Title Position: Civil QA/QC Engineer
Name: Ahsan Ayaz Siddiquee
Date of Birth: April 8, 1992
Citizenship: Pakistani
PROFILE SUMMARY
I have more than 8 years of experience in construction. I am a professional Civil Engineer having working experience with top construction companies of UAE and Pakistan. I worked in various construction projects including 468 Nakheel Villas, Nad-Al-Shiba Nakheel Mall and World’s 7th Largest Jamia Masjid Bahria Town Lahore. I am Proficient in Project Planning, Scheduling, Building Construction and Management. My objective is to explore the dynamics of a challenging career in a fast track organization by reshaping my knowledge of Engineering and integrated skills. My corporate mission is to meet the needs of employer through technical excellence and innovative solutions. EMPLOYMENT RECORD
Period Name Of Organization Position Held
July 2016 To Date Metac General Contracting Co LLC Civil QA/QC Engineer Jan 2014-jun 2016 AL-Wassy-Ul-Badi Interior (Pvt) Ltd Site Engineer July 2012-Dec 2013 Bahria Town (Pvt) Ltd Site Supervisor July 2011-June 2012 Dascon Construction Company Asst Surveyor/Site Supervisor WORKING EXPERIENCE
Project Name Duration Company Name/Location/ Position Held Construction of Nad-Al-
Shiba Nakheel Mall
Jan - 2019
Till date
Company Name: Metac General Contracting Co LLC
Location: Nad-AL-Shiba, Dubai, UAE
Position Held: Civil QA/QC Engineer
Activities Performed:
Perform all daily inspection test of the scope and character necessary to archive the quality of construction required in the drawings and specifications for all work under contract performed ON and OFF site.
Maintain sequence of construction required under any activity.
Discuss QA/QC issues as a separate agenda during site review meetings with staff.
Carry out inspection and checking for all quality related procedures in the site and ensure activity at the site are as per approved method statement and inspection test plan.
Coordinate with the consultant’s representative and site In-charge for inspection and meeting about quality problem including the closure of Non-Compliance Reports.
Report to the QA/QC Manager, control, and monitor all activities related to quality Management System (QMS).
It is the prime duty to hold any activities not complying with the approved standard and specifications.
Inspection of Formwork and Reinforcement work for piling, pile cap, foundation etc. prior to concrete and giving clearance for concrete works.
Inspection of excavation, compaction and Field Density Test (FDT) prior to start next activity.
Monitoring the concrete poring work including air content test, slump test and temperature of concrete.
Project Name Duration Company Name/Location/ Position Held Construction of 468
Nakheel Villas Nad-Al-
Shiba
July – 2016
to
Dec - 2018
Company Name: Metac General Contracting Co LLC
Location: Nad-AL-Shiba, Dubai, UAE
Position Held: Civil QA/QC Engineer
Activities Performed:
Prepare the snag list for the completion of the project.
Responsible for the laboratory work of concrete.
Ensuring that all tests are carried out on time and in full.
Making inspection request of the project.
Keeping quality documentation up to date,
Maintain the cubes test reports results.
Making material inspection request and maintain the record of this.
Ensuring activities in the quality plan are carried out.
Making the submittal of test reports results and submit to the consultant. Project Name Duration Company Name/Location/ Position Held Renovation of Home &
Offices Islamabad
Jan – 2014
to
June - 2016
Company Name: AL-Wassy-Ul-Badi Interior
. (Pvt) Ltd
Location: Islamabad, Pakistan
Position Held: Site Engineer
Activities Performed:
Supervision for floor polish, Wall paint, Wood work, Electric work and plumbing work etc.
Running Estimate of Material During Construction.
Keeping work areas clean during and after work.
Directing the work men on quality, Cost and time aspects.
Check labor bills and subcontract bills.
Running Estimate of Material During Construction.
Making Progress Report of The Project.
Layout of The Project.
To Read the technical specifications on daily basis and check with engineer for clarification.
At the area of work, extracting maximum labor output and progress, with utmost priority to quality and aim for zero wastage of material.
Project Name Duration Company Name/Location/ Position Held Infrastructure Sector ‘F’
Bahria Town Lahore
Jan – 2013
to
Dec - 2013
Company Name: Bahria Town (Pvt) Ltd.
Location: Lahore, Pakistan
Position Held: Site Supervisor
Activities Performed:
Examine the material to ensure that it is viable for the health of the environment.
Running Estimate of Material During Construction.
Complete the project with the finest quality.
To examine the work with the standard building at an expert level.
Making Progress Report of the Project.
Project Name Duration Company Name/Location/ Position Held Civic Center Bahria
Town Lahore
July – 2012
to
Dec - 2012
Company Name: Bahria Town (Pvt) Ltd.
Location: Lahore, Pakistan
Position Held: Site Supervisor
Activities Performed:
Examine the material to ensure that it is viable for the health of the environment.
Making & Checking Bar Bending Schedule.
Running Estimate of Material During Construction.
Making Progress Report of The Project.
Layout of The Project.
Complete the project with the finest quality.
To examine the work with the standard building at an expert level. Project Name Duration Company Name/Location/ Position Held World’s 7thLargest Jamia
Masjid Bahria Town
Lahore
Canal Bridge
July – 2011
to
June - 2012
Company Name: Dascon Construction Company
Location: Bahria Town Lahore
Position Held: Asst. Surveyor/ Site Supervisor
Activities Performed:
Layout of The Project.
Keeping work areas clean during and after work.
At the area of work, extracting maximum labor output and progress, with utmost priority to quality and aim for zero wastage of material.
Making Progress Report of The Project.
Making & Checking Bar Bending Schedule.
WORKING TECHNICAL INSTRUMENTS
Auto Level
Theodolite
Training of Total Station
EDUCATION
Name Of Institute Name of Degree Years Lahore
Trakhees Dubai UAE Trakhees Accreditation Program (Orange Code) 2019 Preston University of
Islamabad
BS TECHNOLOGY (HONS)
(Civil Engineering)
FREEZE
Nicon Group of
Colleges Rawalpindi
AUTO CAD 2D & 3D 2015
Punjab Board of
Technical
Education, Lahore
Diploma of Associate Engineering
(D.A.E Civil Engineering)
2011
Board of Intermediate
& Secondary
Education, Lahore
Secondary School Certificate (S.S.C) 2008
ADITIONAL SKILLS
Work proficiency in
o Windows XP, Windows 7 & 10
o MS Word
o MS Excel
o Internet Browsing
Excellent spoken and written Skills, Problem Solving, Time Devoted, Self-motivated, Result- oriented, Positive Attitude, and Ability to manage and communicate with a wide range of people. PERSONAL INFORMATION
Father’s Name: Muhammad Ayaz Siddiquee
CNIC # 35404-1353803-3
Marital Status Single
Address: Flat #15-E, Askari Scheme III, Chaklala Scheme III, Rawalpindi
Contact No: +92-(0-314-******* - +971-(0-52-605**** Email Address: ****************@*****.***