Resume

Sign in

Engineer Project

Location:
Rawdat Al Khail, Qatar
Salary:
4500USD
Posted:
September 25, 2019

Contact this candidate

Resume:

CIRRICULUM VATE

WAJID HUSSAIN

Mobile : +974-********/ +92-306*******.

Email : adaf2k@r.postjobfree.com

Master in Engineering Geology

GEOTECHNICAL ENGINNER

Objective

A Geotechnical Engineer with an extensive 5+ years of experience in building and infra-structure. Capable of working independently with minimum supervision and committed to providing high quality service to every project, with a focus on health, safety and environmental issues. Possess a M.Sc. in Geological Engineering.

Responsibilities

Analyzed in interpreted geological, geotechnical in geophysical information from sources such as well logs, bore holes and Arial photos.

Evaluated slops canyon and locate faults and determine areas that may be prone to landslides and mud flows using field work data Arial photographs, charts or research.

Searched for and reviewed research articles and environmental, historical and technical reports.

Prepare geological maps, cross sectional diagrams, stratigraphic columns, charts and technical reports concerning area prone to landslides, using result field work and laboratory information.

Conducted cartography and geological studies to provide information to use in regional development, site selection and development of work projects.

Inspected construction projects such as Wakrah stadium, Al Khor Academy and Metro project Qatar to characterized lithology, analyzed rock quality and engineering problems, applying geological knowledge and drilling machinery.

Identified geological hazards base on geological defective features, such as faults and groundwater, during the excavation in the projects providing advice on mitigation of potential damage.

Performed core logging for lithological identification and characterization.

To advise the design in methodology of construction activities the creation of working teams and ensure sufficient application of risk assessment to geotechnical design and appreciation of risk.

Planning the site investigation program, Tabulation in analysis of the laboratory in the field data, Analysis and design of foundation, providing recommendation for foundation work base on the previous analysis in slope stability analysis for the project.

Review geotechnical interpretative report prepare by the local consultant, Analysis of soil data design of pile foundation including capacity of files in compression later, In addition to preparation the method statement and specification of fire slope load test for the project.

Building static and dynamic earth models incorporating Dynamic Data Integration into reservoir modeling.

Performed various geotechnical assessments in contrast to the project designs.

Coordinated with personnel and evaluated training and performance on job.

Geotechnical site management & investigation.

Geological and Hydrological site investigation.

Assessing the data from the field for Structural Engineer.

Making sure the stability of slopes & foundations.

Analyses of soil, rock and ground water.

Inspection of materials, products, and work in progress for conformance to specifications, and adjusts process or assembly equipment to meet standards.

Analyzed survey reports, maps, drawing, blueprints, aerial photography, and other topographical and geological data.

Professional Summary

Sr. Geotechnical Engineer,

HBK Contracting Company, Doha, Qatar/ May 2014 – Present

Projects Worked on:

1.Lusail Katara Hotel Towers (PK3) at present.

Client: Katara Hospitality.

Project Management Consultant: Qatar Project Management.

Design & Supervision Consultant: Dar Al-Handasah.

Project Cost: 1,298,936,512.00 QAR

The project is in progress of super Structure, MEP, External Façade and Internal Finishing.

2.Doha Metro Phase-1:

a)Depot System Rolling Stock and Track Work (Redline).

b)Stabling Yard Rolling Stock and Track Work (Greenline).

Client: Q-Rail.

Consultant: Systra-Parsons.

Main Contractor: MMHKT

Contractor: Fujita Corporation.

Project Cost: 300 million QAR

The project is in progress and has two contracts i.e. Temporary works and Main works. While Temporary works includes site preparation, establishing the Site offices, Stores and access road to sites.

The Main works Contracts includes Earth work, civil work, Buildings and MEP works required to functional a technically advanced Metro system. The Project is designed to provide a Depot and Stabling yard upon its completion. The project has 21 buildings in Depot and 16 buildings in stabling yard with miles long network of Track slab, Electrical Duct Banks, Drainage systems and Road works as a major deliverables.

3.Qatar Academy at Al Khor.

