ANISH ABRAHAM CHARAMPARAMPIL
Mobile: 009**-******** ~ Tel. (Res.): 24316081 ~ E-Mail: **********@*****.***
Address: Flat No. 12, Floor 4, Bldg. No. 2311, St. No. 12, Block No. - 4, Jleeb Al Shuyokh, Kuwait
Costing Engineer, seeking assignments in Cost Estimation & Cost Control with organization of repute in Oil & Gas industry.
Rich experience in Oil & Gas industry in Structural Steel such as Pipe Racks, Shelter/Buildings, PE Buildings, etc.
PROFILE SUMMARY
B.E. (Mechanical Engineering) with 19 years of experience in Cost Estimation and Material Planning
Proficient in measurement, estimation of quantity, rate analysis, costing & cost control in coordination with planning dept.
Adroit in preparing budget for on-going projects and forecasting the resources required to execute the project.
Adept in implementing strategic facilities management solutions to facilitate efficient transition & lower operating costs while maintaining quality service levels and providing accurate and timely reports to clients.
Deftness in swiftly ramping-up projects in close coordination with Consultants, Architects & Contractors and ensuring on time deliverables
Exposure of various projects in KOC, KNPC, MEW, MPW in the field of quantity surveying, cost estimation, cost control & material procurement for structural steel works
Skilled in estimation of steel quantities/ quantity surveying from tender/inquiry drawings, costing of work (materials, labour etc.) & cost control of on-going projects
Effective communicator with excellent interpersonal skills; strong leadership with ability to motivate & manage people
CORE COMPETENCIES
Tracking all the abnormal costs / wastage, preparing comparative statements, conducting tender interviews and recommending measures to avoid them
Making preliminary cost estimates for steel works in commercial as well as oil & gas projects
Monitoring various site activities / work proceeds and suggesting the Site Manager on remedies for mitigating the risks
Formulating and running cost reports reflecting the financial status of the projects for given geographic area
Planning material & developing vendors for obtaining timely procurement of materials & equipment at cost effective prices to ensure smooth execution of projects
Ensuring suitable deployment of manpower & timely availability of manpower
Ensuring submission for material approval for each project, coordinating between Engineering/Design Dept. for material procurement, storing, maintaining inventory/re-order and preparation of invoices for on-going projects
EMPLOYMENT DETAILS
3 years 9 months –25 July ‘15 – till date:
Mohammed Naser Al Baddah Gen Trading & Cont Co.(MBTC)., Shuaiba, Kuwait as Head of Estimation Department
Milestones:-
Managing all activities starting from inquiry to Proposal stage in the Estimation Dept.
Monitoring the cost analysis done by cost team for each type of work..
Preparation of Budget for awarded projects.
Coordination with clients and production team for smooth execution of projects.
Negotiations with clients for order finalization
Key Areas:-
Structural steel fabrication works for Oil & gas projects, such as pipe racks, shelters, platforms.
Design, supply & fabrication of pressure vessels, pig launchers, tanks for oil & gas sector.
Supply & fabrication of piping works for oil & gas sector.
Major Clients: L &T Hydrocarbons, Petrofac, NSH, FlourDaewooHHI (FDH JV), Limak, Cengiz, STFA, Tecnicas, Alghanim International, Seimens, … etc.
