Post Job Free

Resume

Sign in

Engineer Project

Location:
Quezon City, Philippines
Posted:
October 26, 2019

Contact this candidate

Resume:

*. Name of Staff: Mr. Oscar Ramon Z. Palaganas, ASQ-CQA

2. Date of Birth: March 31, 1962

Nationality: Filipino

3. Education:

****- ****

Bachelor of Science in Civil Engineering (University of the East, Manila, Philippines)

4. Membership of Professional Associations:

American Society for Quality-CQA

Saudi Council of Engineers

Philippine Welding Society

Philippine Institute of Civil Engineers

Geodetic Engineers of the Philippines

5. Summary of Experience:

Mature professional over 25 years of local & international experience in various construction industry engaged in:

a) Quality assurance and control, management, supervision, external & internal auditing, documentation, inspection/ investigation, sampling, testing, factory inspection, monitoring & commissioning, documents review and verification : of large projects for client thru consultancy services (Azerbaijan Railway Project in Baladjari and Gandja, Ethiopian Railway Project, Ministry of Housing in KSA; Venetian Hotels & Casinos in Macau, Northrail project & Dept. of Public Works & Highways - 2nd MMED in Philippines), 1st tier contractor (Taiwan High Speed Project C220, BGC –BPO multi-storey bldg), subcontractor (ExxonMobil PNG / LNG Project in Papua New Guinea, MMC- Gamuda KVMRT Project in Malaysia) and supplier.

b) Project implementation, site supervision and management : major infrastructure such as roads and highways ( asphalt & concrete), bridges/ viaducts ( precast/ cast-in place concrete & structural steel), trackworks, buildings ( industrial, commercial, school & residential), bulk earthworks (large soil/ rock excavation - blasting, chemical, mechanical), dredging & reclamation, caissoning, concreting ( large deep foundation, canals/drainage, slipforming, bored piling / pilewall ), jetty, ELS, soil investigation/stabilization/reporting, ground improvement (jet grouting, soil-cement, dynamic compaction, pile drive), slope protection ( gridbeam, shotcrete, soilnail, grassing, riprapping, retaining walls, sheetpiles, piledrive), tunnels ( NATM, Cut & Cover, TBM, Shotcrete, Rockbolt/ Soilnail, lattice girder, water proofing, concrete lining/slabs, concrete sleepers), concrete repair (grouting/injection),

6. Countries of Work Experience: Saudi Arabia, Papua New Guinea, Macau, Taiwan, Saipan,

Philippines, Africa. Malaysia, Azerbaijan

7. Languages:

Level of Proficiency ( Excellent, Very Good, Good, Fair, Poor)

Language

Speaking

Reading

Writing

English

Very Good

Very Good

Very Good

Tagalog ( mother tongue )

Excellent

Excellent

Excellent

Arabic

Fair

8. Employment Record:

May, 2018 –

On Call Basis only

Systra - Azerbaijan

Quality Certification Expert

Jan, 2017 –

May 2017

MMC – Gamuda KVMRT (T) Sdn. Bhd.

QA/QC Manager

Aug, 2015 –

Dec,2016

Systra - Ethiopia

Quality Certification Expert

Jan, 2013 –

June,2015

Parsons Int’l Ltd., KSA

Sr. QA/QC Engineer/Supervisor

Aug, 2010 –

Sept, 2012

Leighton Contractors Ltd.; Papua New Guinea

Sr. QA/QC Engineer / Superintendent

Mar, 2009 –

Aug, 2010

Systra France- ESCA- Systra Phils. Inc (SES) - JV

QA/QC Engineer/ Site Supervisor

Feb, 2008 –

Dec, 2008

Ove Arup & Partners HK Ltd, Macau

Asst. Resident Engineer

Oct, 2007 –

Feb, 2008

Makati Development Corporation

QA/QC Head

Jan, 2006 –

Sep, 2007

Self- Employed

Sub-Contractor ( Labor work )

Feb, 2001 –

Jul, 2005

Daiho Corporation, Taiwan

QA/QC Lead Inspector/ Sr. Supervisor

Sep, 1999 –

Dec, 2000

Self- Employed

Sub-Contractor ( Labor work )

Sep, 1998 –

Jul, 1999

Western Equipment Inc., Saipan, CNMI

Civil Engineer/ Surveyor/ Safety Officer

Mar, 1996 –

Aug, 1998

Tokyu Const. Co. Ltd

Site Engineer

Jan, 1993 –

Feb, 1996

CEPA- Slipform Power System Ltd.

