Post Job Free

Resume

Sign in

Power Plant Engineer

Location:
Chhattisgarh, India
Posted:
October 29, 2019

Contact this candidate

Resume:

MILAN KAPAT

Mob No-+919*********(M)

+919*********(Home)

E-mail adapbw@r.postjobfree.com

CAREER OBJECTIVE

Intend to build a career in electrical and instrumentation field with leading corporate of hi-tech environment with committed and dedicated people, which will help me to explore myself and prove my potential. Willing to work as a key player in challenging and creative environment.

SYNOPSIS:-

• Individual with positive mindset, goal orientation& ability to work at extreme ends of organization.

• Working with a sense of ownership& dedicatedly giving maximum efforts to deliver extra& accomplish tasks.

• Excellent written, communication, interpersonal, & problem solving skills with the ability to work in multicultural environment.

PROFILE

Sincere & diligent professional experience of total 4.5 Years in Electrical & Instrumentation Maintenance in Coal Handling Plant (CHP) and Ash Handling Plant (AHP) of Thermal Power Plant with extensive experience in operation and maintenance.

Experience in Erection and Commissioning of Field Instrument.

Currently working as an ENGINEER with MCNALLY BHARAT ENGINEERING COMPANY LIMITED.

Core Technical Skills: Operation & Maintenance Management, Testing, Calibration, Troubleshooting, Analysis, Manpower Handling and Client Satisfaction. TECHNICAL SKILLS

Maintenance and testing of HT and LT motor.

Overhauling of LT motor.

Maintenance and testing of dry and oil type Transformer.

Knowledge of Motor Protection Relays REF615(ABB), Micom P242,P241(ARIVA),Micom,MM10,(L&T) .

Knowledge of System Application Process (SAP).

Winding & Condition Base Monitoring and Rectification of Motors.

Maintenance of 6.6 KV breakers, VCF and LT Breaker, Sfu Module.

Maintenance of Contactor, OLR, Delay Timer, Interposing Relay,MCB,MPCB,MCCB,RCCB & ELCB.

Erection and Commissioning of Chute Block Switch, ZSS, DE System.

Calibration & Servicing of Belt-Weigher of conveyors, Position Monitoring System of Travelling Tripper, Pressure Switch, Flow Switch and Temperature Switch.

Do handle Logical Control Operation through PLC and do analysis of troubles of all equipment’s.

Monitoring and maintenance of all Vibration Probe Sensors through Vibration Monitoring System.

Monitoring and maintenance of - Temperature/ Flow/ Level and Pressure measurement instruments, Control Valves, Actuators, ZSS Sensors, Pull-chord, Belt-sway, Brake Limit Switches, Proximity Sensors, Heavy Duty Limit Switches, Toggle Limit Switches, Local Stop and Start Push Buttons, Torque Limit Switches, ILMS, DMS,Metal Detector, Suspension Magnet, Ventilation Systems, Belt Rapture Unit.

Preventive and Breakdown Maintenance of Belt Conveyors, Stacker Cum Reclaimer, Wagon Tippler,Side Arm Charger, Paddle Feeder, HT and LT Motors, Sump Pumps, compressor. Preventive of RIO Panels.

Erection,Commission and Tasting of VF Drives (Siemens & Vacon) and LT Drives(L&T).

Maintenance of UPS, Battery Charger, Wet & Dry Type Battery Bank.

Knowledge of Electrical Drawing.

PROFESSIONAL EXPERIENCE

Present Working Company: MCNALLY BHARAT ENGINEERING COMPANY LIMITED. Project Name: Parsa East Kente Basan Coal Mines.

Role: Engineer.

Client: Adani Enterprises ltd.

Duration: From 1th

August 2019 to Till now.

Responsibilities:

Preparation and arrangement of preventive maintenance, routine maintenance schedule of Electrical and Instrumentation maintenance and implementation of the JIG & DMC Coal Washary.

Maintenance of Belt Conveyors, Stacker cum Reclaimer, Coal Washary, Crusher, Silo.

Management of man power, job planning and arrangement of spares.

Daily work allotment to subordinates and follow up to the work progress to complete in time.

Keep maintain the highest production level by quick troubleshooting in E&I all instrument.

Strong understanding of safety requirements and standards procedure with proven ability to manage the entire maintenance activities with key focus on bottom line profitability. Present Working Company: MCNALLY BHARAT ENGINEERING COMPANY LIMITED. Project Name: 5X660 MW Thermal Power Plant

Role: Engineer

Client: Adani Power Maharashtra Limited, Tiroda (Maharashtra) Duration: From 1st

August 2018 to 31st

July 2019

Responsibilities:

Preparation and arrangement of preventive maintenance, routine maintenance schedule of Electrical and Instrumentation maintenance and implementation of the same at site.

Management of man power, job planning and arrangement of spares.