Major Projects Completed :
Structural steel fabrication of embedded steel – NSH- CFP- KNPC – KD 60,000/- ( year : 2015)
Structural steel fabrication of Pipe racks – L & T Hydrocarbons – GC 30, KOC– KD 1,800,000/- ( year : 2015-2016)
Design, supply & fabrication of Pressure Vessels –MECC- KOC- KD 120,000/- ( year : 2016)
Structural steel fabrication of platforms- NSH- CFP- KNPC- KD 160,000/- ( year : 2016)
Structural steel fabrication of buildings, steel- STFA- KOC– KD 100,000/- ( year : 2016)
Structural steel fabrication of Equipment platforms- Petrofac- CFP- KNPC – KD 650,000/- ( year : 2016-2017)
Structural steel fabrication of steel- New Airport - Limak – KD 300,000/- ( year : 2017)
Structural steel fabrication of steel- New terminal at Airport -Cengiz – KD 220,000/- ( year : 2017)
Structural steel fabrication of Pipe racks – Tecnicas – GT5-KNPC– KD 230,000/- ( year : 2018)
Structural steel fabrication of Transformer sheds – FDH JV-NRP-KNPC- KD 500,000/- ( year : 2018)
Design, supply & fabrication of Pig Launchers –MECC- KOC- KD 250,000/- ( year : 2018)
11 year 2 months -29 May’04 – 21 July’ 15:
Sayed Hamid Behbehani & Sons Co., Shuaiba, Kuwait as Cost Estimation Engineer
Milestones:-
Involved in checking the feasibility of the job and identifying & establishing the scope of work
Liaising with Design & Erection Depts. regarding the technical details
Raising inquiries to sub-contractors, material suppliers; preparation of estimate for design, fabrication & erection works
Leading a team aimed towards completing estimation & costing as per schedules; ensuring all costing & estimates are submitted to Manager- Engineering for review & comments.
Preparing the Budget for awarded projects and forecasting the manpower & equipments required for the execution.
Creating material submittals for client approvals for major projects in KOC, KNPC, MEW, etc.
Ensuring preparation of project invoices for billing & maintaining the cost of the project
Targeting cost control of material & labour in coordination with planning & procurement dept. and generating cost analysis reports on a regular basis
Carrying out cost analysis of projects after completion with feedbacks from respective depts. and submitting the report to Manager
Significant Accomplishments
Successfully completed various structural steel projects such as KOC- GC 24, GC 28, BS 140, BS 132, NTF, STF, KOC Fuel Gas Pipeline Project, KNPC- VRRP, Ethane Recovery Project, North Oil Pier Project, South Pier Gasport Project, LPG 4th Train Project, MEW – CCGT Sabiya PP, Az Zour PP, EQUATE- OL2K Ethylene Project
MPW – Lexus Showroom, Kuwait Trade Centre, EPA HQ
Major Clients: SKEC, Petrofac, Daelim, HHI, HDEC, Al Ahelia Switchgear, Alghanim International, Al Sayer, etc.
9 months -02Jun’03 – 28Feb’04:
Unifabs Engineering Co., Powai, Mumbai, India as Structural Engineer
Milestones:-
Functioned as Site Engineer for erection of steel structure in construction site
Effectively handled fabrication & erection of steel structures such as canopy, trusses, pyramids & chiller plant platforms on roof top for major construction companies such as Hiranandani Constructions Ltd., Raheja Constructions, etc.
Collaborated with clients for the erection work of structural steel
Closely monitored the erection work at construction site
Ensured arrangement of materials from the suppliers/store, machineries to site
Looked after preparation of bill of quantities, work-in-progress report, site expense report and progressive invoices as per site progress
2 year 7 months -02Nov’00 – 29May’03:
Doshi Engineering Works - Andheri, Mumbai, India as Fabrication Engineer
Milestones:-
Gained experience in manufacturing of reactors, heat exchangers, distillation columns, pipeline, storage tanks for reputed companies like Haldia Petrochemicals Ltd., Orchid Chemicals & Petrochemicals Ltd., etc.
Followed up enquiries from the customer, discussed their requirements, visited their premises and coordinated the requirements with design team
Served as a link between design team, sales team and clients
Performed quantity surveying of materials required and its cost calculation
Collated the details such as prices and mill certificates from the suppliers
Accountable for following up of bids/quotation submitted to the client
Ensured preparation of quality dossier for final submission for each projects
1 year-09Aug ‘99 – 08Aug’00:
Kerala Hitech Industries Ltd (KELTEC) - Trivandrum, India as Trainee Engineer
Milestones:-
Functioned as Trainee Engineer in Fabrication Dept. and gained experience in production of engine & rocket components such as fuel tank, combustion chamber for aerospace companies like ISRO, HAL, etc.