Client: Qatar Foundation

Consultant: Time Qatar & Dewan Qatar.

Project Cost: 566,323,638.00

The Qatar Academy at Al Khor is a prestigious and comprehensive educational facility of international stature. It is designed to support innovative technology, housed in state of the art educational facilities in order to provide an elite educational experience for all its pupils. The Al Khor Academy development consists of a number of 2 story (G+1) buildings, with each building interconnected by canopy structures, link structures or shared external courtyard space. The project was successfully completed to Original contract date. In essence, the development is made up of 6 principle area types:-

Teaching Areas (from Kindergarten to Grade 12)

Communal Spaces (Libraries and shared spaces)

Administration Areas

Halls and recreation areas

Service Areas

External Spaces (including sports pitches and car parking

4.Al Janoub Stadium, Al Wakrah, Qatar.

Client: Supreme Committee for Delivery & Legacy

Consultant: Samsung & AECOM.

The Al Wakrah Stadium is first of many stadiums part of FIFA 2022 World cup infrastructure scheme. The scope of works for stadium includes:

Construction site wide bulk earth works

Construction, testing and commissioning of site wide drainage and services

Filling works to the Stadium foundations

Construction of Stadium foundations and associated works

Stadium lightening protection

Civil Site Engineer,

Habib Rafiq PVT. LTD., Islamabad, Pakistan.

Projects Worked on:

1.G+4 Storey Residential Building, Islamabad, Pakistan.

2.G+7 Storey Residential Building, Islamabad, Pakistan.

Client: Local Resident.

Project Cost: 50 million INR.

Scope of Work: Sub-Structure, Super-Structure, Internal Finishing for Buildings

Area of Work: Construction Department.

Specialized Inn: Earthwork, Sub-Structure, Super-Structure and Interior Finishing.

Responsibilities:

Supervision of all kind of activities included in start to finish of residential project.

Attending meeting with client to obtain their requirements.

Drafting any modification in architectural design as per client requirement.

Preparing BOQ’s and manpower productivity reports with payment bills.

Performing quantity survey and placing order of required material.

Conducting third party inspections for further approval from municipality.

Educational Qualifications

M.Sc. -Geological Engineering 2013 from University of Karachi, Karachi, Pakistan.

B.Sc. –Geological Engineering 2012 from University of Karachi, Karachi, Pakistan.

Intermediate Education 2007 from Post Graduate of Parachinar, KPK, Pakistan.

Secondary Education 2005 from Israr Shahid High School, Parachinar, KPK, Pakistan.

Technical Certifications & Workshop.

Radiation Protection Officer Course from Centre of Strategic Science in MOE Doha, Qatar (2015)

Introduction to Remote Sensing & GIS by Institute of Space Technology, Pakistan (2013)

Five days’ work shop on well site geologist from university of Karachi

Four days’ work shop on coring and core analysis from Federal Urdu University

Five days’ work shop on GIS and remote sensing in SUPARCO Company.

Four days international conference on water, mineral and Energy Resources.

One-day workshop on fundamentals of Sequence Stratigraphy.

Strength

Dynamic and adaptable person capable of learning new skills rapidly and improvising as required

Ready to share responsibilities and knowledge

Practical and technical skills

An understanding of engineering drawings and principles

The ability to work methodically and precisely

The ability to manage a varied workload in an efficient manner

Good problem-solving skills, Team working skills.

Field Trips

S Sona Pass, Sind (10 days field).

Gadani, Baluchistan.

Salt Range, Punjab (10 days field).

Hub Dam.

Manghopir Anticline

Personal Profile

Father Name

Ali Mohammed

Date of Birth

2 February 1989

Religion

Islam

Marital Status

Married

Nationality

Pakistan

Passport No

ZH6893752

Validity

21 April 2028

Qatar RP No

289********

Validity

1 May 2020

MMUP Certification

Under Process

Languages

English, Pashto, Urdu.

Driving License

Pakistan.

Declaration:

I hereby assure you that the Details above are correct and genuine as per my knowledge.

(Wajid Hussain)



Contact this candidate