Post Job Free
Sign in

As a construction engineer/ manager ( Oil and Gas, Mechanical)

Location:
Kuwait City, Kuwait
Salary:
1700KD to 1800 KD
Posted:
October 15, 2019

Contact this candidate

Resume:

PINKU SARKAR

CONSTRUCTION MANAGER/ENGINEER (PIPELINE / PIPING)

E-MAIL: *************@*****.***

Phone: +965********, Kuwait Profile:

A competent Construction Engineer with excellent communication, organization and co-ordination skills with over 16 years in valuable experience of successfully overseeing and completing projects from conception to completion.

Area of expertise comprises the following:

Project and Management

Supervision

Erection & Commissioning

Contract / Material Managements.

Maintenance / Fabrication.

Training / Development.

Planning and Development

Construction Projects

Well conversant with project / construction HSE procedures

Objective:

To obtain a demanding position in a well-established company, wherein, I can utilize my skills thereby contributing to company’s growth. Immensely talented Construction Engineer with huge experience in executing EPC oil and gas sectors construction projects efficiently.

Core Competencies:

In depth technical knowledge regarding construction work.

Familiar with various international standards viz. ASME, ASTM, ANSI B31.3,31.4,API – 650, API 653, API 1104 and KOC Mechanical and piping standards.

Key competencies in coordination with client / consultant, documentation, managing materials, & manpower resources to register maximum productive output.

Excellent management skills and remarkable ability to contribute towards team performance.

Ability to work in a fast paced and challenging environment.

Excellent communication & leadership skills.

Resourceful team player and keen attention to detail.

Fluent in English, responsible, hardworking, solid interpersonal skills.

Education

Degree in Mechanical Engineering, Dibrugarh University, Assam, India

Other Qualification

KOC approval.

JO approval.

MS Word and Excel Advanced.

Hot Tapping Training Course.

Confined space & Fire watch Training course.

JSA & Work permit Training course.

Kuwait Engineering Society membership.

Defensive Driving Training course.

Languages Known:

English, Hindi, Bengali and Assamese

Arabic – basic working level communication

Personal Information:

Marital Status: Married

Address for communication: Flat No. 10, Building No. 77,

Street No. 16, Abu halifa-2

Passport No.: J3508562 valid up to 16/08/2020

Kuwait Driving License No: 278********* valid up to 11/04/21

PROFESSIONAL EXPERIENCE DETAILS:

A)Currently working as Project Co-coordinator for ARABIENERTECH KSC, Kuwait.

Project: UPGRADATION OF GAS AND CONDENSATE NETWORK AT EAST KUWAIT, AREA-1

Client: Kuwait Oil Company (KOC)

Oct 2019 – PRESENT

Coordinate and directly involved the Mobilization of site office location, equipment’s, facilities and manpower in order to smooth run the construction activity.

Review and monitoring pipeline and manifold area topographical survey work.

Provide sufficient support to engineering consultant team.

Review Pipeline long lead item datasheet and specification.

Review plot plan &equipment layout for Pig L/R as per contract drawing.

Finalizing project long lead item as per scope of work.

Finalizing critical Tie-In List as per project scope of work.

Scheduling welder’s qualification work as per project requirements.

Identifying and scheduling pipeline De-watering work.

Planning/ scheduling& monitoring of construction activity of Pipeline line project.

Clearing TB evaluation for Project long lead item.

Reviewing and monitoring Project long lead items procurement status.

Preparation of work procedure for different size crude pipe (ASME 31.4/31.8) line stringing, hauling, welding, excavation, lower-in and backfilling.

Directly involved Preconstruction activity like ROW construction, clearing site obstruction along with KOC representatives.

Preparation and review of critical pipeline activity like HDD and Micro tunneling works for different type road crossing, tie-in excavation works, 5D bends / 10 D Bends lowering, Field Tie-in joints fit-up and welding works.

Scheduling and identifying project NDT works as per requirements.

Scheduling and identifying Project blasting / painting work including Field Tie-in HBP coating.