Major Projects Completed :
Packaged Substation M31, ISCO-KNPC MAA Refinery- Supply & Installation of Housing; Job Cost KD 300,000/- 2004 - 05
2 Packaged Substations M87, M88, HDEC -KNPC MAA Refinery- Supply & Installation of Housing; Job Cost KD 950,000/- 2005-06
Facility Upgrade for GCs- FMP, Petrofac, KOC - Supply of Structural Steel; Job Cost KD 550,000/- 2006 - 07
2 Packaged Substations M85, M86, HDEC -KNPC MAA Refinery- Supply & Installation of Housing; Job Cost KD 1.5 Million - 2006-07
Packaged Substation M78, Worley Parson-KOC- KNPC MAA Refinery- Supply & Installation of Housing; Job Cost KD 400,000/- 2007
Building New Gathering Center GC24, SKEC, KOC- Supply of Structural Steel & Cladding for Shelters; Cost KD 3 Million - 2008-09
LEXUS Facilities, Al Sayer– Supply & Erection of Structural Steel New Lexus Car Show Room; Job Cost KD 800,000/- 2008–09
3 Packaged Substations M2, SP11, SP12, Mouchel - KNPC MAA Refinery- Supply & Installation of Housing; Job Cost KD 1.8 Million - 2008-09
Sabiya CCGT Project, HHI, MEW- Supply of Structural Steel for Pipe Racks; Job Cost: KD 850,000/- 2010-11
Building New Booster Station BS 132, SKEC, KOC- Supply of Structural Steel & Cladding for Shelters; Job Cost KD 2.5 Million - 2011-13
LPG 4th Train Project, DAELIM, KNPC- Supply of Structural Steel for Pipe Racks; Job Cost KD 650,000/- 2011–12
Packaged Substation RM34, Petrofac-KOC- KNPC MAA Refinery- Supply & Installation of Housing; Cost KD 1,000,000/- 2011
Packaged substation RM35, HDEC-KOC- KNPC MAA Refinery- Supply & Installation of Housing; Cost KD 1,200,000/- 2012
Az Zour RO Desalination Project, Alghanim International, MEW- Supply & Erection of Structural Steel; Job Cost KD 1.5 Million - 2012–13
PAAET- Shuwaikh Campus, Recafco - Alico– Supply & Erection of Structural Steel; Job Cost KD 365,000/- 2013
KOC Hospital, SHBC– Supply & Erection of Structural Steel New Ahmadi Hospital; Job Cost KD 310,000/- 2013
Elevated Substations, SKEC, KOC- Supply of Structural Steel & Cladding for Shelters; Job Cost KD 539,000 - 2013-14
Packaged Substation RM27A, Samsung-TGTU, KNPC- Supply & Installation of Housing; Cost KD 490,000/- 2014
ACADEMIC DETAILS
B.E. (Mechanical Engineering) from P.S.N.A. College of Engg. & Tech - Dindigul, India, Madurai Kamaraj University with 65%
PDC from St. Thomas College, Kozhencherry, India, Mahatma Gandhi University in 1999 with 73%
SSLC from St. Thomas High School, Kozhencherry, India, State Board of Examination in 1993 with 85%
IT Skills: Well versed with AutoCAD, MS Excel, MS Word, etc.
PERSONAL DETAILS
Date of Birth: 7th February, 1978
Nationality: Indian
Marital Status: Married
Passport No.: M 4637605, Validity : 09/01/2025
Kuwait Driving License: 278*********
Languages Known: English, Hindi, Malayalam and Tamil
Visa Status: Transferable Visa, Article 18
DECLARATION
I hereby declare that all information given above are true to the best of my knowledge & belief.
Date : 18th May 2019
( Anish Abraham Charamparampil )