Section Engineer / Sr. Construction Surveyor

Mar, 1991 –

Nov, 1992

Saudi Binladin Group, KSA

Chief Surveyor

Feb, 1990 –

Jan, 1991

A.T.Y Builders

Site Engineers

Oct, 1988 –

Nov, 1989

Multech Construction

Site Engineers

Jun, 1986 –

Sep, 1988

Dept. Of Public Works & Highways, 2nd MMED,Phils.

Site Inspector

Mar, 1985 –

Apr, 1986

Yukon Trading & Construction Corp.

Site Engineer/ Surveyor

9. Detailed Tasks Assigned

-Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned

Name of assignment or project:

CONSULTING SERVICES FOR TECHNICAL SUPERVISION TO

“AZERBAIJAN RAILWAYS” CJSC FOR PROJECT SERVICES RELATED TO

CONSTRUCTION OF TWO LOCOMOTIVE DEPOTS AND INSTALLATION

OF EQUIPMENT

Year:

May, 2018 – On call basis only

Location:

Position hold:

Baladjari and Gandja in Azerbaijan

Quality Certification Expert

Main

project features:

The Government of Azerbaijan(GOA) with Azerbaijan Railways Closed Joint Stock Company (ADY) has to upgrade railway infrastructure and related componenents along east-west railway corridor of Azerbaijan to improve railway services. The program covers key activities which are Power Conversion, Signalling, Locomotives, Track Rehabilitation, Locomotive Depots and Equipments. The consultants will administer the Plant Design, Supply and Installation, and Supervision.

Responsibilities:

Pre- Construction and Early Construction Stage- Developed consultants QMS that comply ISO, standard and contract requirement. Reviewed and approved contractor’s quality documents such as but not limited to PQP and Quality Procedures, Method Stements, ITP, others.

Construction Stage- Surveillance / Visit, Management, Supervision, and Inspection for definable features of works of the contractors and manufacturers/ suppliers. Carried out regular Audits to the contractors and consultants for the projects against their QMS, ISO 9001, standards, specifications, drawings and contract requirements. Prepared and conducted regular Quality Meetings and Monthly Report to Client and Main Office to discuss and solved important issue with regards to quality. Developed and conducted presentation/ trainings in Quality to colleagues and the new members. Regularly monitored and evaluated contractor’s quality programs, like Work Inspection and Test, NCR, CAR, material laboratory/ in – situ test reports, etc. Worked closely with project team and other project parties to resolve quality issues . Provides input as required to requests for information from manufacturer/suppliers/ contractors.

Name of assignment or project:

EPC CONTRACT FOR KVMRT – SSP LINE UNDERGROUND WORKS PROJECT

Year:

January, 2017 – May, 2017

Location:

Position hold:

Main project features:

Kuala Lumpur, Malaysia

QA/QC MANAGER

The Klang Valley Mass Rapid Transit Project (KVMRT), involves the construction and completion of a underground railway network by TBM from Sungai Buloh – Serdang – Putrajaya Line (SSP Line) which is approximately 13.5 km and consisting of 10 new stations and 1 existing Tun Razak Exchange station.

Responsibilities:

Pre- Construction and Early Construction Stage- reviewed and commented on contractor, sub- contractor/ supplier / manufacturer’s submittals such as but not limited to the proposed and/or delivered materials, samples, mix design,quality test reports, others. Conducted internal audits with the operation and external audit with the suppliers, subcontractors,manufacturers and laboratories to evaluate their competencies. Developed monitoring logs for the weekly and monthly report required by the senior management and the clients. Conducted pre- construction meetings with work package contractors, laboratories, suppliers/ manufacturer.

