Post Job Free

Resume

Sign in

Manager Engineer

Location:
Jeddah, Makkah Region, Saudi Arabia
Salary:
11000
Posted:
October 22, 2019

Contact this candidate

Resume:

Alfanar Site Office,

HHR* S/S Al Bashaer,

Jeddah Saudi Arabia

Cell #

+966-**-*******

+92-332-*******

E-mail: adam9u@r.postjobfree.com

Muhammad Waqar Khan

Career Objective To become a part of a dynamic group where I could further explore the skills and capabilities which I gained in the whole academic career and to serve in a challenging work environment.

Personal Father’s Name: Muhammad Sharif Khan

Date of Birth: April 17th,1985

NIC #: 17301-2008979-9

Passport No: HY4119793

Nationality: Pakistan

Religious Belief: Islam

Work experience Total Experience: 11 years [including 10 years in practical field and 1 year in teaching]

Working with Alfanar Construction Company Saudi Arabia as Site Electrical Engineer on 132/13.8KV Substation, along with 15Km 132 KV Transmission line & 5km underground cable in Bakeria Al Qassim since Aug, 2018 to present. (Project Cost = 164M SAR)

1. To follow the schedule of Project activities and verify the progress on daily basis. 2. To take corrective action of any deviation occurred from time to time. 3. Coordinate with site manager to meet the site requirement for materials, equipment and manpower according to the plan and follow up the provision of the same with the Project Management and other departments.

4. Analyze all the problems affecting the progress and solve them together with the site manager.

5. Prepare the monthly invoices for the works executed and material delivered within the specified time and as per the terms and conditions of the contract. 6. Check the subcontractor’s monthly invoices according to the contractual conditions prior to approval by the Project Manager.

7. Initiate the fortnight report and present to site manager including the following; 7.1 The progress achieved in the activity compared to the progress indicating any deviation from the planned progress and makes a plan to avoid such deviation in forthcoming period.

7.2 Compare the quantities of the works required as per the drawing approved by the consultant with the estimated quantities.

8. Coordination with the consultants, site manager and sub contractors to achieve the required technical and administrative integration. 9. Carry out the execution work in such a manner which will support the smooth of work of the other interfacing contractors/disciplines (Civil, Electrical & Mechanical) 10. Supervise and endorse authenticate the work of supervisors especially in the layout of project establishment of bench marks and maintenance of required levels. 11. Observe the progress in the field and check the conformity to the executed works to the required specification, the instructions of consultant and the approved progress plan.

12. Arrange weekly meetings to review progress on material, manpower and other related matters with the Formen to understand the problems affecting the work progress and discuss all possible remedial measures. 13. Provide timely reports to the Site Manager on any urgent needs about the work progress at site including his recommendations.

14. Inform any addition works included in the design but not mentioned in the contract to Site Manager and seek client’s approval.

15. Ensure along with the site QA/QC Engineer that the delivered materials prior to placing them in the stores are in accordance with specification and purchase orders and report to site manager for any deviation observed. 16. Ensure that all safety requirements are implemented according to safety procedure or as advised from time to time by site safety officers. 17. Carry out any works required by the Project Management within the scope of work. 18. Adhere to the quality concern issue raised by the QA/QC Engineer, so that the work is executed as per the required quality standard and specification. 19. Distribution of work to site staff for keeping them engaged and to accomplish the required Project progress.

20. Ensure that activity related approved drawings, applicable manuals, check list, procedures, work instruction are available at site prior to start of activity. 21. Monitoring of all site activities i-e Installation of cable trays, conduits for wiring, Laying & termination of control, power & optical fibre cables, Installation of AC/DC, Control & Protection & LCC Panels, Battery banks & battery chargers, Installation of 380KV, 132KV & 13.8KV Power Transformers, Installation of 380KV & 132KV GIS, HVAC system & fire alarm system etc

