Nestor J. Loredo

**** *.*. ***** *****, Miami, Florida Tel: 305-***-****

E-Mail: ************@*********.***

OBJECTIVE Join a progressive, growth oriented entity, looking for a Seasoned Project Executive.

PROFESSIONAL

EXPERIENCE

PROJECT MANAGEMENT & OPERATIONS (EMPLOYMENT HISTORY PAGE 15)

Managed all facets of Construction Projects on Contracts ranging up to $140M

Multi Construction Project Experience

Multi-Story

Planned Urban Developments

Airport

Hospital

Regional Malls

Schools

Restaurants

Banks

Theme Parks

Marinas

Churches

Developed and Maintained Project Specific Administrative procedures

Establish Job Descriptions and Recruit Key Personnel

Monitor and Offer Daily Support to Field Operations

Manage a Staff of over 40 individuals, with a Subcontractor Manpower force of 1,500

Developed self-sufficient operating entities within a Company

Establish Subcontractors Bonding Lines

Interface with Local Governing Agencies

Developed and Maintained CPM Project Schedules

Negotiate and Award Contracts

Versed in various types of Project Delivery

Design Build

Fastrack

Partnering

GMP

Lump Sum

Page 2

CONSTRUCTION

OPERATIONS

EXPERIENCE

Have been responsible for Field Operations for both a Structural Contracting Company and General Contractor, dealing in mid-rise Buildings, Hospitals, Post- Tension, Conventional, and Reinforced Masonry Construction.

Transitioned a $18M Annual Sales Company with “No” Job Costing Experience, to being able to track $64M of Annual Sales using Job Costing while realizing a 24% Profit Margin.

Directed Project Management Operations for the Construction of a

$125M Fast-Track Project, with over 12,500 pricing exercises, Dolphin Mall.

Directed the daily Business Operations of Small Commercial Construction Companies having Annual Sales $40 to $80M.

Successfully have merged two Commercial Construction Companies into one Operating entity.

Successfully Managed a 52 Supervisory Employee Force that operated throughout Florida

Directly Managed a 120 Employee Carpenter Force in the Construction of Mid- Rises throughout the Tri-County South Florida Area

Streamlined Business Operations by Coordinating Employee reporting Structures thereby increasing productivity

Standardized Companywide Project Administration Systems

Implemented Mechanized checks and balances between Operations and Accounting to correlate Receivables to Payables

Recruited, Managed, and Supervised new Employees

Actively participated in the Policy Making of Companies

Responsible for Short and Long Term revenue Projections for Companies

Continually Hosted a National and International Client Base

Successfully Mitigated on behalf of Companies through difficult Client Claims

outside of the Courts and without any Secondary Subcontractor Suits

Have Favorably dismantled Companies at the desire of Ownership while regarding both, Clients and Employees, while actively assisting Employees in the procurement of ongoing Employment

Successfully negotiated and awarded Key Projects

Actively Marketed Company Accomplishments for procurement of new work

Have been Responsible for Project Estimates for various Companies

Have been directly Responsible for Profit and Loss of Operating Companies Page 3

BUSINESS

DEVELOPMENT

ORGANIZATION &

RECORD KEEPING

Have participated in the arrangement of International Financing on Projects in the Caribbean, Loan Amount US$250M.

Quadrupled Annual Sales of combined entity, from US$17M, to US$68M

Work with Clients in presenting Loan Packages to Banks

Actively pursue Architects, Subcontractors, and Clients for new Projects

Prepared detailed feasibility studies for various successful Projects to ensure Budget compliance to Contract Award

Coordinated effective Sales and Marketing Plans for Residential and Commercial Property Portfolios

Have arranged Mortgage Financing in the Caribbean via American Secured Investments

Developed and Maintained effective record storage Systems, resulting in substantial time savings for handling Project documents and monitoring unit cost indices

Standardized Project Administration at various Companies PRESENTATION &

COMMUNICATION

Spearheaded presentations to Local & State Governing Agencies

Directed Pre-Construction progress meetings to ensure budget compliance and timely development of Construction Documents

