LAND SURVEYOR A well trained team and a calibrated instrument give good precision to stake in & out points. No mistakes in coordinates, no waste of time in execution.

PROFESSIONAL RUN

Surveyor – CCC QATAR (Dec’15 to Dec’16).

Water Mega Reservoir Project- Client- Kharamma-Qatar.

Stakeout underground pipelines, sewerage lines, trenches, dermi trenches, manholes,chambers,

Footings,columns,walls. Maintain slab levels as per drawings etc. Alignment of wall & column, before pouring concrete. Take asbuilt & make report for Inspection. Take part in inspection with Client.

Surveyor - Dodsal Engineering & Construction Pte. Limited - Abu Dhabi, UAE (Feb’12 to Mar’14).

Shah Gas Development Project – Client – Al Hosn Gas.

Stakeout structure & equipment foundations, fix bolts on foundations,gridline & elevation mark on the foundations for after erection alignment. Stakeout cable trenches,water hydrant,manhole, catch basin etc. Maintain slope of grading. Rectification of alignment & make report for inspection, Take part in inspection with Client.

Surveyor - AAA Contractors Pvt .Ltd LLC - Ras Al Khaima – UAE (May’10 to Dec’11).

Mina Al Arab Residential Building (G+4) Project - Client- Real-estate of Ras Al Khaima.

Stakeout pile locations, underground pipelines, manholes, sumps, water tanks, sewerage lines, pile covers, footings, columns, openings, ramps, lift boxes etc. Maintain slab levels .Take asbuilt & make

Report for inspection. Take part in inspection with Client.

Surveyor - Geosolution Proservices Pte. Ltd – Kolkata - IND (Jan’09 to Apr’10).

Railway extension project – Jharkhand- IND – Clint - Adhunik alloy & steel Industries Ltd.

Topographical survey & final layout of 25km rail track from the existing plant to Ranchi Jharkhand

Main Railway Division.

Hydro Power Project (Darjeeling, IND) –Client - Abhijit Infrastructure Ltd. (Ranchi, IND)

Traverse along 6km of Balason River, take detail upto 2km both side of the river.

Take cross-section at 25m interval of the river at its up, middle & downstream.

Biomass Power Project (Dinajpur, IND) – Client - Aston field (Bangalore, IND)

Set out of borehole points, pit &trial pit points, boundary line marking of the project area.

STUDIES

Study of Land Surveyor from SCVT-IND (2008), (certificate attested from UAE embassy).

Studies in Auto CAD, Ms Office,MsWord,Excel.

Completed Higher Secondary from WBHSC (2000).

Completed Madhyamik Examination from WBBSE (1998).

SKILLS

Working knowledge of surveying technology and handling modern surveying instruments like

Total Station, Auto level, GPS etc. (Leica Certified).

Ability to work at high degree of accuracy.

Commitment to continuing professional development.

Understand a client’s business needs, planning of legislation, health and safety issues.