22. Carry out all site activities as per approved drawings & method statements i-e Assembly & errection of different types of towers & gantries, Tightening & torquig of towers & gantries, Assembly of insulators & its hoisting, Earthing of towers, Stringing & sagging of AAAC conductor & OPGW as per drum schedule & sagging charts, Arranging for splicing & testing of OPGW etc

Worked with Alfanar Construction Company Saudi Arabia as Site Electrical Engineer on 380/115/13.8KV Substation in DAMMAM since March, 2018 to present. (Project Cost = 469M SAR)

1. To follow the schedule of Project activities and verify the progress on daily basis. 2. To take corrective action of any deviation occurred from time to time. 3. Coordinate with site manager to meet the site requirement for materials, equipment and manpower according to the plan and follow up the provision of the same with the Project Management and other departments.

4. Analyze all the problems affecting the progress and solve them together with the site manager.

5. Prepare the monthly invoices for the works executed and material delivered within the specified time and as per the terms and conditions of the contract. 6. Check the subcontractor’s monthly invoices according to the contractual conditions prior to approval by the Project Manager.

7. Initiate the fortnight report and present to site manager including the following; a. The progress achieved in the activity compared to the progress indicating any deviation from the planned progress and makes a plan to avoid such deviation in forthcoming period.

b. Compare the quantities of the works required as per the drawing approved by the consultant with the estimated quantities.

8. Coordination with the consultants, site manager and sub contractors to achieve the required technical and administrative integration. 9. Carry out the execution work in such a manner which will support the smooth of work of the other interfacing contractors/disciplines (Civil, Electrical & Mechanical) 10. Supervise and endorse authenticate the work of supervisors especially in the layout of project establishment of bench marks and maintenance of required levels. 11. Observe the progress in the field and check the conformity to the executed works to the required specification, the instructions of consultant and the approved progress plan.

12. Arrange weekly meetings to review progress on material, manpower and other related matters with the Formen to understand the problems affecting the work progress and discuss all possible remedial measures. 13. Provide timely reports to the Site Manager on any urgent needs about the work progress at site including his recommendations.

14. Inform any addition works included in the design but not mentioned in the contract to Site Manager and seek client’s approval.

15. Ensure along with the site QA/QC Engineer that the delivered materials prior to placing them in the stores are in accordance with specification and purchase orders and report to site manager for any deviation observed. 16. Ensure that all safety requirements are implemented according to safety procedure or as advised from time to time by site safety officers. 17. Carry out any works required by the Project Management within the scope of work. 18. Adhere to the quality concern issue raised by the QA/QC Engineer, so that the work is executed as per the required quality standard and specification. 19. Distribution of work to site staff for keeping them engaged and to accomplish the required Project progress.

20. Ensure that activity related approved drawings, applicable manuals, check list, procedures, work instruction are available at site prior to start of activity. 21. Monitoring of all site activities i-e Installation of cable trays, conduits for wiring, Laying & termination of control, power & optical fibre cables, Installation of AC/DC, Control & Protection & LCC Panels, Battery banks & battery chargers, Installation of 380KV, 132KV & 13.8KV Power Transformers, Installation of 380KV & 132KV GIS, HVAC system & fire alarm system etc

Worked with Alfanar Construction Company Saudi Arabia as Site Electrical Engineer on 132KV Substation in Buraidah Al Qassim since August, 2016 to March, 2018.

(Project Cost = 93M SAR)

Job Responsibilities:

1. To follow the schedule of Project activities and verify the progress on daily basis. 2. To take corrective action of any deviation occurred from time to time. 3. Coordinate with site manager to meet the site requirement for materials, equipment and manpower according to the plan and follow up the provision of the same with the Project Management and other departments.

4. Analyze all the problems affecting the progress and solve them together with the site manager.

5. Prepare the monthly invoices for the works executed and material delivered within the specified time and as per the terms and conditions of the contract. 6. Check the subcontractor’s monthly invoices according to the contractual conditions prior to approval by the Project Manager.

7. Initiate the fortnight report and present to site manager including the following; a. The progress achieved in the activity compared to the progress indicating any deviation from the planned progress and makes a plan to avoid such deviation in forthcoming period.

b. Compare the quantities of the works required as per the drawing approved by the consultant with the estimated quantities.

