor with dryer and chiller installation and commissioning.
• Cold water transfer pumps installation and commissioning.
• GRP tank installation and commissioning.
• Executing the fabrication and erection work as per the shop drawings.
• Inspecting the welded portion in pipes as well as in the beams, columns and supports with senior engineer and consultants.
• Selection of sprinklers as per the temperature inside the buildings.
• Pumps skid alignment and rotation checking while fixing in proper location.
• Implement / follow up the work as per quality manual, quality plan and approved QCP, ITP, WPS & PQR.
• Proper follow up for technical queries raised.
•
• Follow up of fabrication, inspection, installation, testing and pre-commissioning according to clients standard specifications.
Pump, water heater and sanitary items selection, materials, fittings and valves quantity take off and execution of installation, testing and commissioning of water supply pipeline, drainage pipe line, water tank, water heater, booster pump, transfer pump, etc
• Review, line checking and approve the test pack for test from subcontractors,
• Coordinate with clients & consultants for solving issues in mechanical services, plumbing design and specifications.
• Forecasting and updating resources and material requirements and monitor utilization.
• Conduct quality training as per requirement,
• Develop and maintain an effective quality management system.
• Prepare/Review QC documents, procedures, quality reports and compilation of as-built.
• Attending daily tool box talk on daily basis
Page 4 of 7
• Participating quality Audits and quality & HSE walk about.
• Proper arrangements of documents for both internal & external ISO checking.
• Preparing Measurement sheets for the bill.
Company#1 : PREMIER INTERNATIONAL PROJECTS LLC
Client : MOHAMMED SAUD BAHWAN TRADING LLC
Local Consultant: DESIGN UNIT ENGINEERING, OMAN
Main Consultant: APO INC, JAPAN
Project : JAPANESE VILLA, OMAN
Position : MEP ENGINEER
• PROJECT: - Oman Antimony Roaster Plant Project.
Projects Handled
CLIENT: - Strategic & Precious Metals Processing LLC. CONSULTANT: - Worley Parsons.
MEP Works, Pump Installation, Piping (GI, SS, CS, PP & PPR) & HVAC
• PROJECT: - New Age International LLC.
CLIENT: - Mohammed Saud Bahwan Trading LLC, Oman.
CONSULTANT: - Design Unit Engineering.
• PROJECT: - Vehicle
MEP Woks, Fire Pump Installation, HVAC.
CLIENT: - Mohammed
Distribution Center Phase-2.
Saud Bahwan Trading LLC, Oman.
CONSULTANT: - Design Unit Engineering.
• PROJECT: -
MEP Woks, Fire Pump Installation, HVAC.
CLIENT: -
Vehicle Distribution Center Phase-1.
Mohammed Saud Bahwan Trading LLC, Oman.
CONSULTANT: - Design Unit Engineering.
• PROJECT: -
MEP Woks, Fire Pump Installation, HVAC.
CLIENT: -
Saham Souq MEP Works.
Ministry Of Regional Municipality & Water Resource, Oman.
• PROJECT: -
MEP Woks, Fire Pump Installation, HVAC.
CLIENT: -
Powder coating plant.
Dunes Industries LLC, Oman.
CONSULTANT: - Semak & Partners LLC.
• PROJECT: -
MEP Woks, Mechanical Equipment Erection, HVAC.
CLIENT: -
Galvanizing plant,.
Dunes Industries LLC, Oman.
CONSULTANT: - Semak & Partners LLC.
• PROJECT: -
MEP Woks, Mechanical Equipment Erection, HVAC.
CLIENT: -
Guard rail plant.
Dunes Industries LLC, Oman.
CONSULTANT: - Semak & Partners LLC.
MEP Woks, Mechanical Equipment Erection, HVAC.
Page 5 of 7
Duties and Responsibilities
Assistant engineer for Piping fabrication shop and fabrication of all kind of piping materials Preparing daily and weekly reports to the management and review the progress Preparation of three week look ahead schedule and compare with the actual progress Monitoring the piping erection activities at site
Monitor the progress, man hour and equipment working hours. Responsible for the co-ordination of the projects by combining all the available resources in the optimum way to achieve the goal.
