Resume

Sign in

Teamwork, Responsibility, Commitment to career, Commercial awareness

Location:
Khobar, Eastern Province, Saudi Arabia
Salary:
USD 3000-4000
Posted:
September 20, 2019

Contact this candidate

Resume:

CURRICULUM VITAE

Name : ABUBAKER FAIYAZ SYED Contact: +966-**-***-****

Position : Structural Designer Email: adaeja@r.postjobfree.com

Nationality: Indian Visa Status: Transferable Iqama

SUMMARY:

20 +Years Experience in Oil & Gas Saudi Aramco, Petrochemical, Mines and Construction Companies in Civil /Structure/Steel Structural and Architectural works with leading Engineering Consultants. Ability to handle engineering tools relevant aspect of CAD Design Software’s Microstation, AutoCAD & familiar with PDS modelling frame work plus& Tekla Structure.

Edctional Qualification : Diploma in Civil Engineering

Arcad Engineering and Construcion Company

Al Khobar

Position: Civil Supervisor

July, 2017 – Till date

Master Gas System Saudi Aramco

Western Region

Dragados Gulf Construction Co.

Al Khobar, Saudi Arabia

February,2015- Nov. 2016

Position: Steel Structure Supervisor

Project: Ma’den DAP/NPK-2

Ras AL Khair Industrial City.

Nature of Work : Steel Structual Supervisor

Employee in intecsa industrial-Dragados Gulf Construction Co. Ltd. UMM WU’AL Storage & Offsite at RAS AL KHAIR MA’ADEN PHOSPHATE SAUDI ARABIA MINING COMPANY.

DAP/NPK PLANT. EPC PROJECT

Diammonium Phosphate/Nitrogen Phosphorus Potassium. with Zamil Steel Structural Division 2nd Industrial City Dammam as a Steel Structure Engineer for Associate Fabrication work for12000 hi Tone Steel.

Responsibilities:

Reviews constructability and ensure work execution Project steel structural drawings receive from Intecsa Spain Madrid. Making files and folders for contractual scope of work as well as prepare and arrange folders in the system in proper way with new revisions. Issue the IFC drawings for fabrication. Controlling information for the new revisions to the fabrication workshop.

Response RFI and technical queries for fabrication with help of project drawings. Receiving transmittal from fabricator erection drawings and shop drawings. Review the transmittal drawings professionally manners mistake found correct accordingly project drawings with red marked up. Those are correct approved by signature for fabrication which are wrong instruct to resubmit with corrections. Making weekly reports of transmittal, RFI, List of work fabrication etc.. Fabrication done of various areas for DAP/NPK Plant. List Below

Standards Drawings, Process Building E/F 6 Storied, Process Building G/H 6 Storied, as well as supervision of erection steel for the below mention activities.

Scrubbers E/F, G/H, NORTH PIPE RACK, PIPE RACK E/F, G/H.,ADMIN. MAINTENCE BUILDING TRUCK UNLOADING, MAIN ELEC. SUBSTATION, STORAGE ELEC. SUB STATION, PORT ELEC. SUB STATION, RAW MATERIAL, AGITATOR, PORTABLE WATER CHILLER UNIT,WEREHOUSE.

SOFCON

Al Khobar, Saudi Arabia

Jan, 2014- Dec. 2014

Position : Designer Civil/Structural

Project : Fadhili Gas Programme

Residential Projects

Saudi Aramco Jubail

Petrofac Saudi Arabia Ltd

Al Khobar. Saudi Arabia.

March, 2010 – Dec. 2013

Position : Designer (Civil/Structural)

Project : Karan Utilities & Co-Generation

Saudi Aramco Khursaniyah

Project : Rabigh Phase II Petrochemical Project

Saudi Arabian Kentz Co. Ltd

Al Khobar, Saudi Arabia.

May 2006 – May, 2009

Position : Cad Designer

Project : SIPCHEM

Jubail. Saudi Arabia

: Petromin Shell

Jubail, Saudi

: Al-Zamil Pipe Preparation & End finishing

Dammam

: Sharq Expansion Utilities & Offsite

Jubail. Saudi Arabia.

Fahad Ali Reza Engineering Consultants

Al Khobar, Saudi Arabia.

June 2009 – Mar, 2010

Position : Cad Coordinator

Project : Royal commission Residential Project

Nature of Work : Coordinator for project design drawings.

Sajjad Shahid & Associates

Consulting Engineer and Project Management

Hyderaabad, India.

2005 – 2006

Position : Civil/Structural Designer

Project : Christian Medical College

Hyderabad, India

Al Osais Contracting Co.

Dammam, Saudi Arabia.

Feb, 2002 – July, 2005

Position : AutoCad Draftsman

Project : Gosp 9 & 11 (Uthmaniyah)

: Ju’aymah Gas Plant (Ju’aymah)

: NGL Plant (Yanbu)

: Dhahran Medical Center

Applicant,

Abubaker Faiyaz Syed



Contact this candidate