Construction Stage- Management, supervision, Surveillance / Visit, inspection, on definable features of works if according to project specification, standard requirements, PQP and QC of the contractors and manufacturer/ supplier ( e. g. Concrete precast products, etc. ). Audit QMS of the contractors for the projects in relation with ISO 9001. Prepared and conducted regular Quality Meetings and Monthly Report to Client and Main Office to discuss and solved important issue with regards to quality. Develop and conducted presentation/ trainings in Quality to colleagues and the new members. Monitored and evaluated NCR raised, material laboratory/ in – situ test reports. Work closely with project team and other project parties to resolve quality issues . Provides input as required to requests for information from suppliers/ manufacturers.

Name of assignment or project:

CONTRACT MANAGEMENT, SUPERVISION & DESIGN REVIEW FOR ETHIOPIAN RAILWAY PROJECT ( AMOUNT = 1.7 BILLION DOLLARS)

Year:

August, 2015 – December, 2016

Location:

Position hold:

AWASH-WELDIA / HARA GEBEYA RAILWAY

Quality Certification Expert

Main project features:

The projected line starts in the East of the city of Awash, arriving at Weldia via the city of Kombolcha. It represents a global investment of 1,7 Billion US Dollar. Extending the railway will also play an active and significant role in connecting the northern region of the country with the central part. The total track length approximately 389 Km that composed of 14-tunnels, 6,293 LM-bridges, 10-overpass, 357 KM - grade track, 4- Main Stations, 6- Intermediate Station and 1- Maintenance Workshop. Target speed of 120 KPH.

Responsibilities:

Pre- Construction and Early Construction Stage- reviewed and commented on contractor’s submittals such as PQP, Method Statements, ITPs, Checklists, Forms, Quality Procedures, Suppliers/ Manufacturers, Materials, Specifications to be used, design, Detailed Drawings, etc to evaluate their competencies. Factory visit/ inspection/ surveillance for the manufacture of goods especially precast concrete sleeper and other definable feature of work. Participated in developing PMP and developed QMS forguidelines of the project. Conducted pre- construction meetings with contractors and clients.

Construction Stage- Management, supervision, Surveillance / Visit, inspection, on definable features of works if according to project specification, standard requirements, PQP and QC of the contractors and manufacturers/ suppliers. Audit QMS of the contractors for the projects in relation with ISO 9001. Prepared and conducted regular Quality Meetings and Monthly Report to Client and Main Office to discuss and solved important issue with regards to quality. Develop and conducted presentation/ trainings in Quality to colleagues and the new members. Monitored and evaluated NCR raised by ER and contractors, material laboratory/ in – situ test reports. Work closely with project team and other project parties to resolve quality issues. Provides input as required to requests for information from suppliers/ contractors.

Name of assignment or project:

PMST CONSULTANCY SERVICES FOR MOH HOUSING PROJECT

Year:

Jan, 2013 – June, 2015

Location:

Position hold:

Jeddah, KSA

Sr. QA/QC Engineer/ Supervisor

Main project features:

The project area is approximately 4 million sq. meter with a cost of SR 620M, involves bulk earthworks (cut & fill), infrastructure (sewer, stormwater, electrical, communication, irrigation, electrical posts), roads (embankments, subbase, base coarse, asphalt, road markings), landscaping ( concrete blocks / furniture, planting, irrigation).

Responsibilities:

A) During pre-construction stage at PMO – MoH office: Participated in preparing PMP, QMS, PQP for each project managers that provides essential elements for the coordination of job activities. B) During early construction stage at project site in Jeddah: reviewed and commented on contractor, sub-contractors, supplier and independent 3rd party laboratory submittals (TQ’s, materials, shop drawings, MS/ Procedure, ITP’s, checklists and site handovers) and qualifications. Factory and material source visit / inspection / surveillance of potential supplier and manufacturers involved in the project. C) Construction Stage: Involved in management, supervision, inspection, testing, monitoring and sampling of soils & aggregates ( offsite / in site) for fill in low areas and in excavated trenches for utilities / road embankments & subbase, structural concrete material components ( mix design & trial test approval) ; for manholes, large irrigation tanks, landscape furniture ( pre-cast & cast-in place), various pipes for under- ground utilities ( air test, hydraulic test), asphalts and components for roads, electrical posts. Prepared weekly & monthly report, meeting minutes, KPI, audit minutes & evaluation report. Overseen site inspector inspection and on contractor’s MRI and WIR submittals. Monitored if there are non- conformance / compliance on the work or procedure by issuing NCR or SI to contractors. Participated in conducting internal & external audits and documented, evaluated, monitored of evidence, corrective action, preventive action and root causes of such defective items. Contributed and shared lesson learned and risk assessment from quality, construction and safety issues. Participate in conducting training for new site staff in quality and construction issues.