Execution of plant piping erection activities
Modification and replacement of various piping system. Preparing HVAC layout as per client requirement and submit the shop drawing for approval. HVAC work execution in site as per the approved shop drawing. Responsible for punch listing and clearing the pretest items prior to testing the test packs. Responsible for the execution of Tie-in works and preparing method of statement. Monitor and coordinate with safety officers for safety evaluation on site and prepare reports. To extract the necessary data from engineering drawing for the fabrication and erection of piping.
Preparation of daily progress report and raising RFI for inspection of the work. Preparation of measurement sheets for every monthly bill. Preparation of method of statement for the shutdown and related tie – in of new piping with existing lines.
Preparation of weld map and release for pre fabrication of spools. Monitoring the fabrication & erection work for above ground and Underground piping with support erection followed by pre-test punch listing, release for Hydro and pneumatic testing, reinstatement and achieve MC punch clear as per planned schedule. Piping of materials such as, RTR (GRE & GRV), CPVC, HPVC, UPVC, HDPE, COPPER and GI threaded lines.
Site survey for identifying the work front prior to the initiation of the work & to maintain the realistic production schedule throughout the working period. Company#2 : Gujarat NRE Coke Limited,
Position : Mechanical Engineer
Duration :
•
Apr 2011 – Apr 2014
•
Working of Belt Press
•
knowledge in pipe line works
•
Impact Crusher operations.
•
Controlling the Vibrating Screens.
•
Ability to control the Dual Extracting Column cell [DEC].
•
Maintenance of Compressor and Disc Filter.
•
Stamping Machine maintenance.
Maintenance of War man pumps.
Page 6 of 7
•
Production Responsibility
•
Ensuring proper resource management per machine and proper Time Sheet follow up.
•
Review daily Production Reports and ensure their correctness in order to enable a good handover of shifts.
•
Develop Responsible for proper Start Up process Operation at the beginning of each shift.
•
Service the machine run ability during trials and report it to the senior manager.
•
Ensure a proper transfer of information during the shift change.
•
Co-Ordinate with the quality control department in order to ensure the application of all the quality procedures.
•
Maintaining daily consumption report and give it to the senior manager
•
Supervise the machine run ability during trials & report it to the senior Manager
•
Follow up achievement of set goals for production team & assign tasks & deadlines to each individuals
Co-Ordinate with the maintenance department to ensure a proper preventive maintenance of on all machines.
•
Maintenance Responsibility
•
Planning the maintenance schedule and report it to the senior manager.
•
Indenting the machine parts timely.
•
Timing punctuality while doing maintenance.
Weekly report of general maintenance of machines i.e. lubrication, v-belts etc. should be maintained.
OTHER CREDENTIALS
• Computer Engineering Packages: AUTOCAD and IRONCAD
•
.
Operating System Knowledge:
•
Windows 7/XP/2000/98
Computer Languages with respect to Mechanical Engineering:
•
Windows C and C+
Knowledge in Heating
•
Ventilation and Air Conditioning System
Knowledge in Boiler that used for producing Electricity from Coal. KEY SKILLS
•
•
Ability to take up challenges and to meet the expected deadlines.
•
Ability to initiate and innovate.
Confident and optimistic
Page 7 of 7
PROJECTS OVERVIEW
• Mini Project on Design & Study of Vibration Absorber. Abstract: -
•
The purpose of the Vibration absorber is to arrest the vibrations. When an absorbing mass-spring system is attached to the main mass and the resonance of the absorber is tuned to match that of the main mass, the motion of the main mass is reduced to zero at its resonance frequency.
Main Project on Aerodynamic Design of Silent Aircraft. Abstract: -
•
A three dimensional air frame design methodology for low noise emission and high fuel efficiency, based on a blended –wing body type aircraft. Here we are using constant distinctive theory. For designing purpose we use pro–e and for analysis we use ansys.
Formatted and Conducted a Workshop on ‘Aerodynamic Devices for Heavy Vehicles. Abstract: - The main aim of the report is to point out the various techniques that can be employed for the reduction of drag in heavy vehicles. PERSONAL DETAILS
Date of Birth: 17th April, 1989
Marital Status: Married, Male
Languages Known: English, Hindi, Malayalam and Tamil. Other Interests: Nature, Wildlife, Travel, Camping, Reading, Listen to Indian film Music. Location Preference: Anywhere.
PASSPORT DETAILS
Passport No: K2514783
Date of Issue: 08/02/2012
Date of Expiry: 07/02/2022
Place of Issue: MALAPPURAM