Post Job Free

Resume

Sign in

Sr Instrument Engineer

Location:
Qibla, Kuwait City, Kuwait
Salary:
3500 - 4000 USD pm
Posted:
October 30, 2019

Contact this candidate

Resume:

CURRICULUM VAITE

BANDA VENKATA SUBRAHMANYAM E-Mail: adapwi@r.postjobfree.com

Mobile: 009**-********(Pri) 0091-988-***-****

PROFILE:

Senior Instrument Engineer with proven track Record of 21+ years’ experience in oil & gas and power plant with expertise in all aspects of Instrumentation construction to commissioning/start-up.

Worked with MNC oil majors namely Total, Babcock Arabia, AGIP, Repsol, Technip, Brunel (for Statoilhydro), Hyundai E&C for international oil & gas projects.

Able to work with different project managers at different locations.

Committed for company HSE policy Have closely followed HSE aspect in Saudi Aramco, ADNOC, Total, AGIP, STATOIL (offshore top sides) projects. Worked on PTW system in ARAMCO, ADNOC & others.

Worked with various commissioning/project software i.e. ProCoSys (Statoil), HPCM (Hyundai E&C), PetroPCS (Petrofac) with systemization of project.

Current Employment:

Presently I am working with JGC for CFP (KNPC) commissioning activities in capacity as Function Test Chief for function testing of plant controls from Jan, 2018 and related punch list management.

Employment History:

1. Period : Dec, 2014 to Aug, 2016

Company :GS Engineering & construction Co.

Designation :Senior Manager – Instrumentation

Project: Karbala Refinery Project (KRP), Iraq (150,000 MTA crude refining capacity)

Responsibilities: Construction

Instrument document review & Scheduling including man power requirement

Engineering/client/Vendor coordination

Site management for instrument construction activities.

2. Period : June, 2012 to April, 2014

Company : PETROFAC INTERNATIONL LTD.

Designation : Senior Commissioning Engineer (Instrumentation)

Project : Gas Sweetening Facilities project, Dukhan, Qatar Petroleum

Responsibilities: Commissioning

To Follow-up with construction for getting Mechanical completion certificate (MCC) system/sub-system wise.

Co-ordination with client/vendors/sub-contractors for pre-commissioning/commissioning activities.

Responsible for Preparation/getting approval of commissioning procedures

Monitoring of Preparation of loop folders/Function test folders including associated check lists.

Review & fulfilling requirements of dossiers MCC, RFC, RFSU.

Develop pre-commissioning & commissioning procedures.

Performing SAT procedure for ICSS & 3rd party package PLC systems.

Scheduling of commissioning activities on basis of project system/sub-system basis.

Coordinate with engineering/DCC for red line mark-up (RLM) of ILD / C&E charts for final As-Built including PetroPCS( project completion system) updates for all drawings & documents.

3.Period : June, 2010 to May, 2012

Company : Hyundai Engineering & construction co.

Designation : Senior Pre-commissioning Engineer(C & I)

Project : Karan gas processing facilities (sweetening, Dehydration, conditioning) of capacity 1800 MMSCFD gas for Saudi Aramco, KSA.

Responsibilities : Commissioning

Follow-up with construction for getting Mechanical completion certificate (MCC) system/sub-system wise.

Responsible for Preparation/getting approval of commissioning procedures

Monitoring of Preparation of loop folders/Function test folders including associated check lists.

Review & fulfilling requirements of dossiers RFC, RFSU.

Scheduling of commissioning activities on basis of project system/sub-system basis.

Performing SAT procedure for ICSS & 3rd party package PLC systems

Responsible for completion activities related to pre-commissioning/commissioning.

Coordinate with engineering/DCC for red line mark-up (RLM) of ILD / C&E charts for final As-Built for all drawings & documents.

Coordination with completion software HPCM administrator for uploading instrument documentation including verification of documents in HPCM.

4.Period : Feb, 2008 to Aug, 2009

Company : Brunel Energy, Dubai for STATOIL HYDRO

Designation : Instrument Engineer

Project : Top sides for three off-shore platforms of 1000 MMSFD each, South pars gas field, Phases 6, 7 & 8, Iran off-shore.

Responsibilities: Construction

Construction of Topsides at on-shore fabrication yard

Hook-up activities of Topsides at offshore platforms.

Closing of punch lists for achieving MCC

Coordination with completion software Procosys administrator for uploading instrument documentation.

5.Period : Feb.2007 to Jan,2008

Company : Cegelec, Abudhabi for Total E&P Yemen

Designation : Instrument Supervisor –commissioning

Project : Kharir & Atuf oil fields development, East Shabwa, Block 10, Yemen

Responsibilities : Commissioning

Commissioning of oil & gas well head instrumentation including electro Hydraulic systems.