8. Coordination with the consultants, site manager and sub contractors to achieve the required technical and administrative integration. 9. Carry out the execution work in such a manner which will support the smooth of work of the other interfacing contractors/disciplines (Civil, Electrical & Mechanical) 10. Supervise and endorse authenticate the work of supervisors especially in the layout of project establishment of bench marks and maintenance of required levels. 11. Observe the progress in the field and check the conformity to the executed works to the required specification, the instructions of consultant and the approved progress plan.

12. Arrange weekly meetings to review progress on material, manpower and other related matters with the Formen to understand the problems affecting the work progress and discuss all possible remedial measures. 13. Provide timely reports to the Site Manager on any urgent needs about the work progress at site including his recommendations.

14. Inform any addition works included in the design but not mentioned in the contract to Site Manager and seek client’s approval.

15. Ensure along with the site QA/QC Engineer that the delivered materials prior to placing them in the stores are in accordance with specification and purchase orders and report to site manager for any deviation observed. 16. Ensure that all safety requirements are implemented according to safety procedure or as advised from time to time by site safety officers. 17. Carry out any works required by the Project Management within the scope of work. 18. Adhere to the quality concern issue raised by the QA/QC Engineer, so that the work is executed as per the required quality standard and specification. 19. Distribution of work to site staff for keeping them engaged and to accomplish the required Project progress.

20. Ensure that activity related approved drawings, applicable manuals, check list, procedures, work instruction are available at site prior to start of activity. 23. Monitoring of all site activities i-e Installation of cable trays, conduits for wiring & lighting, Laying & termination of control, power & optical fibre cables, Installation of AC/DC, Control & Protection & LCC Panels, Battery banks & battery chargers, Installation of 132KV & 13.8KV Power Transformers, Installation of 132KV GIS, HVAC & fire alarm system etc

Worked with Alfanar Construction Company as Site Electrical Engineer on 148km 380KV Transmission line from Rabigh to Al Adel Saudi Arabia from September, 2015 to August, 2016. (Project Cost = 389M SAR)

Job Responsibilities:

1. To follow the schedule of Project activities and verify the progress on daily basis. 2. To take corrective action of any deviation occurred from time to time. 3. Coordinate with site manager to meet the site requirement for materials, equipment and manpower according to the plan and follow up the provision of the same with the Project Management and other departments.

4. Analyze all the problems affecting the progress and solve them together with the site manager.

5. Prepare the monthly invoices for the works executed and material delivered within the specified time and as per the terms and conditions of the contract. 6. Check the subcontractor’s monthly invoices according to the contractual conditions prior to approval by the Project Manager.

7. Initiate the fortnight report and present to site manager including the following; a. The progress achieved in the activity compared to the progress indicating any deviation from the planned progress and makes a plan to avoid such deviation in forthcoming period.

b. Compare the quantities of the works required as per the drawing approved by the consultant with the estimated quantities.

8. Coordination with the consultants, site manager and sub contractors to achieve the required technical and administrative integration. 9. Carry out the execution work in such a manner which will support the smooth of work of the other interfacing contractors/disciplines (Civil, Electrical & Mechanical) 10. Supervise and endorse authenticate the work of supervisors especially in the layout of project establishment of bench marks and maintenance of required levels. 11. Observe the progress in the field and check the conformity to the executed works to the required specification, the instructions of consultant and the approved progress plan.

12. Arrange weekly meetings to review progress on material, manpower and other related matters with the Formen to understand the problems affecting the work progress and discuss all possible remedial measures. 13. Provide timely reports to the Site Manager on any urgent needs about the work progress at site including his recommendations.

14. Inform any addition works included in the design but not mentioned in the contract to Site Manager and seek client’s approval.

