HITENDRASINH V. MAHIDA
Ta:-nadiad,Dist:-Kheda,
Near vasodhari mata mandir.
At&Po-VASO-387 380.
Personal Profile:
Date of Birth : 23rd June 1982.
Marital status : married.
Language Known : English, Hindi, and Gujarati
E-mail : ***********@*****.***
Cell No. :+91-992*******.
Passport no. :-F-9764732
Educational Qualification:
ELECTRICAL ENGINEER
Sl.No.
Exam Passed
Name of Board/University
Year of Passing
Percentage
1.
E.S.T.(Certificate Course)
T.E.B.
June 1999
77%
2.
D.E.E.
T.E.B.
Nov.2002
78.51%
3
B.Tech Electrical
M.B.University
June-2013
71%
Experience:
TORRENT CABLES LTD.NADIAD
It is one of the torrent groups industries. It is ISO-9001-2008 and OSAS-14001-2005 certified company. They manufacturing of L.T., H.T. and EHV cables. They are Installed new plant of 132kv EHV cable manufacturing. I m their working in New Plant as an Executive Engineer for plant Eraction & Commissioning. After completed of Project(1.5 years) shifted in Utility Maintenance(5.5 years) right now I am working in production line maintenance (since 2 years)
Appreciation:- Appreciation awarded for the best performance in project and maintenance in 2010 -2011 from TORRENT CABLES LTD.
DURATION: 15th JUNE 2009 to till date.
DESIGNATION:-Executive Engineer (Maintenance).
CEMA ELECTRICLIGHTING PRODUCT INDIA LTD
LIMBASI FACTORY
It is a totally lighting product manufacturing industries. It is ISO-9001-2006 certified company. its manufacture GLS lamp, HID lamp, sodium & mercury lamp, 40W tube light. It has own test certified laboratory.
DURATION:- JUNE 2008 to JUNE 2009.
DESIGNATION:-Electrical Officer. (Utility & Plant Maintenance).
METROCHEM INDUSTRIES LTD,PADRA
Company profile:-
METROCHEM is totally chemical plant. It is colobretion with foreign country (HUNTSMAN Group). This is very continues chemical plant. They are manufacture dyes, D.P.P., D.F.P., S.S.R.P., H-ACID, SO2Nox.It has own captive co-generation power plant of 3 MW lignite base. Its turnover is 400 coror P.A.
It has other power sources are taken by GEB 1500KVA and have 1325 KVA, 1250KVA, 1000KVA D.G. sets.
DURATION:- JAN 2007 TO JUNE2008.
DESIGNATION:-Electrical Engineer (Maintenance)
(POWER PLANT)
SARDAR SAROVOR NARMADA NIGAM,KAVADIA COLONY.
Company profile
It is HYDRO POWER STATION having a 50MW five (BHEL make) unit and 200MW six units. total generation capacity is 1450MW.it has two section one is C.H.P.H 50MW and R.B.P.H. 200MW.it s dam on NARMADA RIVER. It is under GEB controlled.
GEB was given a contract SUPREME SERVICE for operation and maintenance. I was work contract Base under Supreme Services.
I was work at C.H.P.H.50MW five units.
DURATION:- JAN 2006 to DEC 2006.
DESIGNATION:- Shift Supervisor (Operation & Maintenance.)
(POWER PLANT)
WANAKBORI THARMAL POWER STATION.WANAKBORI.
DIPLOMA APPRENTICE TRAINEE ENGINEER (DET).
Have A Seven unit of 210MW, total Generating Capacity is 1470MW. It is largest power plant in Gujarat.
DURATION:14th DEC.2004 to 13th Dec.2005.
P.B. Electrotech
I have been with P.B. Electrotech from Jan-2003 to nove-2004.as an Assistance Electrical Engineer. (Supervisor)
Company Profile:-_
The P.B.Electrotech is totally electro-fielded company and also class “A” GujaratGovt.Regd.it is contract base company it was taken by the Ahmadabad Electricity Company for electrical related works. It works on these types of specialist like erection & commissioning of HV LV equipment.LV, HV & EHV cable laying, servicing & maintenance of electrical installation panel. Measurement of power, current, voltage etc.
WORK EXPERIENCE:-
Project :
Project Execution and Man power planning.
Cable trey work, Cable laying work, Cable Termination.
Erection & Commissioning of Power Transformer, PCC Panel, MCC Panel, PDB Panel, H.T. & L.T. Panels.
Erection and commissioning up to 600kva UPS System.
Erection and commissioning of 1250kva.1000kva D.G.Set and its synchronizing panel.
Power Distribution management of the Power plant, GEB sources and D.G. sets power.
Operation & maintenance :-
Operation and maintenance of utility equipment like Air Compressor, N2 plant, Chiller, water distribution system, WTP Plant, Air Conditioning System, EPABX Telephone System, UPS up to 600KVA, D.G. Sets up to 2500KVA and L.T., H.T. panel, PCC, MCC, PDB, PMCC panels and Power Transformer.
Operation and maintenance of Plant Machinery with minimum breakdown.
Carried out breakdown, preventive and Schedule maintenance with analytically Solution.
Operation and maintenance of hydro-power plant 50MW.
Operation of 3.3kv, 11kv, 66kv, 132kv, 220kv, 400kv switch yard.
Synchronizing operation with other unit and grid system by manually.
Availability of critical power supply with in time period in case of GEB fail or” POWER PLANT” tripping.
Availability of critical power supply with in time period in case of Black Out condition.
Maintenance and troubleshooting of 110V, 48V and 24V battery chargers and Battery banks.
Problem solving in PLC,Drive,Automation and Instrumentation.
I m involving in Energy saving Activity.
General Knowledge:-
Handling independent shift and man power management.
Working in SAP system.
Interaction with GEB.
I am involving in Energy saving and Energy Conservation techniques.
Taking out purchasing requation and indent of material & material Management.
I am interested in team work management.
Planning of schedule and preventive maintenance regularly.
I have certificate of permit for ELECTRICAL SUPERVISOR approved by Govt.of Gujarat.