Chaired Meetings with Company Employees regarding ongoing Company Policies and Revenue Goals

Encourage a “Team” Atmosphere to the Delivery of a Project and work to Discourage “I” posturing of Individuals

Page 4

CONSTRUCTION

PROJECTS

2019

2018 - 2019

2017 - 2018

2016 - 2017

2016 – 2017

2014 - 2016

2013

2012

2011

2011

2011

2010 - 2011

2010

ELAN – Apartment Building & Garage Doral, Florida

Garage Post Tension Slab, Reinforced Masonry and Concrete Shear Wall Construction, Apartments Conventional

Client GREYSTAR

Tower 5 – Apartment Building & Garage Doral, Florida Post Tension Slab, Reinforced Masonry and Concrete Shear Wall Construction Client GRYCON

Parking Garage 4 – Garage Doral, Florida

Pre-Cast Joists & Beams and Concrete Shear Wall Construction Client GRYCON

Tower 10 – Apartment Building & Garage Doral, Florida Post Tension Slab, Reinforced Masonry and Concrete Shear Wall Construction Client Gomez Construction Company

Parking Garage 3 – Garage Doral, Florida

Pre-Cast Joists & Beams and Concrete Shear Wall Construction Client Gomez Construction Company

Construction Claims

Merrick Place – Condominiums & Garage Miami, Florida Post Tension Slab, Reinforced Masonry and Concrete Shear Wall Construction Client JAXI Builders

2020 Salzedo – Apartment Building and Garage Coral Gables, Florida Tension Slab, Reinforced Masonry and Concrete Shear Wall Construction Client Facchina

Modera II – Apartment Building Miami, Florida

Post Tension Slab, Reinforced Masonry and Concrete Shear Wall Construction Client Mills Creek

Construction Claims

Hialeah Park - Flamingo Casino Expansion Hialeah, Florida Steel Frame Structure with Concrete Foundations and Reinforced Masonry.

Client Link Construction

Northwest Medical Center Expansion Margate, Florida Steel Frame Structure with Concrete Foundations and Shearwalls

Client Robins & Morton

Rita Gardens - Shopping Center & Offices Doral, Florida Post-Tension Slabs, Reinforced Masonry and Concrete Shear Wall Construction

Client Design Build & Management

Page 5

2009 - 2010

2009

2009

2008

2008 - 2009

2007 – 2008

2007

2006 - 2007

2006

2005 - 2006

2005

2004 - 2005

2004

Parkview Gardens - Multi-Family Housing Miami, Florida Conventional Slabs with Reinforced Masonry Construction

Client Link Construction

Memorial West - 60 Bed Expansion Pembroke Pines, Florida Pre-Cast Joist and Wet Beam Slabs, with Concrete shear Walls and Reinforced Masonry Construction.

Client ANF Group

Joe Di Maggio - Hospital Expansion Hollywood, Florida Pre-Cast Joist and Wet Beam Structure

Client ANF Group

Joe Di Maggio - CEP Addition Hollywood, Florida

Pre-Cast Joist and Wet Beam Structure

Client ANF Construction

Memorial West - CEP Addition Pembroke Pines, Florida Pre-Cast Joist and Wet Beam Structure

Client ANF Construction

Biscayne Square - Shopping Center & Offices Hollywood, Florida Steel Frame Structure with Concrete Foundations and Shearwalls

Client H & H Development

YMCA - Allapatah - Low Income Apartments Miami, Florida Post Tension, Concrete Shear-Walls & Reinforced Masonry Construction

Client B J & K

Red Road Commons - High-End Apts Miami, Florida

Conventional Slabs, Steel Columns, & Reinforced Masonry Construction.