15. Ensure along with the site QA/QC Engineer that the delivered materials prior to placing them in the stores are in accordance with specification and purchase orders and report to site manager for any deviation observed. 16. Ensure that all safety requirements are implemented according to safety procedure or as advised from time to time by site safety officers. 17. Carry out any works required by the Project Management within the scope of work. 18. Adhere to the quality concern issue raised by the QA/QC Engineer, so that the work is executed as per the required quality standard and specification. 19. Distribution of work to site staff for keeping them engaged and to accomplish the required Project progress.

20. Ensure that activity related approved drawings, applicable manuals, check list, procedures, work instruction are available at site prior to start of activity. 21. Carry out all site activities as per approved drawings & method statements i-e Assembly & errection of different types of towers & gantries, Tightening & torquig of towers & gantries, Assembly of insulators & its hoisting, Earthing of towers, Stringing & sagging of AAAC conductor & OPGW as per drum schedule & sagging charts, Arranging for splicing & testing of OPGW etc

Worked with FRENCO FORT ENGINEERING & CONSTRUCTION COMPANY Kabul Afghanistan as Quality Assurance Engineer on building projects from November, 2014 to July, 2015.

Responsibilities

Preparing Submittals for electrical materials which are to be used at site for clients according to the requirements specified in Technical Specification.

Provides Engineering management with program status updates on a regular basis

Supervises the field electrical systems and facilities of project, including its organization, planning and scheduling in order to complete the work on time, within budget and to the quality specified.

Ensure successful execution and supervision of on-site activities accordance with approved plans, drawings and specification.

Tracking construction deficiencies and ensuring timely corrective action.

Following the design during construction and making the decisions for change in design as per site.

Preparing Bill of quantity for all electrical materials to be used at site.

Monitoring and supervising for the quality control at site.

Attending weekly coordination meeting with Clients i.e. USACE and providing meeting minutes to Head office.

Worked with Associates in Development (Pvt) Ltd on Monitoring and Evaluation Services in South Waziristan as Field Monitor from Feb, 2010 to Oct, 2014.

Project includes;

Rehabilitation of 11KV & 33KV feeders from 66KV Jandola Grid Station in Mehsud area in South Waziristan Agency (Project Costs 1022 Million PKR)

Construction of 132KV Grid station at Wana South Waziristan Agency (Project Costs 445 Million PKR)

Construction of 132KV Double Circuit Transmission line from Gomal Zam Dam to Wana (Project Costs 695 Million PKR)

Job Responsibilities:

Regular monitoring visits in accordance with the agreed QA plan.

Ensure generation of bi-weekly & monthly reports.

Assistance to Field Manager M & E with various M & E tasks.

Coordination with stakeholder’s i-e FWO, WAPDA & NESPAK.

Monitoring of excavation of HT/LT pole foundations, Erection of HT/LT poles, monitoring the stringing of HT/LT conductor & Installation of 11KV & 33KV transformers.

Monitoring of excavation of 132KV ZM-1, ZM-30 & ZM-60 towers foundations, checking of earth resistance of towers, Monitoring of erection of superstructure and stringing of conductor.

Monitoring of civil works, inspection, placement and power cabling of 132KV Power transformer, Lightening arrestors, Circuit breakers, Bus disconnectors, Line disconnectors, Potential transformers, Current transformers, Surge arrestor

& Control house building.

Ensure collection of identified material samples for further testing/processing.

Conduct simple field test and prepare test reports for review by the M & E Field Manager and TL.

Ensure regular technical and field assessment reports which will provide the basis for various M & E actions.

Material inspection of Conductors (LYNX, DOG, ANT, Aluminum conductor 600mm2), Earth wire 9mm, GSL wire 10mm, Control cables, XLPE, HT/LT poles, 132KV towers, Pin & Disc insulators, Nuts Bolts all types at manufacturer premises before dispatch to site.

Worked for One year as

Internee

Works & Services Department under Prime Minister National Internship Program Scheme since Feb, 2010 to Jan 2011.

