MOHAMED SEDEEK
Construction Manager/ Senior Civil Engineer. With 17 years’ Experience.
B.SC Civil Engineering - QMS Lead Auditor
I Have a Transferable Visa in KSA.
My experience in various kinds of projects such as Real Estate, Royal Palaces, Cement Plants, Power Stations, Fertilizer, Petrochemical, LNG (Liquefied Natural Gas), Water treatment Stations and Pipe Line.
My work experience role in Management, Consultant, Construction, QA/QC, Commissioning, and Handover works.
Applied Position: Construction Manager
Cellular Phone: +966-***-****-**, +966-***-****-** E-mail Address: *********@*****.***
Current Address: 5 ST Alasklany, Dist. Tiba 2, Jeddah, KSA ACADEMIC ATTAINMENT:
Engineering Education
B.SC in CIVIL ENGINEERING, from HELWAN University, A.R.E. 2002. Dec.-April 2003, Berlitz.
Basic Business Skills Acquisition Program (BBSA).
TECHNICAL QUALIFICATION:
PMP Preparation Course 35 hours.
I Prepare for 6
th
Edition PMP Exam in 2019.
Quality Management System Certified Lead Auditor. Certificate No: 22663 From Moody International accredited by UKAS, IRCA REFERENCE IPC 17072 According to: ISO 9001: 2000.
EXPERIENCE:
From Apr. 2018 till Now in (SDC)
Saudi Diyar Consultant in Jeddah, Saudi Arabia.
Work as the Senior Civil Engineer of Consultant in Aljazeera Royal Palace for All Running Projects.
Owner: RPA (Royal Palaces Affairs)
PMO: EC-HARRIS International
Main Contractors: NESMA, ALBAWANI, SETE… Ext.
Total Budget: Unlimited
RESPONSIBILITIES:
I'm responsible as the Section head of the Consultant civil discipline to manage, follow up and to check up the Contractors works to assure all works applied and constructed as per the Project Spec., Workshop drawings, Standards and Codes. My duties as below:
- To Prepare and manage all meetings with all concerned parties to discuss the related issues and projects concerns.
2/8
- To review and approve all structural shop drawings and technical transmittal related to executing in site according to standards and Project specifications.
- To review and approve ITP’s and checklists of all activities according to project quality plan.
- To verify and approve Method statements, subcontractor’s prequalification’s and material approval.
- To verify and manage all civil activities in site (Piles, Excavations, Backfilling, Skeletons, Tanks, Roads, and Insulations works).
- To control the contractor quality of work through site meetings and documented by RFI, Site Instruction, SDR, and NCR.
- To review and approve as built drawings.
- To plan and manage all procedure of commissioning and handover mission. From Oct. 2015 till Dec. 2017 in (AEC)
Albwardi for Engineering and Consultant in Riyadh, Saudi Arabia. Work as Senior Construction Engineer of Consultant (AEC/KEO) in RAYA’DAH HOUSING COMPLEX, JEDDAH.
Owner: ALRA’DAH Investment Company
PMO: KEO International
Main Contractor: MAPA
Total Budget: 2 Billion SR (2
nd
Phase)
This Project the Biggest Residential Project in Jeddah on 2.5-Million-meter square divided for 6 stages we worked now in second stage, and it’s contains 74 Building as Turnkey Project.
RESPONSIBILITIES:
I'm responsible as the Section head of the Consultant civil discipline to follow up and to check up the Contractor QA/QC Department to assure all works applied and constructed as per the Project Spec., Workshop drawings, Standards and Codes. My duties as below:
- To review and approve all structural shop drawings and technical transmittal related to executing in site according to standards and Project specifications.
- To review and approve ITP’s and checklists of all activities according to project quality plan.
- To verify and approve Method statements, subcontractor’s prequalification’s and material approval.
- To verify and manage all civil activities in site (Piles, Excavations, Backfilling, Skeletons, Tanks, Roads, and Insulations works).
- To control the contractor quality of work through site meetings and documented by RFI, Site Instruction, SDR, and NCR.
- To review and approve as built drawings.