Client Coastal Construction

Eloquence on the Bay Normandy Isle, Florida

Luxury Condominiums & Parking Garage

Post-Tension Slabs with Reinforced Masonry Construction and Shearwalls

Client CDC Construction

Gallery Art - Luxury Condominiums Miami, Florida

Post Tension, Concrete Shear-Walls & Reinforced Masonry Construction

Client H & H Development

Space-01 - Condominium & Parking Garage Normandy Isle, Florida Post-Tension Slabs with Reinforced Masonry Construction and Shearwalls

Client KM Plaza

Merrick View - Office Condominiums Coral Gables, Florida Post Tension, Concrete Shear-Walls & Reinforced Masonry Construction Professional Office Building - Office Condominiums Miami, Florida Post Tension, Concrete Shear-Walls & Reinforced Masonry Construction Client Gomez Construction

Page 6

2004 - 2005

2004

2004

2004

2004

2004

2004

2003 - 2004

2003

2003

2002 -2003

2001 - 2002

Mediterranea - Luxury Condominiums Miami, Florida

Post Tension, Concrete Shear-Walls & Reinforced Masonry Construction

Client H & H Development

Douglas Place - Luxury Condominiums Miami, Florida Post Tension, Concrete Shear-Walls & Reinforced Masonry Construction

Client H & H Development

Bimini Bay - Residential Development Bimini, Bahamas Multi-Family, and Single Residence Construction

Client Geraldo Capo

Bimini Bay - Infrastructure Development Bimini, Bahamas Roadways & Underground Utilities

Client Geraldo Capo

Bimini Bay - Sewer Plant Installation Bimini, Bahamas Industrial Equipment Installation

Client Geraldo Capo

Bimini Bay - Concrete Batch Plant Bimini, Bahamas

Industrial Equipment Installation

Client Geraldo Capo

Bimini Bay - Electrical Sub-Station Bimini, Bahamas Industrial Equipment Installation

Client Geraldo Capo

Bimini Bay - Marina Bimini, Bahamas

Mega-Yatch Facility

Client Geraldo Capo

Villa Calabria - Luxury Condominiums Coral Gables, Florida Post Tension, Concrete Shear-Walls & Reinforced Masonry Construction

Client H & H Development

Memorial West - Medical Office Building Miramar, Florida Pre-Cast Joist & Reinforced Masonry Construction

Client ANF Construction

Douglas View - Luxury Condominiums Miami, Florida

Post Tension, Concrete Shear-Walls & Reinforced Masonry Construction

Client H & H Development

100 Andalusia - Luxury Condominiums Coral Gables, Florida Post Tension, Concrete Shear-Walls & Reinforced Masonry Construction

Client Coastal Construction

Page 7

2001

2001

2001

2001

2001 - 2002

2001

2001 - 2002

Valencia Garden Apartments South Miami, Florida

Foundation work for Tunnel Form Structure Nine (9) Stories high with Parking Lot Garage

Garage Post-Tension System

AQUA On Allison Island Miami Beach, Florida

Two (2) Adjoining Eleven Story Towers, Shell Contract

Post-Tension Slabs

Client TURNER Construction Company

Porto Belagio Sunny Isles Beach, Florida

Four (4) Reinforced Masonry Structures, Shell Contract.

Two (2), Six stories, & Two (2) Nine stories, structures

Pre-cast Parking between Structures, 1In. Clearance between Bldgs.

Client SUFFOLK Construction Company

Jefferson @ Young Circle Hollywood, Florida

Two Adjoining Multi-Story Apartment Buildings. One structure Nine floors, second structure Six floors. Shell Contract.

Project Profile:

Tight Site

Precise Subcontractor Coordination required

Reinforced Masonry

Client JPI

Country Club Villas Miami Lakes, Florida

Nine (9) Apartment Buildings, two (2) story

Project Profile:

Reinforced Masonry Construction

Self-Performed Steel Erection

Client R.S. Development

Pembrooke Villas Hollywood, Florida

Twelve (12) Apartment Buildings, two (2) story

Project Profile:

Reinforced Masonry Construction

Self-Performed Steel Erection

Client R.S. Development

The Alexan at Coral Gables Miami, Florida

Fifteen Story with Six Story Parking Deck Garage. Fast Track Shell Contract. Project Profile:

Tight Site

Limited Site Logistics for Staging

Contractor Controlled Insurance Program

Post-Tensioned Slab

Client TURNER Construction Company

Page 8

2001

1999 - 2001

1997 - 1998

1997

1997

Parrot Jungle and Gardens Miami, Florida

Administrative Building, Café, and Parking Garage Development. Project Profile:

High Political Profile Project

Davis-Beacon Prevailing Wages

Cast-In-Place Concrete over Pre-Cast Beam System

Profit Margin trending, 16.27%

Client The Tower Group

Dolphin Mall Miami, Florida

Regional Mall 1,600,000Sq.Ft.

Project Profile;

Over 1,400 Owner Introduced changes to Base Scope totaling $35M

Over 1,700 RFIs

No time extension given

Multi-Project Coordination

Fast Track Build Design Delivery System

GMP Contract, 0% share on savings, $0.750M Contingency, 2.5% Fee

Client The Taubman Companies (Stock Symbol TCO)

Suntrust Bank Bal Harbour, Florida

Branch Bank Facility, Two Story, High End. Construction cost $270/Sq.Ft.

12,000 Sq. Ft. Facility Two Stories

Erase an existing Facility Build the New Structure on a tight site while maintaining the Bank Operating

Partnering process inclusive of Pre-Construction Services

GMP Contract, 50% Share in Savings, $0 Contingency, 5.5% Fee

Client, SUNTRUST Banks

Homeless Assistance Center Homestead, Florida

Suburban Style Campus built to provide a means for the Re-integration of the Homeless back into Society

Project Profile;

150,000 Sq. Ft. consisting of seventeen interconnecting Buildings

Project make-up

Administrative Buildings Dormitories

Classrooms Day Care Center

Medical Facilities Central Boiler Plant

Politically Sensitive Project involving the Office of the Mayor, Dade County Florida

Client, Miami – Dade County

BJ’s Warehouse Miami, Florida

140,000 Sq. Ft. Tilt Shell

Project Profile;

In-House Development Project

GMP Contract, 50% Share in Savings

Page 9

1997

1997

1997

1997

1996 - 1997

1996 – 1997

Senor Frogs Restaurant Miami, Florida

Restoration into Code Compliance of a 17,000 Sq. Ft. Structure Project Profile;

Marginal Financing

Project curtailed to available Financing

8

th

Street Shopping Plaza Miami, Florida

Strip Shopping Center

Project Profile;

Extremely Underfunded Owner

Lump Sum Contract

Just-For-Feet Hialeah, Florida

Twenty Thousand Sq. Ft. Building, Tilt-Wall Construction Project Profile;

Owner Controlled Utilities Package, completed late.

Final Electrical Inspections received via Rented Generator Sets

Final Fire Sprinkler and Plumbing Inspections received by Temporary connection to Street Fire Hydrant

GMP Contract, 50% Share in Savings, $0 Contingency, 6.5% Fee

Returned $75,000 to Owner on Completion

Smart & Final Ft. Lauderdale, Florida

Tilt-Wall 25,000 Sq. Ft. Structure

Project Profile;

Proposed Tilt-Wall Alternate to CBS Construction

Pre-Purchased and Awarded all Subcontracts

GMP Contract

50% Share of Savings

Northgate Regal Theaters Tampa, Florida

20 Screen Stadium Seating Facility

Conventional Construction

United Methodist Church Miami, Florida

Building Addition and Renovation to Existing Church Project Profile;

Extremely weak set of Construction Documents

Owner with limited Funding

Completed on-time no Project Cost overrun

Client, United Methodist Church

Page 10

1997

1996 - 1997

1996

1996

1996

1996

Just-For-Feet Coconut Grove, Florida

Twenty Thousand Sq. Ft. Building Conventional Masonry Construction 12 Week Duration.