Worked for three months as

Lecturer

Govt College of Technology, Peshawar since Oct, 2009 to Dec, 2009. Courses taught:

Electronics Drawing

Electronic Measuring Instruments

Motors and Generators

Worked for 2 Months as

O & M Engineer

Mobiserve Pakistan (Pvt) Ltd since June, 2009 to July, 2009. Job Responsibilities:

Troubleshooting of different microwave links (NEC, Minilink and Ericson)

Handled different rectifiers (Eltec, Delta and Emerson)

Handled different BSS and transmission alarms

Corrective maintenance of the site

Preventive maintenance of the site

Worked for 9 months as

Lecturer

Khyber Institute of Technology Peshawar since Sept, 2008 to May, 2009. Education Master of Business Administration, MBA (Executive) in progress CGPA 3.68.

Bachelor’s of Engineering (Electrical) from NWFP University of Engineering & Technology – Peshawar, in 2008 (First Division /Grade B

/Aggregate Marks 62.33 %)

Higher Secondary School Certificate (Pre-Engineering) from Board of Intermediate & Secondary Education, Peshawar in 2003 (First Division / Grade A / Marks 76.91%)

Secondary School Certificate (Science) from Board of Intermediate & Secondary Education, Peshawar in 2001 (First Division / Grade A / Marks 79.65 %)

Final Year Project Implementation of long range remote controller using AT89C2051 microcontroller with EEPROM.

Professional

Courses

Short Courses/

Seminars/

Workshops

Completed four months course on “Telecom & Mobile Repairing” from Govt Advance Technical Training center arranged by NAVTEC PAKISTAN from Dec 15, 2009 to April 15, 2010.

Completed three months course on “Optical Fiber Cable Jointing, Splicing

& Transmission System” arranged by NAVTEC PAKISTAN from May 2008- Aug, 2008.

Attended a one day short course on 07 Basic Tools for Quality Arranged by Alfanar Construction Company in Badaya on September 27, 2017.

Attended a one day short course on QMS Awareness Arranged by Alfanar Construction Company in Buraidah on September 21, 2017.

Attended a one day short course on Working at Height Arranged by Alfanar Construction Company in Jeddah in September, 2015.

Attended a one day short course on Basic Electrical Safety Arranged by Alfanar Construction Company in Jeddah in September, 2015.

Attended a one day seminar on GIS in Municipal Asset Management and Urban Transport System arranged by Punjab Urban Unit on November 19, 2014.

Attended a one day Seminar on Tubewell Energy Audit arranged by National Energy Conservation Center (ENERCON) at University of Management & Technology Lahore (UMT) on September 27, 2014.

Attended a one day Seminar on Improving Boiler Operating Efficiency arranged by National Energy Conservation Center (ENERCON) at University of Management & Technology Lahore (UMT) on September 26, 2014.

Attended a one day Seminar on Energy Efficiency in Electrical System arranged by National Energy Conservation Center (ENERCON) at University of Management & Technology Lahore (UMT) on September 25, 2014.

Attended a one day Energy Conservation Training Seminar organized by National Energy Conservation Centre (ENERCON) on Jan 06, 2011.

Attended two days short course on “EMERGING NETWORK WIRELESS TECHNOLOGIES” held on January 14-15, 2009 at Headquarters PEC, Islamabad.

Attended two days short course on “ENGINEERING PROJECT MANAGEMENT” held on Oct 22-23, 2008 at Headquarters PEC, Islamabad.

Professional

Profile

Highly organized and dedicated with positive attitude.

Able to handle multiple assignments.

Have excellent written, oral and interpersonal communication skills.

Able to work on a challenging post.

Willing to work at field locations anywhere in the country. Computer

Literacy

MS-Office

MS Windows

Pspice

PROCOM

PNMT

Electronic Work Bench (EWB)

MS Project

Primavera

Membership Registered Engineer with Pakistan Engineering Council (ELECT-24137). Registered Engineer with Saudi Council of Engineers (292417) Extra Curricular

Activities

Remained Member of Cricket team in Islamia Collegiate School (1999- 2001).

References References will be provided upon request.



Contact this candidate