- To plan and manage all procedure of commissioning and handover mission. From Oct. 2014 till Oct. 2015 in (Khatib and Alami) Saudi Consolidated Engineering Company in Riyadh, Saudi Arabia. Work as QA/QC Manager of Consultant in KAP1.
Owner: Ministry of interior.
Main Contractor: Saudi Oger.
Total Budget: 7.4 Billion SR
This Project is 20 sites of work in Jazan Area with the interior ministry in 3/8
high quality finishing as Turnkey projects and Variety in its Functions to cover all new areas around Jazan as it’s a border Area. RESPONSIBILITIES:
- To review all project documents such as contracts, project specifications, drawings, contractor project quality plan.
- To review and approve ITP’s and checklists of all activities according to project quality plan.
- To verify and approve Method statements, subcontractor’s prequalification’s and material approval.
- To verify and manage all activities in site (Civil, Arch., MEP).
- To control the contractor quality of work through site meetings and documented by RFI, Site Instruction, SDR, and NCR.
- To review and approve as built drawings.
- To plan and manage all procedure of commissioning and handover mission.
- To verify, approve and follow up all material tests according to project standards and Specifications.
- To verify and approve 3
rd
parties, batch plants, factories, workshops and
laboratories according to Project Quality Plan and QMS. From Oct. 2013 to Oct. 2014 in Dongho Korean Saudi Limited Company. Riyadh, Saudi Arabia.
Work as Project Coordinator.
Owner: Ministry of Water and Electricity.
Consultant is TYPSA
Total Budget: 500 Million SR
The project is a strategic Stations of water tanks in Riyadh City Located in Alshifa and Salboukh Areas each one capacity above one Million m3. Each one includes Tanks, Main Building, Treatment Building, Electricity building, Fences and internal Roads. The Two Projects Turn Key Contract, Include all activities Civil, Arch., and MEP.
RESPONSIBILITIES:
- Coordinate project management activities, resources, equipment and information
- Break projects into doable actions and set timeframes
- Liaise with clients to identify and define requirements, scope and objectives
- Assign tasks to internal teams and assist with schedule management
- Make sure that clients’ needs are met as projects evolve
- Help prepare budgets
- Analyze risks and opportunities
- Oversee project procurement management
- Monitor project progress and handle any issues that arise
- Act as the point of contact and communicate project status to all participants
- Work with the Project Manager to eliminate blockers
- Use tools to monitor working hours, plans and expenditures
- Issue all appropriate legal paperwork (e.g. contracts and terms of agreement)
- Create and maintain comprehensive project documentation, plans and reports
- Ensure standards and requirements are met through conducting quality assurance tests
4/8
From Oct 2011, to Oct. 2013 in SMART Group Company. Nasr City, Cairo, Egypt.
Work as Project Manager for Projects in Real Estate and Industry. Such as;
- Nefert Bay Compound in Hurgada
Owner: DPC
Consultant: ECG
Total Budget: 500 Million EGP
This project has approximately 1000 Tourists unit in a high quality of finishing and landscape. This project is turnkey project.
- SPA in Smart Life Compound in New Cairo City
Owner: Smart
Consultant: Elshibl for Engineering
Total Budget: 70 Million EGP
This project includes swimming Pools, Main building and services Buildings.
- SODIC Compound, In 6 Oct. City.
Owner: SODIC
Consultant: ECG
Total Budget: 80 Million EGP
This project contents of 50 Villas in Different Types
- Lorenz Factory in Port Said
Owner: Lorenz (Germany Company)
Total Budget: 54 Million
This project includes main building and tanks turnkey project. RESPONSIBILITIES:
- Coordinate internal resources and third parties/vendors for the flawless execution of projects.