Project Profile;

Zero Staging Area

Building Downtown with operating businesses on all sides

Fast Tracked

GMP, 50% Share in Savings, 6.5% Fee. Returned $135K to Owner upon completion

BRAMAN Automobile Service Center Miami, Florida

State of the Arts Automobile Service Center

Project Profile;

Multi Hydraulic Lifts

Paint Shop

Car Wash

Parts Storage

Customer Receiving Areas

Administrative Spaces

Mayfair Regional Mall Renovations Coconut Grove, Florida Regional Mall Renovation

Project Profile;

Renovations to 250,000 Sq. Ft. Shopping Center Common Areas

Interconnecting Two Underground Parking Garages

Maintaining at all times the Mall Open to the General Public

Fast Tracked Construction

Owner doubled Project scope with Zero Time extension

GMP Contract

Client, Lennar

Cobb Shadowwood Theater Cypress Creek, Florida

Conventional Sloping Theater Design

Project Profile;

Renovations to operating Twelve Screen Theater

Building addition adding Four New Screens

Borders Book Stores Coconut Grove, Florida

American Airlines Miami International Airport

Baggage Chutes and Pilot Assignment Area

Project Profile;

Complicated Logistics for Material and Subcontractor forces

Areas required being maintained in operation at all times

Tight Construction Schedule

Client, American Airlines & DCAD

Page 11

1996

1996

1995-1996

1990 - 1992

1989 - 1990

American Airlines - Admiral's Club Miami International Airport High End Lounge

Project Profile;

Complicated Logistics for Material and Subcontractor forces

Areas required being maintained in operation at all times

Tight Construction Schedule

Client, American Airlines & DCAD

Holy Cross Academy Miami, Florida

Private Middle School, consisting of;

Classrooms

Administrative Offices

Cafeteria

Laboratories

Playing Fields

Temple Israel Restoration Miami, Florida

Historic restoration of Oldest Jewish Temple in Miami. Project Profile;

Underfunded Owner Project which lead to focusing Owner funds to selected scope being completed

Extensive Asbestos Abatement

Classrooms

Temple restoration

Administrative Functions

Auditorium

Medley Truck Stop (Owner/Operator) Medley, Florida Multi-Phased Project, which first opened as a gas bar. Phase II was an 8,000Sq.Ft. Structure, consisting of a Convenient Store, Restaurant, and Parts Supply store. Phase III was the construction of a Motel. Southern Bell South Florida Computer Center Miami, Florida Electrical Renovations to Main Building Feeders and Emergency Generator Plant Synchronization

Project Profile;

Interconnect two 4,000Amp Main House Service Panels

Synchronize the operation of three 750KW Turbines and one 2500KW Diesel Generator

Develop and implement control scheme to synchronize Emergency Generator Plant while overlapping with local Utility Electrical service to create “transparent” transfers between Commercial and Emergency Power.

Modified General Electric Air Breakers to perform as high velocity Switches. Overlap times were restricted to 40milliseconds, averaged 38. Page 12

1989

1988

1987

Southern Bell South Florida Computer Center Miami, Florida In-House Design and implementation to increase overall Building Survivability for Computer Operations in the event of Commercial and Emergency Power Plant Failures.

Survivability of Building at Project commencement had been clocked as having a 5 Minute window. This was the transfer time to back-up systems and transfer 411 and 911 operations to other Computer Centers within the Bell Network.

Project Goal was to increase window to 10 Minutes by modifying existing Electrical and Mechanical Systems in-place

Window was increased to 15 Minutes at Project Completion

All work performed with no interruption to any services Southern Bell South Florida Computer Center Miami, Florida In-House Design to modify Central Chiller Plant Controls to;

Increase Computer on-time in the event of loss of Electrical Power by utilizing the Chill Water in Building Loop to feed Water Cooled Computers

Synchronize the operations of three, 300 Ton and one, 450 Ton Chiller

Introduce “Intelligence” to the Control System by it being able to analyze the failure of the assembly, recognize the component that failed, search from the other assemblies available for a similar component that would be available, re-configure itself to a complete system and bring itself on-line to assume operation.

