Post Job Free
Sign in

Engineer Manager

Location:
Qibla, Kuwait City, Kuwait
Salary:
650
Posted:
October 25, 2019

Contact this candidate

Resume:

Objective

Looking for a challenging career which will demand the best of my professional ability in terms of technical and analytical skills and helps me in enhancing my current skill and knowledge.

Employment

From June 2017 to till date

I have been working in Kuwait Network Electronic Technology Co. W.L.L... (KNETCO) as a PROJECT CONTROLLER(MICROWAVE) dealing with “ooredoo,viva & zain” Operators for “5G E-BAND MICROWAVE” activities.

From June 2017 to March

I have been working in Kuwait Network Electronic Technology Co. W.L.L... (KNETCO) as a MICROWAVE Engineer dealing with “ooredoo,viva & zain” Operators for “MW,BSS & Power” activities.

From September 2016 to June 2017

I have been working in Wajda International Trading Company as a Telecom Site Engineer dealing with “ooredoo,viva & zain” Operators for “MW,BSS & Power” activities.

Experience

Ericsson Projects

September 2016 to December 2016

Project1: New sites 2016 installation and integration “Ooredoo operator“

Project2: Walk test for IBS sites for “Zain kuwait operator”

November 2016 to January 2017

Project3: LTE 800 Dismantle and relocation “Ooredoo operator”.

Fastelco & Ooredoo Projects MW (Huawei&Ericsson equipment)

January 2017 June 2017

Project4: Fastelco Kuwait & “Ooredoo operator” broadband over microwave link.

KUWAIT VIVA 2017 MBB PROJECT

June 2017 to January 2018

Project5: VIVA 2017 Microwave expansion on existing links. (Dismantle old equipment and install new equipment as per design and upgrade the link to xpic)

November 2017 to December 2017

Project6: VIVA 2017 Microwave backup link

June 2017

Project7: viva 2017 Microwave congestion.

January 2018 till date

Project8: VIVA MW 2016 & 2017 Microwave reroute. (Dismantle the existing link from old uplink and install in new uplink as per design and change traffic make site up)

Project9: VIVA MW 2016 & 2017 TDM TO IP CHANGE, LTE ADDTION FOR IBS (swap old 3G BTS WITH BTS3900 AND ADD LTE 1800) Swap RTN 600 with RTN 910A.

KUWAIT VIVA 2018 MBB PROJECT

Aril 2018 to till date

Project10: VIVA 2018 Microwave expansion on existing links. (Dismantle old equipment and install new equipment as per design and upgrade the link to xpic)

Project11: VIVA 2018 DATACOM AND DWDM METRO RING Dismantle HUAWEI CX600 WITH ATN980. Replace the microwave links with HUAWEI ATN910, fiber patching, HUAWEI OSN1800 installation. ATN950B,C,ATN980B installation and fiber patching.

Project12: VIVA 2018 HYBRID POWER. Swap the existing rectifier with new HYBRID HUAWEI POWER CABINET, INSTALL DC AC and ALARM PATCHING.

OOREDOO KUWAIT

September 2018 to october2018

Project13: OOREDOO data center maintenance and HUAWEI MPLS fiber link. Trouble shoot and make new fiber link between the servers in data centers and MOC fiber link ring completion for ooredoo Huawei MPLS DWDM. Datacom fiber patching and Huawei ATN equipment installation.

KUWAIT VIVA 5G MW UPGRADE

Dec 2018 to till date

Project14: VIVA 2019 Microwave upgrade. Make New 5G E-BAND 80G SDB links and combine with existing XPIC links by SPLA, and make traffic through 10G PORTS ON new E-band link.

Project15: VIVA 2019 5G DATACOM. Swap old ATN910B,950B with NEW 5G ATN950C and 910C equipment within the MDT time and make cut over.

Scope of work of these projects

Visit the site for survey and collect all required information

Follow up team work and material delivering

Install the equipment on the site

Supervising teams on sites to do standard installation

Doing Passive intermodulation (PIM) test for each site new antennas

Installing the “Microwave indoor units and power equipments”.

Installing the “Microwave antennas and radios”.