- Ensure that all projects are delivered on-time, within scope and within budget
- Developing project scopes and objectives, involving all relevant stakeholders and ensuring technical feasibility
- Ensure resource availability and allocation
- Develop a detailed project plan to track progress
- Use appropriate verification techniques to manage changes in project scope, schedule and costs
- Measure project performance using appropriate systems, tools and techniques
- Report and escalate to management as needed
- Manage the relationship with the client and all stakeholders
- Perform risk management to minimize project risks
- Establish and maintain relationships with third parties/vendors
- Create and maintain comprehensive project documentation
- When delays or problems Occur, as they always do, I’m ready to make the changes required to move the project past the issue. 5/8
From: June 2008, to Oct 2011 in P&G (Procter & Gamble) Company-Cairo Plant,6
th
Oct city, Cairo, Egypt.
Work as Construction Manager of Client.
I worked in P&G TSM team (Technical Support and Management) to review and manage the Plant Master Plan changing during any new project and to review structural design, coordination and workshop drawings for that projects assigned to me. Which mentioned as below:
1st Project [Shipping Docks Project]
We made modification in the shipping platform to make shipping process easier than before, because Shipping Platform become as a Saw tooth shape. We constructed all activities in a high quality and a suitable time, such as
(demolishing, excavation, Plain & Reinforced concrete, steel structure, breaks, cladding, painting, flooring, firefighting, Lighting, Doors, dock levelers, drainage system, ……ex)
2nd Project [Bar Soap Project]
We made a new Factory for Bar Soap from excavation and all civil, Arch., MEP works, till commissioning and start up for production. It contains Operation building, Utilities building and Warehouse at approximately 10,000 m2. With applying hygiene regulations.
Other Projects
Cafeteria project, Ware house Offices, Factory Fence and Land Scape Project. RESPONSIBILITIES:
- Prepare the tender evaluation report, Attend all senior management meetings.
- Collaborate with engineers, architects etc. to determine the specifications of the project
- Negotiate contracts with external vendors to reach profitable agreements
- Obtain permits and licenses from appropriate authorities
- Determine needed resources (manpower, equipment and materials) from start to finish with attention to budgetary limitations
- Plan all construction operations and schedule intermediate phases to ensure deadlines will be met and Prepare monthly progress reports for approval.
- Acquire equipment and material and monitor stocks to timely handle inadequacies
- Hire contractors and other staff and allocate responsibilities
- Supervise the work of laborers, mechanics etc. and give them guidance.
- Evaluate progress and prepare detailed reports to expedite all activities related to the project execution.
- Ensure adherence to all health and safety standards and report issues 6/8
From May 2007 to June 2008 in ARESCO ASEC Company, Egypt. Main Admin in Mahattit Elkahraba St, Tebbin, Cairo, Egypt. Work as QA Engineer for All Company.
I was the responsible person in renewal of our ISO: 9001 certificates in 01- 2008 With G.L company.
From: June2005 to May 2007 in ARESCO ASEC Company, Egypt. Work as Site QA/QC Manager.
5th Project [Incineration Unit for Petrochemical Waste] In Egyptian Petrochemical Company (EPC), Alex., Egypt. Consultant CALOREC (Germany Company)
We constructed all activities to get Incineration Unit for Petrochemical Waste as (excavation, soil Replacement, Plain & Reinforced concrete, steel structure, grating, painting…. ex), we installed all equipment in project as
(boiler, Incineration unit, scrubber unit, stack, pumps, chiller, waste tank, Piping, skids, drainage system…. ex) and we make hydro test for piping, commissioning phase and finally make start up.
6th Project [Rehabilitation of Ammonium Nitrate Plant] Elnasr Company for Fertilizer and Chemical Industry [SEMADCO] Attaka, Suze, Egypt.
Consultant Moharm Bakhoum
We constructed all activities to increase capacity in Ammonium Nitrate Plant as (excavation, Plain & Reinforced concrete, steel structure, grating, painting…. ex), we installed all equipment in project as (Kiln, Mill, scrubber unit, stack, pumps, chiller, ducts piping, skids, drainage system…. ex) and we make hydro test for piping, commissioning phase and finally make start up. My Position QA/QC Manager.
We are the main contractor
From: Dec. 2002 to June 2005 in ARESCO ASEC Company, Egypt. Work as QA/QC Engineer.
1St Project [Upgrade for Cement Product Line]
In Helwan Cement Company, Cairo, Egypt.