Scheduling manifold area construction works.

B)Worked as Construction engineer\Lead Engineer for ARABIENERTECH KSC, Kuwait.

Project: SUPPLY AND INSTALLATION OF VSM PUMPS AT GC-06 &GC-20 AND NEW 20” PIPELINE FROM GC-09 TO CMM

Client: Kuwait Oil Company (KOC)

OCT 2016 – OCT 2019

Coordinate and directly involved the Mobilization of site office location, equipment’s, facilities and manpower in order to smooth run the construction activity.

Review and monitoring pipeline and pump house topographical survey work.

Provide sufficient support to engineering consultant team.

Review Pipeline and VSM pumps long lead item datasheet and specification.

Review plot plan &equipment layout for Pig L/R, sub-station and Pump House area as per contract drawing.

Finalizing project long lead item as per scope of work.

Finalizing critical Tie-In List as per project scope of work.

Finalizing Pump house and Sub-station location as per contract scope of work.

Scheduling welder’s qualification work as per project requirements.

Identifying and scheduling pipeline De-watering work.

Planning/ scheduling& monitoring of construction activity of Pipeline line project.

Clearing TB evaluation for Project long lead item.

Reviewing and monitoring Project long lead items procurement status.

Preparation of work procedure for 20” size crude pipe (ASME 31.4/31.3) line stringing, hauling, welding, excavation, lower-in and backfilling.

Directly involved Preconstruction activity like ROW construction, clearing site obstruction along with KOC representatives.

Preparation and review of critical pipeline activity like HDD and Micro tunneling works for different type road crossing, tie-in excavation works, 5D bends lowering, Field Tie-in joints fit-up and welding works.

Scheduling and identifying project NDT works as per requirements.

Scheduling and identifying Project blasting / painting work including Field Tie-in HBP coating.

Experienced in Valve pit construction and valve pit piping works for different sizes pipe line.

C)Worked as Construction engineer\Lead Engineer for ARABIENERTECH KSC, Kuwait.

Project: Re-routing of high pressure flow lines and associated works for Jurassic wells at north Kuwait areas.

Client: Kuwait Oil Company (KOC)

FEB 2013 – OCT 2016

Coordinate and directly involved the Mobilization of site office location, equipment’s, facilities and manpower in order to smooth run the construction activity.

Planning/ scheduling& monitoring of construction activity of Flow line project.

Directly involved and coordinate Site survey activity like slit trenching, test pit excavation, electronic survey works and Tie –in location identification prior to engineering.

Preparation of work procedure for 42” size gas pipe ( ASME 31.8) line,36” size sea water line (ASME31.4), 20” size gas oil line (ASME 31.4),16” size HFO line ( ASME31.4) and 16” size crude oil lines ( ASME 31.4) stringing, hauling, welding, excavation,lowering and backfilling.

Directly involved Preconstruction activity like ROW construction, clearing site obstruction along with KOC representatives.

Directly supervision the site activity like different sizes pipes stringing, ( 16”- HFO and crude oil, 20”- Gas oil 36 – Sea water, and 42- Gas”) welding,trenching, lower in, swamp weight installation and backfilling.

Preparation and review of critical pipeline activity like HDD and Micro tunneling works for different type road crossing, tie-in excavation works,5D bends lowering, local Tie-in joints fit-up and welding works.

Coordinate site NDT works in between construction crew and NDT crew.

Procedure preparation work for Tie –in activity.

Experienced in Valve pit construction and valve pit piping works for different sizes pipe line.

D)Worked as Construction engineer for ABB SPA &ARABIENERTECH KSC, Kuwait.

Project: 30”Crude Transit Pipe Line (TL-4)

Client: Kuwait Oil Company (KOC)

NOV 2011 - FEB 2013

Responsibilities Included:

Prepared cost breakouts and budget reports for approval process.

Set construction logs daily.

Synchronized filed activities and supervised a team up to 30 qualified welders, fabricator, fitter, rigger, scaffolder, general labor and excavation team.