Name of assignment or project:

EXXON-MOBİL PNG/LNG PROJECT EPC 3

Year:

Aug, 2010 – Sept, 2012

Location:

Port Morseby, Papua New Guinea

Positions held:

Sr. QA/QC Engineer, Superintendent

Activities performed:

Took responsibility for QA/QC, Management & Supervision programme for site preparation work of Liquefied Natural Gas Plant located near the shore of Port Moresby, Papua New Guinea covering around 8.7 million sq.meter involving bulk earthworks (cut & fill), roads

(embankments, soil stabilization, geotextile installation, sub-base, base course, asphalt) and drainage system (concrete/HDPE/grass liner, RCCP pipe and RC culvert ), landfill ( HDPE liner finish). Implimented the quality standard of the construction concurrence to the Owner’s (ExxonMobil) and client’s (CJJV, CBI) QA plan in compliance with design, specification and accepted standards of the industry. Helped in developing Construction Quality Management Plan, assisted construction team in preparing MAR, PCP, ITP, WMS, JSA / SHEWMS, Checklists, MIR, Request for Inspection(RFI),TQ and other relevant documents concerning the required standard of the project; analyzed and ensured that all materials ( soils, aggregates, precast/cast-in place reinforce concrete, etc), equipments, work methodoloy (ground foundation investigation, holdpoints) and supplier’s activities were reviewed, inspected, tested, checked and approved prior to used; develop spreadsheets and matrixes for monitoring new and finished Construction Lots, Handovered lists, document register, test reports, correspondence and other important activities involved in the contract; raised, evaluated and closed NCR, CAR, Punch list (internal and external) and contributed or provide assistance if necessary on preventive measures to control such defective work and maintain effective quality control, identified root cause of non-conformity and prevention from re-occurrence; prepared and submitted reports ( internal & external ) for auditing, recording, monitoring and references. Attend and/or assist in weekly / monthly Construction or Quality meetings . Final Inspection and Handovered Submission of staging area finished to the next contractor which was already approved by client and owner. Documented and submitted of all Fabrication Record Book to client during final handover/ demobilization of the project.

Name of assignment or project:

PMST CONSULTANCY SERVİCES, NORTH RAİLWAY PROJECT

Year:

Mar, 2009 – Aug, 2010

Location:

Philippines

Main project features:

Ground Investigation, Pilings, Foundations, Bridge & Viaducts, Concrete& Steel Structural works, Railways & trackworks, Jet grouting, Slope Protection, Soil Improvement, Embankment

Positions held:

QA/QC Engineer/ Site Supervisor

Activities performed:

TooK responsibility in management, supervision, witnessing, inspection and conduct approval and documentation of daily construction activities and materials (test report for structural steel, reinforcement, concrete, precast product, fabricated materials, soils and aggregates, water and chemical used, etc) being undertaken in project site such as quality, safety and quantity of actual work accomplished. Prepared checklists and approved inspection forms required prior to proceedings to next construction activities. Commented on ground investigation(test pit, boreholes, soil sampling) for the basis of design if require soil improvement, jet grouting or piling (bored piles/ pile drive, sheet piles and other soil protection and stabilization). Checked and evaluated the bored piles/ jetgrouting depth if already achieved its design depth prior to install the approved rebar cage/ concrete/grout and evaluate the actual volume of concrete / grouted poured versus the theoritical volume; evaluate test report for integrity test ( sonic logging, PDA ), test report on static load test against the standard. Monitor installed instrumentation (inclinometer, piezometer, settlement platform). Checked surveyors report of marking and final elevation of structure. Checked the design/trial/ in situ of concrete mix, heat number of steel and delivery notes, materials delivery from offsite or in site such as precast sleepers and trackworks accessories, repair products. Attended and/or assisted in weekly construction or quality meetings of NorthRail ( client ), CNMEG (contractor), and SES- JV ( consultant ). Drafted, prepared/raised, report, commented, reviewed and signed all issues related to construction quality work such as non- conformity work with approved plans, specifications and Methodology. Contributed or provided assistance if necessary on preventive measures to control such defective work.

