Post Job Free

Resume

Sign in

Project Manager

Location:
Delhi, India
Posted:
September 19, 2019

Contact this candidate

Resume:

Page * of *

MOHD MOHSIN

Permanent Address: House No 129, Mirpur Cantt Kanpur-208004

Communication Address: GF-2, Plot-12, Sector-6, Vaishali Ghaziabad-201010 Mob: +91-790*******; Email: adad25@r.postjobfree.com Seeking a Managerial Assignment in a growth oriented organization and contribute to the development of the organization while concurrently upgrading my skills and knowledge. PROFILE AT A GLANCE

With 10 years record of success overseeing all phases of TMS and ATMS with technical expertise in implementation, operations, and support function

Adapt in analyzing information needs evaluating end-user requirements, custom designing solution, trouble shooting for complex information system management.

Installation and Maintenance of various Electrical Panels and Electrification of Highway/Plaza i.e High Mast, Street Light and Canopy Light Installation.

Backed by strong credentials and a proven history of on-time, on-budget and high-quality project completions.

CORE COMPETENCIES

● Strategic Planning

● Project handling

● Estimating and Proposals

● Training & Mentoring

● Procurement

● Client Servicing

● Stock Management

● Field Control

PROFESSIONAL PORTFOLIO

SOWiL Limited

Deputy Consultant since June 2019

Responsibilities

● Scheduling the Traffic surveys using portable Automatic Traffic counter cum classifier system in West Bengal and Odisha as per guidelines of IHMCL, NHAI and MoRTH

● Ensuring the traffic surveys to be conducted with the minimum variation from the engineered locations listed by IHMCL

● Effective management and utilization of assets provided to the site team in order to minimize the downtime and smooth completion of site

● Ensuring the deliverables to be ready within the permissible time and their delivery to the client after conducting a quick QC of counting and classification accuracy

● Co-ordinating the arbitration between SOWiL and IHMCL against the attempt of inviting fresh bids for our project by IHMCL in between the running contract

● Monitoring of all the processes involved in setting up of ATCC equipment, data collection, validation and submission of final report to client

● Meeting with IHMCL and NHAI officials to report the progress of ongoing round of traffic surveys, billing and other related things to bridge the gaps

● Effective management of the team of more than 100 resources

● Research and Analyze traffic flow data for various management information system Page 2 of 4

QuaLiX Information System

Project Manager from February 2018 to June 2019

Responsibilities

● Installation, commissioning and successful handover of ATMS system as per MoRTH 5th Rev. at

Hisar-Dabwali project owned by Gawar Construction Limited

● Assisting the core team in achieving the hassle free operation of Fastag

● Handled 5 ATMS projects in terms of planning, execution, budgeting and liasioning

● Finalization of ATMS equipment in line with the guidelines of MoRTH and NHAI whichever qualifies for the project and accordingly documenting the System Design and Proposal.

● Meeting with Client, Independent Engineer and NHAI officials in order to clarify the doubts in equipment locator quantity and location and to get the System Design approved

● Highlighting the challenges of completing the project under the defined time-line and accordingly prepare a detailed execution plan

● Listing dependencies and lifecycle of ATMS products during operation and maintenance of ATMS systems

● Identifying and Optimizing the gaps in ATMS products as mentioned in MoRTH 5th Rev. and NHAI

policy document

● To coordinate all quality processes during and post installation phase system Khalghat Sendhwa Tollway Pvt. Ltd. owned by Uniquest Infra Ventures Pvt. Ltd. Asst. Manager from April 2016 – January’18

Responsibilities

● Review of Toll Management System at project site and recommended for a revamp with highlighting security and complexity issues in the existing system which was approved by management

● Inauguration and Stream-line of Fastag program

● Listing deficiencies or losses in operation and maintenance of ETC lanes and follow-up with various agencies on requirement

● Attended various conferences along with Banks and NHAI for nullifying the issues highlighted in the program.

● Appointed to perform various internal and external audits and ensurin no critical observations raises by auditors

● Implementations of new compliances on TMS

● To coordinate all quality processes during and post installation phase for TMS

● Training of Technical, Toll Operations staff and supervisors on Different TMS modules.