Daily work allotment to subordinates and follow up to the work progress to complete in time.

Keep the bunker level healthy condition through the proper operation.

Strong understanding of safety requirements and standards procedure with proven ability to manage the entire maintenance activities with key focus on bottom line profitability.

Implementation of 5S to provide a proper discipline and quality of work. Present Working Company: MCNALLY BHARAT ENGINEERING COMPANY LIMITED. Project Name: 4X135 MW Thermal Power Plant

Role: Engineer

Client: Sai Wardha Power Generation limited.

Duration: From 5th

March 2018 to 31st

July 2018.

Responsibilities:

Preparation and arrangement of preventive maintenance, routine maintenance schedule of Electrical maintenance and implementation of the Ash Handling Plant (AHP).

Maintenance of sub-marge shuttling conveyor(SSC), Drag conveyor (DC), Vent fan, Silo Blower, Esp. Blower, Esp., Heater.

Management of man power, job planning and arrangement of spares.

Daily work allotment to subordinates and follow up to the work progress to complete in time.

Strong understanding of safety requirements and standards procedure with proven ability to manage the entire maintenance activities with key focus on bottom line profitability Present Working Company: MCNALLY BHARAT ENGINEERING COMPANY LIMITED. Project Name: 3X660 MW Thermal Power Plant

Role: Engineer

Client: Lalitpur Power Generation Company ltd.

Duration: From 15th

April 2017 to 4th

March 2018.

Responsibilities:

Preparation and arrangement of preventive maintenance, routine maintenance schedule of Electrical and Instrumentation maintenance and implementation of the same at site.

Management of man power, job planning and arrangement of spares.

Daily work allotment to subordinates and follow up to the work progress to complete in time.

Keep the bunker level healthy condition through the proper operation.

Strong understanding of safety requirements and standards procedure with proven ability to manage the entire maintenance activities with key focus on bottom line profitability Present Working Company: MCNALLY BHARAT ENGINEERING COMPANY LIMITED. Project Name: 5X660 MW Thermal Power Plant

Role: Engineer

Client: Adani Power Maharashtra Limited, Tiroda (Maharashtra). Duration: From 5th

April 2015 to 14th

April 2017

Responsibilities:

Preparation and arrangement of preventive maintenance, routine maintenance schedule of Electrical and Instrumentation maintenance and implementation of the same at site.

Management of man power, job planning and arrangement of spares.

Daily work allotment to subordinates and follow up to the work progress to complete in time.

Keep the bunker level healthy condition through the proper operation.

Strong understanding of safety requirements and standards procedure with proven ability to manage the entire maintenance activities with key focus on bottom line profitability.

Implementation of 5S to provide a proper discipline and quality of work INDUSTRIAL TRAINING

4 Weeks Vocational Training at Kolaghat Thermal Power Station(W.B.P.D.C.L), Mecheda (West Bengal). Taken overview of Thermal Power Plant.

4 Weeks Vocational Training at New Bishnupur-220 Substation (W.B.S.E.T.C.L), Bishnupur (West Bengal). Taken overview of Substation.

4 Weeks Vocational Training at West Bengal Renewable Energy Development Agency, Salt Lake Electronics Complex, Kolkata.

EDUCATIONAL QUALIFICATION

EXAMINATION SCHOOL/COLLEGE UNIVERSITY YEAR OF

PASSING

MARKS

OBTAINED

B.TECH Calcutta Institute Of

Engineering And Management

West Bengal University Of

Technology.

2015 DGPA 7.70

DEPLOMA K.G. Engineering Institute West Bengal State council of Technical Education.

2012 74.24%

Higher

Secondary(10+2)

Rajnagar Putputia S.C High

School

West Bengal Council of Higher

Secondary Education

2008 56.2%

Secondary Salika Garchak R.A Vidyapith West Bengal Board of Secondary Education

2006 65.12%

COMPUTER SKILLS

Operating System: Windows XP/7/8

Expertise in Office Tools-MS Word, Excel, PowerPoint PERSONAL DETAILS

Father’s Name Mr. Sukumar Kapat

Date of Birth 12-03-1991

Nationality Indian

Sex Male

Marital Status Unmarried.

Communication

Skills

Bengali (Read, Write, Speak)

English (Read, Write, Speak)

Hindi (Speak)

Hobby Playing Cricket, Football, Volleyball,listening Music. Address C/O – Sukumar Kapat

Vill +P.O – Salika Garchak

P.S – Tamluk

Dist. –PurbaMedinipur(W.B)

PIN– 721653

ABOUT MYSELF

I am hardworking, sincere & an extrovert who loves going around places, meeting people, chatting with friends & whatever work I have to do, I do it to the best of my abilities and knowledge. My strength is never lose hope and never gives up.

The above information is true as per I know. I assure that if you give me a chance, I can prove my worth to you.

DATED:

PLACE: Milan Kapat



Contact this candidate