Name of assignment or project:

STRUCTURAL DESİGNER AND CONSULTANCY SERVİCES FOR SUPERVİSİON OF CONSTRUCTİON OF VENETİAN MACAU HOTELS & CASİNOS

Year:

Feb, 2008 – Dec, 2008

Location:

Macau, PROC

Main project features:

Parcel 5 & 6 : Buildings

Parcel 7 & 8: Geotechnical Works ( Subsurface investigation) and Pilings, External Works

Positions held:

Asst. Resident Engineer

Activities performed:

Geotechnical Works in Parcel 7 & 8: Ground Investigation, Pre – boring, Drilling/ Excavation, Piling a) Established termination criteria of bored soil samples from the design team for future bored socket pile construction ( 2meter in diameter). b) Checked depth of drill hole with a calibrated Arup tape on rock head and at the end of coring with an agreement on contactor’s log. Constantly verified the pre-bore results with that revealed by the ground investigation, confirmed that the drill-hole is grouted upon satisfactory completion and associate with the design team on the founding level of the structure ( 2-meter diameter socket pofile). Plotted map of rock strata of the sub surface from the drilled data of ground investigation c) Checked specification for verticality, termination criteria, establish and developed a plan to average rate of excavation/ penetration on subsequent piles ( Precast pile drive, bored piles, pilewall, jet grouting) to reach the design requirements with the corresponding sonic, integrity test, load test. Measure the depth, size, reinforcement, cages, concreting method, sampling and testing. d) Established specification from the designer for the acceptable tolerance of the test method applied on the working piles integrity.

General Functions in Parcel 5 & 6: a) Deal with all matters relating to supervision of construction of 43-storey building in which requires a decision or action by the lead designer responsible for the civil projects. Provided, where appropriate, with any supporting information, detailed comments and draft proposals. To observe, inspect and check the execution and testing of the works of the contractors ( Shinchong Construction), trade contractors and suppliers as they proceed in accordance with the design requirements wherever possible. b) Delegated by RE to prepare site memos and non-conformance reports and coordinated with other parties and attend progress meetings, to review, comment and check on contractor’s method statements, submission and ensure that they are in place and that the work is carried out accordingly. Maintained high level of communication with the Trade Contractor’s field staff in order to deliver the technical advices from RE correctly and effectively thru Aconex. c) Took action as necessary where unsafed practices take place or safety precautions are not followed, rejected unsatisfactory work and agree suitable remedial work as required. d) Keeped records of inspections, tests and hidden works. Monitored site progress and record the quantity and capacity of the plant and labor so that problems in achieving the program can be identified and maintain a project diary or daily report as required. Monitored Trade Contractor’s performance over safety issues on – site and reported to RE for any unsafe construction practices.

Name of assignment or project:

BGC BPO BUİLDİNG PROJECT

Year:

Oct, 2007 – Feb, 2008

Location:

Makati City, Philippines

Main project features:

Design and Build : 29 – Storey Commercial Building

Positions held:

QA/QC Head

Activities performed:

Prepared QMS & PQP for the project and ensure implementation on site such such as constant inspection, sampling & testing of structural concrete materials, concrete blocks, water proofing, architectural finishes (curtain wall, glass panel, etc) . Coordinated inspection with sub-contractors ( electrical, mechanical, communication, etc) in their respective specialized trade according to the approved MS and ITP.