Preparation and review of stationary equipment erection procedure as per KOC standard.

Preparation and review of manual and mechanical excavation procedure as per KOC standard.

Preparation and review of critical piping erection procedure for U/G and A/G as per KOC standard.

Preparation and review of metering skid shelter erection procedure for CMM and NTF area.

Planning/scheduling and supervising the 30”size flow pipe line and associated unit piping’s fabrication, erection work. Piping materials conforms to API 5L GR B, except IA line.

Planning / scheduling and supervising the HOT tapping work on GCs crude transporting line (different sizes like 24”, 30” 48” etc.)

Planning, estimation and execution of civil related activity in the construction field like witness test of soil compaction, moisture content, aggregation, concrete slumps, line and grade survey,concrete coring, steel structure supports foundation grouting work, rotating and stationary equipment’s foundation grouting work by using non shrink grout materials and U/G pipe line surveillance work to ensure tightness and bedding.

Execution of stationary equipment erection like Residue collection Tank (30 ton), Pig Launcher, Purge Water Tank, Jib Crane, Flow Metering Skid ( 27 ton), overhead Crane( 8 ton) etc. inside KOC oil field.

Direct monitoring the execution works of Metering skid grouting, residue tank grouting, compressor base grouting, supports column grouting and steel structure shelter (8 meters height x 20 meters long) erection work.

Direct monitoring the execution work of 30” process flow pipeline hydro test, fire water pipeline hydro test, etc. at site as well as at yard.

Experienced in Civil job, start from survey line marking to backfilling for all sizes of pipes.

Coordinated with the inspectors on site for keeping process ongoing.

Preparing as-built drawing.

E)Project Manager

ARABIENERTECH KSC, Kuwait

Project: Pipe Line Instruction Work on well head, SR-10

Client: Kuwait Oil Company (KOC)

OCT 2011 – NOV 2011

Responsibilities Included:

Preparation and review of work procedure as per KOC standard.

Planning / scheduling and monitoring of maintenance work activity.

Execution and monitoring of Flares stack installation and supporting.

Steam injection pipe line, oil separator pipe line, knockout drum drain pipe line, flare pipe line, level switch, level gauge, pressure gauge etc. installation and monitoring work at SR-10.

Execution hydro test work for 3”size steam injection pipe line at 160 psi pressure.

F)Mechanical Engineer

ARABIENERTECH KSC, Kuwait

Project: PMP Water Disposal Facility

Client: Joint Operation (JO)

ARABIENERTECH KSC, Kuwait

Project: SUG Upgrade Facilities

Client: Joint Operation (JO)

SEP 2006 – AUG 2011

Responsibilities included:

Preparation & review of work procedure.

Planning / Scheduling & monitoring of construction & maintenance work activity.

Managed the project close out and hand over of completed project to Bureau staff and provided follow-up actions as required during the warranty period.

Synchronized filed activities and supervised a team up to 25 qualified welders and different category fabricator, fitter and rigger, scaffolder, general labor and 100 excavation labors.

Monitor & directly involved the mechanical maintenance work, like oil storage Tank degassing/Desludging, Existing Tank modification, piping maintenance work etc.

Preparation & Execution for work procedure of Degassing / Desludging of Fixed Roof Tank.

Monitor & directly involved the mechanical construction work,like equipment erection( pumps, air compressor, knockout drum, Tank erection), unit pipe erection & fabrication etc., as per approved method statement, sequence of job, ASME 31.3/API, and as per WPS, PQR and client specification. All piping materials conform to API 5L GR B except foam header line (SS) and fresh water line (SS).

Directly involved civil related activity like bund wall construction, tank foundation construction, pump skid grouting, road construction, drain channel construction etc.

Supervise Sub-Contractor work and reviewing payment document.

Review of erection scheme for critical Piping system.

Preparing holyday, pinhole test for various U/G & A/G Pipe.

Co-ordination in between client and execution crew.