6.Period : Sept.2003 to Oct.2006

Company : J & P (O) Ltd (Clients: AGIP, Repsol Oil Operations)

Designation : Instrument Engineer

Project : NC174, NC186 oil fields (Sahara Desert) in Libya consisting of oil gathering stations, GOSP, OHTL, Pipe lines, water injection etc.

Responsibilities : Construction/QaQc

Construction activities of switch yard.

Bench calibration of all project instruments with certified test equipment as required.

Construction activities of oil & water gathering stations and GOSP plant with zero LTI.

Coordination with Engineering & QA/QC for completion of required documentation for achieving MCC

Scheduling of construction activities to meet project mechanical completion(MC) dates

7.Period : Nov.2001 to Mar.2003

Company : Hyundai Engg. & Const. Co. (Client: Total Fina elf)

Designation : Instrument Engineer

Project : Gas plant and utilities in south pars gas fields development projects Ph. 2&3 in Iran. The capacity of plant is 80,000 BPD condensate, 2000mmscfd gas, 4*30MW GTG & 4*70 T/H boilers for STG & process steam

Responsibilities : commissioning / start-up Maintenance

Follow-up with construction for getting Mechanical completion certificate (MCC) system/sub-system wise.

Responsible for Preparation/getting approval of commissioning procedures

Monitoring of Preparation of loop folders/Function test folders including associated check lists.

Review & fulfilling requirements of dossiers RFC, RFSU.

Responsible for completion activities related Pre-commissioning of instrument loop checking.

Responsible for completion activities related Commissioning activities of C&E checking & function test.

Gas plant start-up activities / start-up maintenance & trouble shooting.

8.Period : April.2000 to May.2001

Company : CCICo. (Clint: Technip-Bechtel JV)

Designation : Instrument Engineer

Project : Gas plant and utilities in Habshanon on-shore gas fields development projects OGD-II in UAE. The capacity of plant is 55,000 BPD condensate, 1500mmscfd gas.

Responsibilities : Commissioning

Execution of Pre-commissioning of instrument loop.

Commissioning activities of C&E checking & function test

Keeping red line mark-up (RLM) of ILD / C&E charts for final As-Built

9.Period : Dec.1995 to June.1999

Company : Abdullah Al-Shuwayer Co. (Clients: S.Aramco, Babcock Arabia)

Designation : Instrument Engineer

Project : Various Saudi Aramco & SABIC projects.

Responsibilities : Construction

Calibration activities for complete GOSP plant instrumentation with well-equipped facilities including trouble shooting

Construction activities of GOSP plant.

Scheduling of construction activities to meet project mechanical completion(MC) dates/

Follow-up with procurement to ensure material availability to meet scheduled construction activities

Ensure to complete QA/QC procedures of ITP & closing out NCRs to meet MC documentation requirements.

Keeping red line mark-up (RLM) of all construction drawings for final As-Built

10.Period : Oct.1989 to Nov.1995

Company : Neyveli Lignite Corporation Ltd.

Designation : Exec. Engineer (Instrumentation)

Key Responsibilities : Commissioning & maintenance activities of Thermal power plant (210 MW) in Neyveli, India.

11. Period : Jan.1988 to Oct.1989

Company : The Nepa Ltd. (formerly National News print & paper Ltd.)

Designation : Shift in-charge (instrumentation)

Key Responsibilities : Worked for Instrumentation works maintenance activities of integrated pulp & paper plant (200 TPD capacities) in Nepanagar, India.

Control Systems commissioned:

Yokogawa centum CS3000 DCS/prosafe ESD systems / package PLC’s.

Honeywell Experion DCS system with Triconex TMR ESD system

Allen Bradley PLC, Sie mens simatic S5 PLC hard ware / software checking and commissioning for package units air compressors, sulphur granulation, Burner management system(BMS) etc

ABB-August SE300 (TMR), Triconex TMR ESD hard ware / software checking and commissioning.

Supervision of installation & commissioning of Bently Nevada 3300/3500 systems for MMS of compressors & heavy-duty pumps.

Supervision of installation and commissioning of fire & gas (F&G) detection systems including calibration of flammable / toxic gas detectors.

Personal Information

Name : BANDA VENKATA SUBRAHMANYAM

Education : M.Sc. (Tech.) Instrumentation

Experience : 22 years +

Nationality : INDIAN

Date of Birth : 20-10-1963

Passport Details : N2945701 valid till September, 2025

Address for communication : F.No. 302, Krisal west avenues Apt.,

2nd Line, Syamalanager, GUNTUR, A.P., PIN: 522006

Mobile: 0091-988-***-****

Land Line : 0091-863-***-****



Contact this candidate