Name of assignment or project:

SUB- CONTRACTİNG VARİOUS DPWH PROJECTS

Year:

Jan, 2006 – Sep, 2007

Location:

Metro Manila, Philippines

Main project features:

Construction of Banawang Communal Irrigation in Bataan with a project cost of P18.621M, Construction of Drainage System @ Manuel L. Quezon Rd., Brgy. San Roque in Antipolo City with a project cost of P17.37M and Rehabilitation / Improvement of South Super Hi – way in Makati City with a project cost of P22.775M.

Positions held:

Self - Employed

Activities performed:

Sub-contracting works ( labor contracts for formworks, concreting and RCCP pipes installation only )

Name of assignment or project:

TAİWAN HİGH SPEED RAİL PROJECT C220: CONTRACT AMOUNT = NT$ 25 B ( BOT )

Year:

Feb, 2001 – Jul, 2005

Location:

Taiwan, ROC

Main project features:

Sta. 68+ 540 ~ 86 + 330, L= 17,780 m : Viaduct = 9,170 m, Tunnels (NATM) = 3,525 m, Cut & Cover Tunnels = 345 m, Earthworks = 4,730 m + to Luchia Sta. = 1,100m : Hsinchu Station

Positions held:

QA/QC Lead Inspector/ Sr. Supervisor

Activities performed:

a) Civil works management, supervision, quality inspection, sampling and testing of materials, factory visit and inspection, installed and works procedure verification (before, during and after ) for foundation, backfilling of soil or soil cement, shotcrete, concrete, soil nail & rockbolt, post-tensioning, verified survey stakings & report, repair materials etc. and took precedence if they are in accordance with the prepared and approved Method Statements, Work Specification, ITP and approved construction drawings with ISO9001 requirements. b) Supervised inspection & testing for cubes sample in shotcrete ( in Tunnels, Grid beam, slope protection), grouts for soil nail/rockbolt, in – situ / precast concrete, repair grout materials. Constantly monitoring installed piezometer, inclinometer, settlement platform and other installed instrumentation and promptly submitted to design and geotechnical team for evaluation. c) Participated in progress, NCR and Audits meetings and liaises ( joint inspection ) with the contractor’s designer IOA Lexiq ( France) + Moh and Associates ( Taiwan ), CICE’s Societe Generale de Techniques et d’Etudes ( France ), MOT auditors’ Int’l. Railway Eng’g. Group ( IREG ), client’s THSRC inspectors, government representatives and contractors. d) Handled and assigned 7 QC civil inspectors in their respective field of assignments in 3 – Classes ( Earthworks, Viaducts and Tunnels); help and participate in technical assistance, calibration of testing instruments, specially for studies in the preparation of Work Procedure, Method Statement that are not included in specification like in Concrete Repair, Soilnail Pull-Out test, Dynamic Cone Penetration Test, Shallow – Well Permeability Test, Swedish Weight Sounding Test, Soil Cement and other material in – situ and laboratory testing. e) Interfaced with other areas / discipline on the job such as Shinkanzen’s (Japan ) E & M engineering works. Collected, maintained, reviewed, verified, and preserved documentary records of all activities required by the contract. f) Participate with design team and geotechnical representative in conducting ground & soil investigation (such as test pit, boreholes, SPT, DCP test, Swedish Weight Sounding Test, chemical analysis of soil sample), developing soil- cement in constructing cut & cover tunnel, soil stabilization, etc. g) Prepared daily reports, inspection schedule, progress reports,meetings and written verification that the quality plan are appropriate and properly complied or raised Non – Conforming Report (NCR) of deficient items, design correction and construction defect. Verify and study remedial action and contribute or provided assistance necessary on preventive measures to control such non – conforming work.Strictly implemented safety construction rules and regulations to workers including public, hazard, health and safety.