Generate procedure & execution of TIE-IN, Hot Tapping (stub-in) & Mechanical maintenance work.

Conduct line checking as per project standard requirement reference to isometric and P&ID.

Updating the daily progress report and reviewed the weekly progress with client.

Generate punch list of completed installed piping &equipment’s prior to start hydro test, pneumatic test & other activity.

Participate and witness the hydro test and pneumatic of U/G & A/G line.

Precommissioning activity including BOX-UP, FLUSHING, DRYING, AIR BLOWING & clearing of category wise punch list prior to start pre commissioning and commissioning activity.

Co-ordinate and operate the commissioning of 30000bbl capacity hydrocarbon tank and 8 no’s centrifugal pump

Ensure the implementation of quality approved procedure.

Preparing as-built drawing.

G)Senior Engineer (Mechanical)

Company: PunjLloyd Ltd, INDIA

Indore Kota Pipeline, Rajasthan, India (16” Size Dia, 180 KM Long Flow Pipeline)

Project Phase: Construction of Two IP Station, Rajasthan, India.

Client: EIL

JUN 2006 – SEP 2006

Responsibilities Included:

Preparation & review of work procedure

Planning / scheduling of maintenance activities of pig station.

Monitor & directly involved the mechanical construction work, like Pipe fabrication, pipe lowering, piping system for two intermediate pigging (IP) station for 180 KM long Indore Kota Pipelines.

I was involved erection of Pig receiver, pig launcher& basket filter.

Mechanical Clearance, hydrostatic test and in Pre commissioning activities.

Review of erection scheme for critical Pipe Line.

H)Senior Engineer (MECHANICAL)

DABHOL POWER PLANT PROJECT, CHIPLUN, INDIA

Company: Punj Lloyd Ltd, INDIA

Project: Health study of LNG Terminal & EPC contract of LNG Terminal in RGPPL

Client: Engineering India Limited (EIL)

DEC 2005 – JUN 2006

Responsibilities included:

Preparation & review of work procedure for the completed plant condition and Construction.

Summit the daily or weekly inspection report to client and maintain the daily progress report as per our requirement.

Reviewing daily Sub-Contractor work progress.

Checking and work out of balance job in LNG Tank 3, 4 & 2, jetty unloading arm &health study of Cryogenic supports.

Making co-ordination with Client and Vendor as well as Health Study report.

Planning/ scheduling& monitoring of balance construction activity of LNG Terminal.

Preparation work procedure for Equipment erection, SS, Nickel alloy, freshwater& firewater piping system.

Executing fabrication, erection of unit piping work & material handling job as per approved Method statement, ITP/QAP, WPS, and POR.

Maintain daily work force report, daily progress report, co-ordination with client & reviewed weekly progress with client

Preparing as-built drawing.

I)Asst Engineer (Mechanical)

Haldia refinery, WB, INDIA

Company: Punj Lloyd Ltd, INDIA.

Project: Motor Sprit Quality Up gradation Project (MSQ)

Client: LURGI

MAR 2005 – OCT 2005

Responsibilities included:

Planning, Scheduling, Execution, Supervision & Project Management of various A/G unit piping fabrication and erection like CS (IBR, NACE, LTCS), SS, AS, MONEL etc.

Preparing the method statement for erection job of each critical piping system.

Clearing Sub-contractors payment through invoice.

Review the erection & fabrication scheme for critical equipment and joints respectively.

Keep monitoring on daily consumable material for construction purpose

Maintain co-ordination between the client and execution crew and consult for engineering related issue modification.

Execution of erection job of heaters, hydrogen compressor, vessel, pumps, screw pumps,exchanger, column and chiller unit and associated piping jobs of MSQ Up gradation unit( column internal work includes- valve trays, chimney trays, C-grid, Gem packing, inlet feed device, demister pad, spray headers.

Keep maintaining daily work force and daily progress report.

Witness and preparing hydro test and pneumatic test of various package

Clearing punch list activities of various piping system prior to start pre commissioning activity.

