Daniel Todd Nevill
**** ****** ******* ** ******* GA.
706-***-**** – Cell No.
E-Mail = ********@*****.***
Professional Experience:
Maintenance Manager
• Responsible for implementation for a new CMMS system.
• Responsible for implementation of PM’s on Injection lines, Automated Assembly lines and all facility support equipment.
• Responsible for 9 direct reports for a 24/7 plant. 2017- 2019 Shasta Beverage Co.
Corporate Capital Project Engineer
• Responsible for implementation for a new CMMS system in 12 Plants
• Manage CAPEX projects for manufacturing for Filling, Packaging, Electrical Upgrades, Water Processing, Waste Management, and Facilities Expansion. Projects from 120K to 22M
• Managed and maintained CAPEX projects from process improvements and new product manufacturing.
• Installation of new manufacturing lines and handling this project from concept to final plant turn over.
• Responsible for new plant expansion, current plant build out and rented plant location facilities.
• Responsible for updating and documenting plant layouts and line upgrades - AUTOCAD 2015-2017 Resilux America LLC
Facilities\EHS\Factory Automation Manager
• Responsible for the PM documentation, Work Order and CMMS System.
• Responsible for the maintenance of HVAC, Air, Electrical, Water and Fire Systems Utilities.
• Manage CAPEX initiative’s for all departments.
• Managed and maintained from process improvements and new product manufacturing.
• Responsible for new plant expansion, current plant build out and rented plant location facilities.
• Responsible for Parts Department that supports all areas of the plant.
• Responsible for Injection of Preforms and Bottle Blowing machine maintenance.
• Responsible for EHS within the facilities.
2011-2014 Lonza
Packaging & Facilities MaintenanceManager
• Oversaw and drove initiatives for maintaining of Facility Improvements and uptime performance facilities thru new project improvements for blending, packaging and bottle liquid\dry filling.
• Oversaw the PM documentation and Work Order and CMMS System.
• Responsible for the maintenance of HVAC, Air, Electrical, Water and Fire Systems Utilities.
• Managed new plant start-up and new equipment installations.
• Managed and maintained from process improvements and new product manufacturing.
• Responsible for maintenance of all manufacturing and packaging equipment associated to Liquid and Dry Filling and automatic packing\palletizing.
• Responsible for Parts Department that supports all areas of the plant. 2007-2011 Manufacturing Resources International Facilities Manager\Manufacturing Engineer\Packaging Engineer
• Oversaw and drove initiatives for maintaining of Facility Improvements at Two Facilities.
• Responsible for the PM documentation and Work Order CMMS System.
• Managed and Lead the start-up on a new 130KSQFT facility.
• Managed and Lead new plant start-up and new equipment installations and processes.
• Managed and Lead process improvements and new product manufacturing.
• Managed and Lead new product prototyping, customer installations and production products.
• Managed and Lead product packaging\crating.
2004-2007 Ciba Vision; Duluth, GA
Senior Project Engineer
• Managed and Lead the implementation of Facility Improvement Projects.
• Supervisor of the PM Team and Parts Repair Department. (24 Direct reports and two contract)
• Worked as a team to maintenance and improve manufacturing within the company.
• Designed and built prep rooms along with a team of people from many different departments.
• Acted as team lead on several cost improvement and downtime reduction teams. Senior Process Engineer
• Managed and Lead the implementation the 5's program in production.
• Was responsible for leading the department in reducing the amount of cost spent in outsourcing repaired parts by over 2.5 million in the first year.
• Expanded the Parts repair department by 50% and improved quality buy implementing new inspection and repair procedures.
• Managed and Lead the Preventive Maintenance Team on the manufacturing equipment.
• Manager of the PM Team and Parts Repair Department.
• Worked on methods of improvement and downtime reduction during PM’s and Parts Repaired.
• Made sure all procedures were within FDA compliance through proper SOP procedures.
• Trained in GMP and ISO to meet FDA requirements. 1999-2004 Clorox Services; Pleasanton, CA
Senior Staff Engineer Corporate Quality
Group\Production Services Group
• Support cost savings projects for the Brita, Kingsford Charcoal, and Food, Bags and Wraps and Home Cleaning divisions.
• Review and write product standards and test methods. Work closely with material Vendors as part of the cost savings projects.
• Lead product failure investigations, reported results and then made recommendations to management.
• Used MS Project, Matlab, AutoCAD, Word and Excel, Six Sigma Tools (Root Cause, 5y’s, KT) in my day-to-day tasks. Kennesaw, GA Senior Design\Staff Engineer\Project Field Engineer
• Design\Project Engineer for plant supported projects such as Equipment Design and Layout, Cost Estimating, Cost Quotations and Project Management.
• In house designer on equipment for cartioning, case packing, de-nesting, and conveying.
• Anything from packaging line Design and installation, plant expansion construction, extrusion lines, automation assembly, optimization of existing manufacturing line
• Products range from Plastic Bags, Charcoal, Gladware, and Water Filtration products.
• Used MS Project, AutoCAD 2000i and many other programs.
• Implemented, designed, and maintenance three new packaging lines in the KY plant. This was a 15M project and was completed in an 18 month on site term. I was responsible for the complete line from the scale fillers through the palletizer system. It had several custom pieces of equipment and some stock OEM equipment.
1992-1999 C.R.Bard Inc.; Covington GA
Sr. Design Engineer
• Responsible for planning facility layouts (new plants and current plants), designing packaging equipment, developing new technologies, testing methods, costing manufacturing improvements, cost reduction programs to meet divisional planning goals and maintenance equipment.
• Other duties have been, Project Engineering to support marketing through new products and ideas to increase market growth.
• Worked in R&D product design department.
• Developed several new product ideas and several new patents. Moncks Corner, SC
Associate Engineer
• Responsible for the design of equipment used in house for manufacturing medical products.
• The equipment designed consisted of, conveyor systems, pick and place systems, automated printing systems, and rotary assembly equipment.
• Upgraded existing equipment, plant layouts and maintained the facilities drawing system.
• Trained in Process Validations and Equipment Validations IQ, OQ, PQ, ISO and GMP manufacturing standards to meet FDA's requirements. EDUCATION
Associates of Applied Science in Eng Tech; Southwestern Michigan College, Dowagiac, Bachelors of Science in Management Southern Wesleyan University, Central SC Six Sigma Green Belt, 1994 Certificate in Program\Project Management, 2002 and 2018