Concurrently, alarm to a central location requesting service and identifying the component that failed, while advising what components had been annexed to resume operation

Southern Bell South Florida Computer Center Miami, Florida Installation of Multiple UPS 450KVA Power Plants. Both, 60 Hertz and 415 Hertz Equipment. Inclusive of Buss Duct Distribution. Project Profile;

Provide redundant U.P.S. Power back-up to critical Computer Equipment through cascading Transfer Switches to Overall Power Plants

And, Or, Load Drop Compensators

Critical work coordination requiring tight windows for Switch Overs Page 13

1986 - 1988

1985 - 1986

1984

1982 - 1983

Southern Bell Miami, Florida

In-House Design for Two Year Program to remove and replace Oversized Inefficient Chillers with specific units matching current Building Cooling Loads. Project Profile;

Southern Bell’s Capital Construction Program of the Seventies Forecasted Building Space and Cooling requirements based on footprints and heat loads of equipment of the Seventies.

Modernization of Telephone Equipment led to higher performing equipment requiring less of a footprint that operated with a lower heat load.

This led to Switching Offices in the Eighties that were 40% occupied, having a heat load of 50 to 70 Tons, having parallel 300 Ton Chillers that were rapid cycling.

This created high maintenance and operating costs of the existing machines

Pay back studies were initiated to equate the justification of Capital Investment to replace the existing Equipment if the expense would pay itself back within Two Years

Program was carried out in Broward, Dade and Monroe Counties.

All work performed without interruption to ongoing Building Operations

Southern Bell/ATT Divestiture Team Tri-County Area Responsible for the Construction of Administrative Space for the segregation of ATT and Bell South work forces. 350,000 Sq. Ft. throughout a Tri-County area. Tight Schedules that needed to comply with ongoing Joint Company underlying time frames for compliance regarding divestiture.

Project Profiles;

Fast Track Projects

In-House Designs

Interconnected series of Projects. Project Delivery could not be late as it affected others Projects, for vacated spaces.

Tight Schedule Control

Miami Heart Institute Miami, Beach, Florida

Took Phase I through HRS Certification, and prepared for Phase II Construction of Precast Parking Garage.

Project Profile;

Addition and remodeling to existing operating hospital

Annex consisting of Design Build Alternate Precast Parking Garage Southern Bell Miami, Florida

Responsible for vacating Company Leased facilities while Building Administrative Space inside of Company Owned Buildings. Project Profile;

Strict Scheduling Constraints

Fast Tracked Projects

In-House Electrical, Mechanical, and Plumbing Designs Page 14

CONSULTING

PROJECTS

1999

1994

1993

1990 - 1992

1990

1987

1986

Arcor Construction Volos, Greece

Preliminary Advise and Consultation in P.U.D. Development Project. Consisting of Marina, Condominiums, Hotel, Golf Course and Marina. Evaluation of Site Plan Development, and Preliminary Architectural Layout, and Site Visit in Greece.

JTL International Tsaitung, Taiwan

Proposed Theme Park Construction in Southeast Taiwan Provided General Infrastructure Development Advise as it pertained to Land and Infrastructure Development

Safehaven Georgetown, Grand Cayman

Utilization of G-Nav, Loran, and Sat-Nav Signals to coordinate exact Latitude Longitude Coordinates for Dredging Operations, self-developed Program to coordinate.

Project Criteria:

Increased productivity of ongoing Dredging Operation by contending with constantly changing Land Profiles

Ability to pin-point critical site locations at any time, during ongoing reclamation processes

Cayman Island Yacht Club Georgetown, Grand Cayman

Development of Sales & Marketing Program of P.U.D. Retail Value: $450M Mixed used consisting of Homes, Hotel, Marina, and Commercial Site Project Criteria;

No general use of I-Net as of the time

Digital Camera Technology was limited and not universal in application

Developed a DOS based program to host Property Portfolio

Digital Camera prevalent at time Sony having a unique sized floppy disk that needed to be converted by interface with a PC.

