R E S U M E
Personal:
Name SHAKIL AHMED KHAN
Age 52 years
Health Excellent
Height 6.0 Ft
Weight 90 kg
Permanent Address House # C-11 /6, Afnan Duplex Houses, Block 3A Gulstan-e-Johar
Karachi Pakistan.
Phone # 0092 – 342-***-****
0092 - 345-***-****
E-mail Address *********@*****.***.
Education: M.S in Mechanical Engineering from Wayne State
University, Detroit Michigan, USA (1990 – 1992).
B.S in Mechanical Engineering from M.U.E.T, Pakistan
(1983 -1988)
Experience:
07/2011 – Present Joint Manager in Attock Cement Pakistan Ltd
Carried out Responsibilities of field repair & maintenance of
Crushers, Stackers, Recalimers & Raw mill (VRM & Ball Mill).
Carried out responsibilities of Plant conditioning monitoring system
of both lines & maintenance planning & scheduling of each area.
Carried out responsibilities of field repair maintenance / Inspection /
Lubrication & Maintaince master schedule of major equipments.
Carried out responsibilities to implement Plant Management Maintenance System (PMMS)
9/2010 – 04 /2011 Head of Planning & Design in SPCC (Tehama Plant) KSA.
Carried out responsibilities Material procurement and fallow up all
Spare parts [Foreign & Local] of the plant. Including Indent. Purchase
Order & Inspection of spares through Oracle system.
Carried out responsibilities of Plant conditioning monitoring system
& Plant essential modification through planning & design
Carried out Responsibilities of field repair & maintenance of
Equipments & other relevant activities.
Carried out maintenance planning & scheduling of each area [Major
Equipments.} With coordination of other depts.
.
12 /2005 – 07/ 2010 Mechanical Engineer
Saudi Cement Company Hofuf Plant, KSA
* Carried out responsibilities of field repair maintenance of Kiln, cement
Mill & packing plant.(PM&CM task )
* Carried out responsibilities of field repair maintenance, Inspection,
Lubrication & Compressor maintenance of whole Plant.
* Implementation of total lubrication Management at Hofuf Plant
Including, Lubrication Lab, and Filtration unit (Mobile/stationary)
Oil & grease dispensing System
* Carried out Maintenance Planning of each Parents
Machines/Equipments, Including Spare parts Procurement.
* Carried out responsibilities for area Inspection jobs of all equipments
(daily/Weekly Monthly) and maintained the check list of every equipment.
06/2001 – 12/ 2005 * Carried out responsibilities of Plant Management Maintenance
System (PMMS) for Implementing (AS400) with Pro part – I /11
at plant site.
* Implementation of AS400 to record all P.M. & C.M
(Activities) planning in plant through work order, Labor Entery, man-
Hours & Issuing Spares also recorded in same work order of specific
Machine to get total maintenance Cost of specific equipment &
Running hours of parent machine has been recorded in system
* Work on Oracle inventory management for Move order /purchase
Order.
04 /1997 - 06/2001 Sr. Deputy Manager (Repair & Maintenance / Inspection)
Dadabhoy Cement Industries Limited Karachi.
* Carried out repair maintenance of Crushers, Raw mill Area, Cement Mill
and packing plant.
* Carried out Maintenance Planning & scheduling of each Parents
Machine/Equipments,Including Spare Procurement (Local/Foreign)
* Carried out Inspection Schedule of all Equipments & check list of all
major equipment (Daily/Weekly/Monthly)
* Supervise the complete monitoring system Including
Inspection & maintenance schedule, & record keeping of
Equipments
10/1992 - 04/1997 Project Engineer MAS Associate Private Limited
* Project planning & Co-ordination of Lucky Cement Complex
having two lines of 2000 tons / day in respect of foreign & local
Equipments, material procurement & fabrication jobs etc.
* Carried out inspection of manufactured & fabricated
Equipments in Pakistan.& China,
* Carried out Erection, Commissioning & test run of each equipment
(Individually /group wise).of the plant
* Project Planning & coordination of ESP. & modification of
BMR project of Grabwal Cement Company in respect of
Equipments materials procurement (local / foreign
Equipments) Fabrication erection, commissioning & test run
01 /1992 - 10 /1992 Mechanical Engineer Ford Motor Company, Michigan
USA.
* Studied design related problem and developed various
Solution worked on HaiperMash and Finite element Methods.
02/1988 - 08 /1989 Production Engineer Dadabhoy Cement Industries Limited.
* Monitoring the production of each area / section of the plant
From crusher to packing plant .Also responsible for repairing
& trouble shooting of all equipments.
Computer skills:
Operating system. UNIX, MS DOS, SUN, AS400 work station,
Soft ware. Prolog, Turbo prolog, Stanjan, Expert system,
Oracle inventory Management, Excel. Window
98 /2000, & Window XP, MS Word,