Post Job Free

Resume

Sign in

Engineer Project

Location:
Chennai, Tamil Nadu, India
Posted:
November 04, 2019

Contact this candidate

Resume:

M.SENTHIL MURUGAN

Mobile: +91-994*******

Email: adaq8h@r.postjobfree.com

SUMMARY,

• Experienced PROJECT ENGINEER specialised in Estimation and Budgeting, BOQ, Variation order preparation and Client Billing and FQP documents maintaining.

• Proficient Knowledge in Estimation of Quantities, Scheduling & Planning, Client Billing, Reconciliations, Cost Analysis and Budgeting.

• Good at taking Quantity Estimation by means of MS Excel and maintaining documents & drawings.

• Excellent communication and Inter personal skills to interact individuals at all levels.

EXPERIENCE

1. Senior Engineer in KSA POWER INFRA P LTD, Chennai DEC- 2018 - STILL NOW A. Project Details: 33/220 KV Pooling Sub station in 300MW WIND FARM AT BHUJ, GUJARAT. Project Name: 300 MW WIND FARM AT BHUJ

Clients: ALFANAR ENERGY PRIVATE LIMITED & SENVION WIND POWER LLP

• Responsibilities of duties as newly started project as Land developing like contour surveying, FGL fixing, cutting and filling and preliminary arrangements

• Client Billing, Sub-contractors billing twice a month.

• Preparing & Scheduling of the Works and making it achieved.

• Preparing Bar bending schedule and measurement checking as per drawing

• Rate Analysis of Additional works and various order preparations.

• Maintenance of Daily work progress report & Daily labor report.

• Maintenance of German standard all FQP register like that civil bulk material consumption, wage register and documentation.

• All materials test reports are preparing as per client requirements FQP current revision and IS code verification.

2. Project Engineer in BWI PROJECT INDIA PRIVATE LTD, Chennai JUN 2015 NOV 2018 B. Project Details: 400/220 KV Sub station bay extension work with 500MVA Auto transformer

Project cost: 250 CRORE

Project Name: Arasur ( Coimbatore ), Karaikudi substation Clients: TEBA Energy india private limited - POWER GRID CORPORATION INDIA LTD B. Project Details: 110KV Digital Substation, 16MVA and 25 MVA Transformer - New substation India first digital substation

Project cost: 150 CRORE

Project Name: Trivandrum - Kerala

Clients: ABB INDIA LIMITED HITCO

C. Project Details: 400/220 KV Sub station bay extension work with 500MVA Auto transformer

Project cost: 200 CRORE

Project Name: Kalivanthapattu, Trichy and Pugalur substation Clients: EMCO LTD, POWER GRID CORPORATION INDIA LTD Designation: Project Engineer

• Increasing my growth about sub station work which means I will completion like this sub station work wherever without hindrance and short duration, I had perfectly done three various location substation in very short period.

• I learned short ideas how do complete in easier in substation in from our continuous projects.

• Client Billing, Sub-contractors billing twice a month.

• Preparing & Scheduling of the Works and making it achieved.

• Preparing Bar bending schedule and measurement checking as per drawing

• Rate Analysis of Additional works and various order preparations.

• Maintenance of Daily detailed report & Daily labor report.

• Maintenance of power grid standard all FQP register like that civil bulk material consumption, wage register and documentation.

• All materials test reports are preparing as per Power grid FQP current revision and IS code verification.

3. Project Engineer in BWI PROJECT INDIA PRIVATE LTD, Chennai August 2014 may 2015 Project Details: A Residential Flat with Proposed Stilt + 4 Floors Building at K.K.Nagar, Chennai.

Project cost: 12 Crores

Clients: Mr. Ramanujam, Mr. Sethu Raman, Mr. Veera Raghavan, Mr. Srinivasan Designation: Planning and Project incharge

• measurement of quantities Working in Estimating & Billing Department, which involves Monthly Client Billing, Estimation of Quantities as per Architect Drawings

& Specifications, Rate Value Analysis, Bill of Quantities, Monthly Planning and Budget, Estimate and Rate Analysis for Non-Tendered Items.

• All civil activities monitoring and execution

• Increasing labors workmanship with proper arrangements

• Preparation of Bar Bending Schedule as per the Structural drawings & specifications by means of MS Excel.

• Physical and tracking the productivity.

• Responsible for Planning, Daily and Monthly Progress Report Entries, Monthly Construction Program, Monthly Achievement and Reconciliation. 4. Project Engineer in BWI PROJECT INDIA PRIVATE LTD, Chennai October 2013 July 2014 Project Details: EFFLUENT TREATMENT PLANT

Project cost: 10 Crore

Client: M/S Berger paints, Pondicherry

Designation: Project Engineer

• Experienced in Estimation of quantities for each items of work as per drawings, Preparation of BOQ, tender Estimate and Preparation of Rate Analysis.

• Daily labours activities arrangements and monitoring

• Monthly bill preparation as per site measurements.

• All structures are marking and build up as per drawing with zero percent fail

• Gained good Knowledge in Quantity Estimations, Client Billing and Rate Analysis

& BOQ Preparation.

5. Project Engineer in ENGINEER ESTATE PRIVATE LTD, Chennai May 2011 August 2013 Project Details: Residential apartment G+4 Floor

Project cost: 8 Crore

Client: Promoters own construction

Designation: Site Engineer

• All civil activities monitoring and execution

• Various types of works are handling with one hand control

• Increasing labors workmanship with proper arrangements

• Preparation of Bar Bending Schedule as per the Structural drawings & specifications by means of MS Excel.

Physical and tracking the productivity

6. Diploma Trainee in GKN DRIVELINE INDIA LTD, Chennai June 2009 April 2011 Project Details: Industrial building construction of PRECISION FORGING PLANT Project cost: 200 Crore

Client: GKN DRIVELINE INDIA LTD

Designation: Diploma Trainee

• Comparison between the Steel and Concrete and to conclude the economical one was the Key point of the Project.

• Discipline of work to be execute all kind of civil part

• Utility maintenance and fire fighting system activities monitoring

• For Concrete Estimation of the quantities for each item like Deck slab, Girders, Wearing coat with the steels and Costing in Unit rate.

• For Steel Quantities estimation for I Section, Kerb, Deck slab along with Galvanised Iron pipe, Piers and Abutment and Costing in Unit rate.

• Conclusion We came to know by using Concrete, the Structure is of Economical for the Construction in Cost wise.

EDUCATION,

Diploma civil Engineering 2006 - 2009

Arulmigu palaniyandavar polytechnic college,

Palani, tamilnadu.

TECHNICAL SKILLS,

• Software Exposure : Auto CAD,MS Office

• Area of Expertise : Execution & Billing

ACHIEVEMENTS,

• Presented for innovation award in the field of environment held in GKN DRIVE LINE INDIA LTD 2009-2010

PERSONAL DETAILS,

Current Position : As a Project Engineer in BWI PROJECT INDIA PVT LTD Parents Name : Mr.S.Mariyappan,Mrs.M.Muniyammal

Date of Birth : April 10th 1989

Marital Status : Married

Languages Known : English, Hindi & Tamil

Permanent address : No: 4 /16, iruthayarajapuram north 3rd cross street, Ahimshapuram 8th street extension, sellur,

Madurai 625002, Tamil nadu

Bank Details : Name : M.SENTHIL MURUGAN

Acc.no : SB14833

BANK : IOB

Branch : south masi street

REFERENCES - Available on request.



Contact this candidate