Transmission hosted via 2,400 Baud Rate Modem using a Telephone Line

Results Established Long Term Financing Instruments in Third World Countries using American Financing Sources

Shellborne Beach Hotel Miami Beach, Florida

Feasibility Study Developed for Uruguayan Investor Group, looking to invest in South Florida

Mutiny Hotel Coconut Grove, Florida

Feasibility Study Developed for Local Investment Group as Hotel was already in receivership. Property built paralleling feasibility Study. Orr’s Pond South Miami, Florida

Feasibility Study Developed for the Construction of a Residential Community. Page 15

EMPLOYMENT

HISTORY

2016 TO PRESENT

2014 TO 2016

2001 TO 2014

1999 TO 2001

1997 TO 1997

1996 TO 1997

1990 TO 1996

1987 TO 1995

1985 to 1990

1984 TO 1985

1980 TO 1984

Formcrete LLC Miami, Florida

Project Manager

Consultant - Forensic Analyst, Claims & Litigation Miami, Florida L & R Structural Corporation, Inc. Miami, Florida

Operations Manager

Contract/Operations Troubleshooter

Safety Director

In-House Scheduler

Accounting/Operations (Job Costing) Interface

Senior Project Manager

Hoar Construction, LLC Miami, Florida

Senior Project Manager

Phillips Adler Construction, Inc. Miami, Florida

Vice-President, Co-Qualifier

Director of Construction and Estimating

Waas Phillips-Construction, Inc Miami, Florida

Qualifier

Director of Construction and Estimating

Senior Project Manager

Omega Development Group, Inc. Miami, Florida

Executive Vice President/Partner

YLYD Holdings International Miami, Florida

Owner

Southern Bell Miami, Florida

Building Construction Staff Manager

Wallbridge Aldinger Miami, Florida

Project Manager

Southern Bell Miami, Florida

Construction Engineer

Page 16

EDUCATION

1978 – 1980 University of Miami Coral Gables, Fl

B.S., Mechanical Engineering

Full Academic Scholarship

Graduated Summa Cum Laude G.P.A. 4.00

1975–1978 Miami-Dade Community College Miami, Fl

A.A., Engineering Academic Scholarship

Graduated Summa Cum Laude G.P.A. 3.96

RELATED

TRAINING

Workmen's Compensation Law Ongoing Since - 2001

Arbitration, Mediation, & Lawsuits, Analysis Ongoing Since - 1989

Corporate Law vs. Liability Applications Ongoing Since - 1980

Workmen’s Compensation Law Ongoing Since - 1997

OSHA Training, Safety Ongoing Since - 1985

Accounting Night Classes – 1993

Effective Speaking Skills Bell Systems – 1990

Managing Personal Growth Bell Systems - 1990

Reverse Osmosis Water Purification Systems 1989

Managing Labor Relations Bell Systems - 1989

Emergency Generator Plant Design Bell Systems – 1989

High Performance Living Bell Systems – 1989

Managing in a Competitive Environment Bell Systems – 1988

Excellence in Leadership Bell Systems – 1988

Excellence Through Teamwork Bell Systems – 1987

Mortgage Broker Training - 1987

Managing Managers–The Appraisal Process Bell Systems – 1987

HVAC Controls (Water Cooled and Split Systems) Bell Systems – 1987

Managing Interpersonal Relationships Bell Systems – 1986

Leading & Developing Others Bell Systems – 1986

Listening Skills Workshop Bell Systems - 1986

Co-Generation Plant Design Bell Systems - 1985

Toastmasters – Public Speaking Bell Systems - 1984

Effective Reading – Speed Reading Bell Systems – 1983

Introduction to Stress Management Bell Systems – 1982

Building Energy Management Systems Bell Systems - 1982

Building Mechanical System Design Bell Systems - 1981

Building Electrical System Design Bell Systems - 1981

Fire Alarm Design Bell Systems – 1981

Construction Project Management Bell Systems – 1980

Time Management Bell Systems – 1980

- END -