● Research and Analyze traffic flow data for various management information system

● Ensure all routine and schedule maintenance activities to be carried out for all Toll equipments as per manuals supplied by equipment supplier

● To maintain all the equipment installed on the project to ensure their functioning optimally on a round the clock manner and set high standards and levels of service and adheres to them.

● To maintain adequate inventory of spare and consumables for each system and sub system. Soma-Isolux Varanasi-Aurangabad Tollway Pvt. Ltd.

Executive – Toll System and HTMS (August 2011 – March 2013) Sr. Executive – Toll System and HTMS (April 2013 – April 2016) Responsibilities

● Implementations of New Compliances on TMS, after change requirement raised from Operations staff.

● To coordinate all quality processes during and post installation phase for HTMS

● Training of Technical, Toll Operations staff and supervisors on Different TMS modules.

● Research and Analyze traffic flow data for various management information system Page 3 of 4

● Ensure all routine and schedule maintenance activities to be carried out for all Toll equipments as per manuals supplied by equipment supplier

● To maintain all the equipment installed on the project to ensure their functioning optimally on a round the clock manner and set high standards and levels of service and adheres to them.

● To maintain adequate inventory of spare and consumables for each system and sub system.

● To maintain complete record of all maintenance equipment maintenance activities.

● To maintain monthly requirement at the Plaza.

● To prepare reports on equipment maintenance as per CA requirements as required and scheduled

● To establish a backup and recovery procedures for tolling data Achievements

● Smooth commissioning of the Toll plaza at Mohania in the states of Bihar.

● Expedite the TMS and HTMS installation at one of the DBFOT based project at NH-6

● Made our benchmark to achieve best accuracies across lanes

● Developed checklist for ITS and Electrical departments for system excellence

● Helped the Rajdeep team to make amendments in the software by giving ideas on how the pilferages could be controlled and to get better reports

● Recommended and Promoted from Executive position to Sr. Executive position in 2013. International Road Dynamics SouthAsia Pvt. Ltd.

Engineer – Installation and Customer Support (August 2010 – July 2011) Responsibilities

● Installation and Commissioning of Toll Plazas with all prescribed equipments depending upon plaza requirement.

● Maintaing pre-requisites for a project from both system integrator and clients in order to

● Procurement of goods as per the Mobilisation Budget.

● Purchase and work orders to make and get approved.

● Training of Technical as well as Toll Operations staff and supervisors.

● Setting the procedures to run clean and smooth operations at plaza.

● Managing Team for Installation of Systems.

● Active Coordination with system consultant and supervision of the Vendors

● Installation and Commissioning Analog and Digital Cameras and its configuration to DVR ad NVR respectively.

● Supervision of all Civil work and electrical work required.

● To maintain proper inventory of stocks of equipments for each systems and subsystem.

● Asset Coding of all the toll equipments.

● Monitoring the daily performance of the system and reporting to HO.

● To ensure routine and schedule maintenance activities of toll equipments.

● Maintaining document and performing SAT after complete testing of all Toll Equipments. Metro Infrasys Pvt. Ltd.

Site Engineer (July 2009 – July 2010)

Responsibilities

● Installation and Commissioning of Toll Plazas with all prescribed equipments depending upon plaza requirement.

● Procurement of goods as per the Mobilisation Budget.

● Managing Team for Installation of Systems.

● Supervision of all Civil work and electrical work required.

● To maintain proper inventory of stocks of equipments for each systems and subsystem.

● Monitoring the daily performance of the system and reporting to HO.

● To ensure routine and schedule maintenance activities of toll equipments.

● Ensuring all the corrective maintenance to be done Page 4 of 4

PROFESSIONAL QUALIFICATION

● In 2009, completed B.Tech in Electronics and Communication Engineering from Uttar Pradesh Technical Universuty

● Completed a training on Telecommunication from TNS Noida PERSONAL PARTICULARS

● Date of Birth: 02 October 1988

● Languages Known: English and Hindi



Contact this candidate