Shubham Shivaji Powar
*************@*****.*** 864-***-**** LinkedIn
EDUCATION
M.S., Industrial Engineering.
Clemson University
GPA: 3.43
May 2019
B.E., Mechanical Engineering.
Shivaji University
GPA: 3.55
May 2016
TECHNICAL AND LANGUAGE SKILLS
Six Sigma Green Belt
ASQ-Certified Quality Engineer (June 2022)
SAP
Minitab
Microsoft Excel with Macro Programming
AutoCAD
Siemens Tecnomatix Plant Simulation
PFMEA
Lean Manufacturing
WORK EXPERIENCE
P3 USA, Inc. Associate Consultant: Warehouse Management Greenville, SC Jul 2019 – Aug 2019
Achieved 70% traceability of existing inventory and implement the FIFO method to manage stocks for put-away using SAP: WMS
Eliminated the generated negative stocks, JITBs (errors) and increased warehouse accuracy by 55%
Identified bottlenecks at receiving dock and solutions to improve performance where possible to implement the ERP system
Supported logistics teams on the receiving dock and provided training to scan the inventory boxes at each node of the warehouse
P3 USA, Inc. Associate Consultant – Quality Assurance Greenville, SC Feb 2019 – May 2019
Supported the Quality Gates of 4 assembly lines to promote the JIT Supply Chain between the Tier-1 supplier and the OEM
Inspected 6600 items/month and detected 310 quality issues/month to ensure customers quality standards are met
Reduced COPQ (Returns and Scrap) from $ 1200 to $ 300 per year using DMAIC, Visuals and Poka-Yoke tools
Identified failures and created Pareto Charts to determine potential root-causes and prioritize improvement opportunities
Used A3 problem-solving tool to carry out root cause analysis for identifying errors and resolved the errors that resulted in 45% increased productivity
Kirloskar Oil Engines Ltd. Continuous Improvement Engineer: Manufacturing Department May 2016 - Dec 2016
Cross-functional Kaizen team member and led a team of 4-6 members for the Kaizen events that caused $22000 annual savings
Cross-verified existing documents like APQP, MSA, Check-sheets, 8-D Reports, and Control Plans
Implemented 5S and Kanban Bins to the work area and reduced downtime by 30 seconds at each station
Reviewed given design drawings with AutoCAD-2013 and SolidWorks, reported solutions to the supervisor
Implemented the vector flow method to manage inventory and increased productivity by 40%
Mahindra CIE Automotive Ltd. Operations Intern Jun 2015 - Dec 2015
Assessed existing processes and reduced waste by 13% using tools like root cause analysis, 5S, 8-waste, PFMEA, etc.
Implemented ABC Analysis to the inventory area, achieving 60% traceability
Designed Value Stream Mapping for the shop floor, eliminated waste using TIMWOODS approach and saved $9000
Assisted engineers with the maintenance of the plant by carrying out tag-outs and lock-outs and supported TPM activities
ACADEMIC PROJECTS AND SEMINARS
Design and Optimization of the Bell Housing Manufacturing Facility
Modeled a manufacturing facility for 6, 8, and 9 transmission bell-housings using Siemens Tecnomatix Plant Simulation software
Carried out machine and tool selection by defining Takt time, MTBF, and MTTR required manufacturing and assembly processes of bell and bearing housings.
Optimized number of machines, workforce, and shift-timings for three different scenarios: (1) Ideal case, (2) Real case, (3) Demand fluctuations up to +/- 30% and developed KPI sheets accordingly
Comparative Assessment of WIPER and Standard Inserts on Surface Roughness and Tool Wear in Hard-turning of Titanium Alloy
Assessed the effects of different speeds, depth of cut, feed on tool wear (tool life) and surface roughness in machining (hard turning) of titanium alloy Ti-6Al-4V using CNC machining
Used Taguchi technique for design of experiment and gray relations, Gray Relational Coefficients and analysis of variance (ANOVA) were applied to study the performance characteristics
Calculated optimum values for performance parameters: Cutting speed (1200rpm), feed (0.15mm/rev), and depth of cut (0.1 mm)