Name of assignment or project:

RESİDENTİAL & GOVERNMENT BLDG

Year:

Sep, 1999 – Dec, 2000

Location:

Metro Manila, Philippines

Main project features:

1)Foundation / Structural only – Amt: PHP 400k ) of El Pueblo residential development project - Phase II in Town of Novaliches

2)Foundation / Structural Concreting only – Amt: PHP 5M ) of construction of New Malabon City Hall Bldg. in Barangay Catmon

Positions held:

Self - Employed

Activities performed:

Sub-contracting job ( Labor only)

Name of assignment or project:

● CONSTRUCTİON AND HAZARD ELİMİNATİON OF CHALAN PALE ARNOLD ROAD – PHASE V

● INSTALLATİON OF WATER LİNES AND SEWER PİPES ALONG BEACH ROAD AND ACHUGAO AREA

Year:

Sep, 1998 – Jul, 1999

Location:

Saipan, CNMI

Main project features:

Chalan Pale Arnold road – Phase V ( L=15,000 ft, 4 – lanes asphalt with drainage, culvert, retaining walls, 1 Concrete Bridge in Tanapag Area)

Water Lines and Sewer Pipes along Beach Road and Achugao Area

Positions held:

Civil Engineer/ Surveyor / Safety Officer

Activities performed:

a)a) Supervised workmanship, manpower, equipment, survey stake-out, blue toppings of road in construction during backfilling/ cutting/ sub base and base course preparation and asphalting, in accordance with the DPW and CUC work contracts including clearing and grubbing of undergrowth, trees and shrubs; excavation, trenching, earthmoving. Supervise excavation of trenches, water pipeline installation, backfilling and restoration and Tanapag concrete Bridge construction. b) Maintained project safety and protection awareness like interfacing with the US Army Bombs and Hazardous Unit, Historic Preservation Office, Local officials, Power / Underground Utilties officials, Division of Fish and Wildlife and enforce U.S. Occupational Safety and Health Administration ( OSHA ) requirements in accordance with Code of Federal Regulation ( CFR ).

Name of assignment or project:

Ninoy Aquino International Airport Terminal II Project ( BOT )

Year:

Mar, 1996 – Aug, 1998

Location:

Metro Manila, Philippines

Main project features:

Under BOT scheme. Civil and Infrastructure Department

Positions held:

Site Engineer for general contractor

Activities performed:

Took responsibility for site supervision in constructing the airport’s concrete apron ( CTB sub base, 40cm concrete ), viaducts on North and South wings( sub structure and super structure), fuel lines (excavation, trenching, installation and backfilling ), taxiway and carparks with managerial assistance to Japanese superintendents like coordination, joint inspection with sub – contractors, client consultants ( Aeroports De Paris, Japan Airport Consultants ) and engineer inspectors. Factory joint - inspection during contruction of precast slab and guard rail by manufacturer prior to delivery and installation.

Name of assignment or project:

CONSTRUCTİON OF 700 MW COALFİRE POWER PLANT

Year:

Jan, 1993 – Feb, 1996

Location:

Quezon Province, Philippines

Main project features:

Contract amount = U$ 750 M ( under BOT scheme ). Fast track emergency pilot projects of the government of Pres. Fidel E. Ramos.

Positions held:

Section Engineer / Sr. Construction Surveyor

Activities performed:

Represented contractor ( Hopewell of Hongkong ) in joint - inspection and construction, survey layout and supervision, undertake planning, scheduling. avail materials, manpower and equipment in constructing jetty, conveyor foundation, coalhouse, desalination plant, water treatment plant, chimney, access road and bridge, concrete buildings, culverts, tower foundation, perimeter wall, stacker reclaimer / trackworks- sleepers and E & M concrete foundation. Mostly we use slipforming concrete structures, bored piles in foundation for heavy loads.Designates and leads subordinates ( 6 site engineers, 2 surveyors, 1 office enginner ) in their respective field of assignments. Supervise and check installation of Temporary Works such as scaffoldings, wall panels, slipforming, decking, tower crane installation, steel casings, sheetpile, dredging and also proper materials handling. Participated in construction progress meeting, review engineering designs packages, join inspection and coordinating with Ove Arup Consultants and other area of discipline such as Black and Veach International and Mitsubishi Heavy Industries, Napocor and the sub – contractors ( including manufacturers/suppliers).

Name of assignment or



Contact this candidate