Consultant ASEC Company.
Third party FL-Shmit.
We installed all steel structure approximately 5000 ton all Equipment as (kiln, raw mill, crushers, cooler, conveyors, filters, bucket elevators, fans……ex in project.
2nd Project [Extension for Steel Structure Building] In Proctor & Gamble (P&G) Company, 6
th
Oct, Cairo, Egypt.
We constructed all civil works and installed all steel structure building with 7/8
all accessories to make extension in packing building. We tied in the new building with the old one during the process lines operation. 3rd Project [Liquefied Natural Gas (L.N.G) Project] Main Contractor: Bechtel Overseas Corp. IDKU, BEHARA, EGYPT. We installed all piping in Train 2 in different sizes and materials with all fitting, supports and valves…. ex.
We make the NDT, hydro test, reinstatement and punch list as Bechtel spec. and ASME 31.1 and ASME 31.3.
Familiar with Max-trax Database (Bechtel System) and Test Package Preparation. My Position QA/QC Engineer.
4th Project [Steel Structure Electrical Building]
In Cairo North Power Station, Cairo, Egypt.
Main contractor Hassan Alam Sons & CCC
Consultant PEGSCO.
We installed all steel structure in phase two 750 KW. RESPONSIBILITIES:
- Plan and conduct Quality Audit to ensure that current practices are in line with documented policies,
- Plan and conduct Quality Audit to ensure that procedures and systems to ensure effective implementation.
- Planning and scheduling the audit to ensure audits are completed as planned.
- Prepare and communicate to all concerned about Audit findings, audit conclusions and Audit Reports in Total to trigger improvement actions, follow up audits to ensure non
- Compliances reported are closed and are effective, Issue non-conformity report
(NCR) for any not applied in system and follow apply of the corrective action.
- Issue requests for the corrective action in any time to apply the system in the processes of the company.
- Presenting suggestions to improve the processes in the company departments to the representative and the top management.
- Collect the department objectives and follow the programs apply to achieve the objectives.
- Determine the processes effectiveness for the departments’ processes around the year,
- Collect the all data for the management meeting.
- Record the recommendations of the management meeting and make programs to apply these recommendations with the responsible in the department and follow these programs.
- Review all the procedures before issue to ensure it is applicable with the standard ISO9001:2000, Ensure that the document control system was applied in the company departments, Analysis all NCR Analysis and the processes effectiveness for the departments to know the weak points to develop the company process. 8/8
TRAINING COURSES:
- Advanced Contract Management Enppi
- Painting & Coating Technology Enppi
- CSWIP 3.1 TWI
- Quality Management System Lead Auditor Moody International
- Internal Auditor According to ISO 9001:2000 Moody International
- Six Sigma Improvement Program AUC
- Radiography testing (RT). Level II EWA
- Liquid Penetrant testing (PT). Level II EWA
- Magnetic Particles Testing (MT). Level II EWA
- Ultrasonic Testing (UT). Level II EWA
- ASME Inspection Training Course NDT Tech. Consultation
- OSHA General Industry (29 CFR 1910) (30-Hour). AUC
- OSHA Construction Safety & Health # 001063587 (10 Hr). AUC
- OSHA Disaster Site Worker WK# 0020024 (16-Hour). AUC
- HAZWOPER 40-Hour Training (NASP). AUC
- OSHA Disaster Site Worker No. DS0000418 AUC
PERSONAL INFORMATION:
Full Name: Mohamed Saeed Sedeek
Marital status: Married
Nationality: Egyptian
Date of Birth: 6/10/1980
Place of Birth: Giza
Military service: Exempted
Home Address: Hadaeek Alahram, El Haram, Giza, Egypt Home Phone: +20-111-*****-**
COMPUTER Skills:
Basic computer skills
Microsoft Windows (Win 98, till Win 10)
Microsoft Office (word, Excel, Power Point, Access and Outlook) M.S Project Program
Auto CAD 2D (2000, till 2015)
SAP2000 (Structure Analysis Program)
Web searching and browsing
LANGUAGE:
Arabic, English