Leading the team for mechanical clearance of loops across various departments.

Review of Sub contractor work & bill on daily and weekly basics respectively

Preparing & coordinating the pre commissioning & commissioning activities of pumps, air fin cooler & compressor including Flushing & leak test of Naphtha splitter, Naphtha hydro treated Reformat splitter, Selective hydro genet ion & LPG Recovery system

Preparing as-built drawing for A/G piping

J)Asst Engineer (Mechanical)

Company: Punjlloyd Ltd, India

Project: Mora Sachin Pal Sana Pipe Line, Gujarat, India

Client: GUJRAT GAS CO LTD.

SEP 2004 – MAR 2005

Responsibilities included:

Planning, Scheduling, Execution, Supervision & Project Management of various sizes of gas pipe line ( 16” dia. : 25 KM, 12”dia: 11KM)

Review the pipe lowering & fabrication scheme for critical equipment and joints respectively.

Installation of valve station, pig launchers, pig receivers, header fabrication.

Mechanical Clearance, hydrostatic test and in Pre commissioning activities.

Keep monitoring on daily consumable material for construction purpose

Maintain co-ordination between the client and execution crew and consult for engineering related issue modification

Keep maintaining daily work force and daily progress report

Review of Sub contractor work & bill on daily and weekly basics respectivel

K)Assistant Engineer (Mechanical)

Company: Punj Lloyd Ltd, India

Project: Shore Approach Pipe Line, Gujarat, India

Client: GUJRAT ADANI PORT LTD. / VALETINE MARITIME LTD.

MAY 2004 – SEP 2004

Responsibilities included:

Construction of shore approach pipeline ( 48”dia) I km at mundra port, Gujarat

L)Assistant Engineer (Mechanical)

Company: Punj Lloyd Ltd, India

Project: Dahej- Vijaipur Gas Pipe Line

Client: GAS AUTHORITY OF INDIA LTD. /ENGINEERS INDIA LTD.

OCT 2003 – MAY 2004

Responsibilities included:

Planning, Scheduling, Execution, Supervision & Project Management various gas pipe line (42” dia.: 506 KM, 36”dia: 6.5KM).

Project including associated facilities like sectionalizing station, intermediate scrapper station, scrapper launcher station / receiver station,

Review the pipe lowering & fabrication scheme for critical area and joints respectively.

Mechanical Clearance, hydrostatic test and in Pre commissioning activities.

Keep monitoring on daily consumable material for construction purpose.

Maintain co-ordination between the client and execution crew and consult for engineering related issue modification.

Keep maintaining daily work force and daily progress report.

Review of Sub contractor work & bill on daily and weekly basics respectively.

M)Engineer (Mechanical)

M/s TPS Builders (P) Limited, India

Project: HRSG, Highly Purified Nitrogen Unit, HGU, Digboi Refinery, Assam, India

Client: EIL

JAN 2001 – MAR 2003

Responsibilities included:

Direct supervision and Project Management for HRSG, HPNU, HGU unit.

Preparation of erection schedule, Method Statement.

Conducting progress review and drawing review.

Erection of intercooler, volume bottle for Hydrogen Compressor.

Erection of Cold Storage, Storage vessel for HPN unit.

Construction of Product piping, offsite piping, erection of module of super heater, vaporizer air pre heater, alloy steel, IBR Piping, P5,P11,P12,P22,SS304,SS347,SS321 Piping.

Consult for engineering related issue modification with client.

Hydro test and pneumatic test for different pipe lines.

Preparing As –built drawing.

Declaration:

I hereby declare that the above information is true to the best of my knowledge and belief.

Pinku Sarkar

ACADEMIA

B.E. (Mechanical) – 2000

I.T. SKILLS

Microsoft Office/Words and the Internet.

Date of Birth: 15th May 1978Nationality: Indian. Languages Known: English, Hindi, Assamese and Bengali.

References and Verifying Documentation Furnished upon Request



Contact this candidate