Make backup for the site and all required backup required before the activity

Commissioning the site as per planed activity and technology.

Doing integration for planed number of sites per night as per the target

Confirming site on air and clear any alarm appearing on the site

Complete the site quality and take the requested Photo package.

Doing SRS test for newly integrated sites.

Dus pooling for the relocation sites with new dus or same dus.

Antenna reorientation and cell id change.

Prepare photo package for each site and upload it to site handler “

Snag clearance after ooredoo team Comments and doing required reports for this

Follow up acceptance document till get approval

Getting Customer sign in Provisional Acceptance Certificate (PAC)

Forward this PACs to finance department so they can invoice for these sites

Microwave Transmission

Installing the “Microwave Indoor units and power Equipment”

Installing the “Microwave Antennas and Radios”

1+0 link commissioning

Xpic link commissioning both “Ericsson and Huawei”

1+1 protection SD link commissioning

Sd xpic link commissioning

MW link troubleshooting both “Ericsson and Huawei”

Follow the Network safety while working on Live network.

Follow and do the EHS while working on site by using HUAWEI ISDP TOOL.

Doing site sign and site verify on HUAWEI ISDP TOOL

Upload photos and prepare documents for site acceptance

Prepare AAR for new installing materials and ACR for dismantling materials For VIVA KWT

Configure the traffic and make the site on air with in the MDT.

Skills

Ericsson

RBS 6601“installation and commissioning “

SIU “installation and commissioning “

Passive intermodulation test for antennas

SRS test.

Walk test for IBS sites.

Mini link TN “installation and commissioning”

Mini link PT2020 installation and commissioning”.

AMM 20P “installation and commissioning”.

AMM 6p “installation and commissioning”.

Tools

HUAWEI WEB LCT

HUAWEI U2000

Ericsson smart laptop.

SIU Element manager.

RBS element manager.

MOSHELL .

TEMS investigation 10.

MAP info.

Huawei

RTN 910 “installation and commissioning”.

RTN 950 “installation and commissioning”.

RTN 980 “installation and commissioning”.

RTN 310 “installation and commissioning”.

RTN380H “installation and commissioning”.

RTN380AX “installation and commissioning”.

Handling WEB LCT and U2000 SOFTWARE

Handling ISDP TASKS

Handling WDT software and deploy scripts to BBU

BBU3900 BBU3910 “installation and commissioning”.

BBU5900 “installation and commissioning”.

.

CERTIFICATION

Certified Automation Engineering, under taken by Hindustan Automation, India.

- PLC(DELTA, SIEMENS, SCHNEIDER,OMRON, ALLEN-BRADLEY)

- HMI & SCADA.

- VFD

- SERVO SYSTEMS.

- INSTRUMENTATION & PANEL BOARD WIRING

Holding HUAWEI EHS safety passport.

Attended the KNPC EHS training and holding GATE PASS Working inside the KNPC SITE

EDUCATION

Bachelor of Engineering in Electronics and communication Engineering, M.I.E.T ENGINEERING COLLEGE, (affiliated to ANNA UNIVERSITY CHENNAI), India.

ACADEMIC PROJECT

Title: Optimize the throughput and Delay of data transmission between two base station over LEO SATELLITE Using Quadrature Phase Shift Keying (QPSK) Modulation

Software: OPNET Modeler14.5 R & D SIMULATOR

Description: The project is to develop two radio networks which was geographically separated and packet data transmission happens between two base stations for each radio network through LEO satellite with and without on-board data buffers. The modulation used for the transmission is QPSK. To scale the parameters such as throughput, delay and end to end service two scenarios and they are buffered satellite. Protocol used in this project was CSMA PROTOCOL.

Computer Skills

Programming Languages

C language, C++.

Web Skills

HTML basics

Application Packages

MS power point, Ms word, Ms excel.

Platforms

Microsoft Windows XP, VISTA, 7,8.

Passport Details

visa article no: 18 ( transfer able )

Passport no: L7337713

Date of issue: 25/02/2014

Date of expiry: 24/02/2024

Language

English,

Hindi,

Tamil.

GUGAN KUPPUSAMY

Email: *****.****@*****.***

Mobile: +965-********



Contact this candidate