RESUME
Harish Singh Bisht
Address:
Vill-Matiyal Po-Sungarkhal
Distt-Champawat
Uttarakhand
Mobile +91-783*******
PERSONAL PROFILE
Born on : 21 July 1992
Father’s Name : Mr. Jeet Singh
Phone No. : +91-783*******
Nationality : Indian
Languages known : Hindi, English
Marital Status : Unmarried
E-Mail : **************@*****.***
ACADEMIC INFORMATION
QUALIFICATION
SUBJECT
BOARD/ UNIVERSITY
YEAR OF PASSING
High School
Science
U K BOARD
2008
Intermediate
Science
U K BOARD
2010
Diploma
Civil Engineering
U B T E R
2014
Experience
Period
Employing Organiztion and your title/position, Contact information for references
Country
Summary of activites performed relevant to the Assignment
Aug 2014 to Feb 2015
M.S Dalip Singh Adhikari,
Govt A Class Contractor
Position : Junior Engineer
India
Responsibilities included to construct different layer of road crust such as embankment filling, Subgrade, G.S.B, W.M.M.Specification and Contractual drawing; Recording of all type of measurement, To ensure optimum utilization of plant machinery and other resources to carry out field activities and make good pogress of works; To check field dry density, thickness of road crust and surface irregularities and rate of spray of bitumen for tak and prime coat; Preparing bill for Sub-Contractor Payment.
Name of Assignment
Construction of road from Gagar To Siloti Gunth- 23.7 km in the state of uttarakhand under PMGSY
Year
2014
Location
Uttarakhand
Client
PMGSY
Main Project Features
Single Lane project Length 23.7 Km.
April 2015 to Aug 2016
Employer Pravatiya Construction PVT Ltd.
Position : Junior Engineer
India
Responsibilities included to construct different layer of road crust such as embankment filling, Subgrade, G.S.B, W.M.M.Specification and Contractual drawing; Recording of all type of measurement, To ensure optimum utilization of plant machinery and other resources to carry out field activities and make good pogress of works; To check field dry density, thickness of road crust and surface irregularities and rate of spray of bitumen for tak and prime coat; Preparing bill for Sub-Contractor Payment.
Name of Assignment
Construction of road from Barakot To Simalkhet – 25 km under package no 46 package name UDRP/PWD/10/18/RD/046 in the state of Uttarakhnad Hill Terrain
Year
2015
Location
Uttarakhand
Client
PWD Uttarakhand
Main Project Features
project Length 25 Km. project Cost 10 Cr. World bank funded Executed under FIDIC Condition of Contact.
Oct 2016 to April 2018
M/s Sterling indotech Consultant Pvt.Ltd.
Position : Side Supervisor
Responsibilities included to construct different layer of road crust such as embankment filling, Subgrade, G.S.B, W.M.M.Specification and Contractual drawing; Recording of all type of measurement, To ensure optimum utilization of plant machinery and other resources to carry out field activities and make good pogress of works; To check field dry density, thickness of road crust and surface irregularities and rate of spray of bitumen for tak and prime coat; Preparing bill for Contractor Payment.
Name of Assignment
Construction of road from Jhulaghat to Taleswer- 5 km in the state of uttarakhand under world bank PWD Askot, Pithoragarh
Year
Oct 2016 to April 2018
Location
Uttarakhand
Client
W.B PWD
Main Project Features
Single Lane project Length 5 Km.
Oct 2016 to April 2018
M/s Satyam in fratech Pvt.Ltd.
Position : Surveyor
Responsibilities included to construct different layer laying by auto level road such as embankment filling, Subgrade, G.S.B, W.M.M.Specification and Contractual drawing.
Jun 2018 to till date
Name of Assignment
Construction of road from Tanakpur to Sukhidhang - 20 km in the state of uttarakhand under NH Lohaghat
Year
Jun 2018 to till date
Location
Uttarakhand
Client
NH
Main Project Features
Two Lane project Length 20 Km.