GERARDO G. DELA CRUZ
**** ***** *****, **, *** Rancho, NM 87144
617-***-**** / 505-***-**** / ****************@*****.***
VESSEL PROJECT ENGINEER NEW CONSTRUCTION
CAREER OBJECTIVE:
Graduate / Professional Naval Architect and Marine Engineer with 30 years of Ship designing, shipbuilding, Ship conversion and Ship repair experienced.
SUMMARY:
Hull forms and hydrodynamic performance including development
of hull form geometry and lines plan, hydrostatic and curves of form,
resistance, speed & power estimates.
Weight and stability analyses, including dynamic stability, development
of weight center of gravity estimates, performance of deadweight survey
and inclining experiment.
Top load integration coordinating inputs from various naval architectural and other engineering discipline, such as marine engineering structure.
Designing & developing hull girder bending moment, scantling in accordance with appropriate rules by IACC, design features such length, beam, draft, displacement and speed.
General arrangements and configuration, developing requirement for area and volume.
Mooring Calculation.
Conduction of Inclining Experiment & Trim Stability Calculations
Designing of heavy lift derrick mast & boom and riggings
Materials, Labor man-hour estimating and costing.
PROFESSIONAL EXPERIENCE:
NAVAL ARCHITECT / PROJECT CONSULTANT
Montenegro Shipping Lines (contract)
Batangas City, Philippines.
December 2016 – August 2018
Modification of Roll on Roll off vessel from car ferry to passenger vessel.
Preparing of work to accomplished by studying to blueprint specification and plans.
Study of passenger accommodation and facility plans
Designing and preparation of work package, materials take off, estimation and costing.
Top side integration.
Analysis of initial stability.
Recalculation of hull scantlings.
Weight analysis
Conduction of Inclining experiment and calculations.
Mooring analysis
Conduction of sea trial.
Unison/General Dynamic NASSCO: (Contract)
7470 Mission Valley, San Diego.
California, 92108
USA
July 11, 2016 – Sept 23, 2016
Naval Architect/ Mass Property Engineer
For the construction of Navy Replenishment Vessel
TAOE
Participate in preparation of Weight’s Control Plan (WCP)
in accordance with Society of Allied Weight Engineers (SAWE)
General Dynamic Corp / Bath Iron Works:
Bath, Maine 04530 USA
Senior Engineer for Weight & Moment Sect
Senior Engineer for Hull Structural Division
Feb 06, 2006 – Jan 23, 2011
Research and development, DDG1000.
Machinery and outfitting foundation Analysis (LCS INDEPENDENCE)
Contributed to ship weight & moment analysis (CATIA)
Ship hull primary structure and grillage analysis,
Longitudinal Strength calculation
Hull Section Modulus
Mooring Calculation
Finite Element Analysis (MULTI FRAME)
Keppel Subic Shipyard & Engineering:
Corp. formerly (PHILSECO)
Cabangaan Point, Olongapo
Zambales, Philippines.
Hull Section Manager
Jun 20, 1990 - Jan 30, 1990
In charge of hull repair, sandblasting, painting, docking and undocking, development of scope of work and specifications, EPC man - hour allocation, and distribution of manpower.
Santiago Shipyard & Engineering Works:
Consolacion, Mandaue,
Cebu Philippines
Project Manager & Consultant: contract
Jan 16, 1987 – May 30, 1990
In-charge of especial projects: construction and modification of ships, such as container carrier, log carrier, roro passenger vessel, oil, and molasses carriers, barges, & offshore supply, tug boats, and fishing boats, development of data/specifications, scantling calculation & analysis as per ABS rules, design and preparation of work package, calculation of speed and power, design of rudder and propeller, BOM take-off, estimation and costing, mold lofting, and construction supervision.
Keppel Cebu Shipyard & Engineering Works, Inc
Dad Cleland St.
Lapu - Lapu City
Mactan Island, Cebu Philippines
Lead designing Section:
Mar 06, 1974 – Dec 02, 1977
Development of ship hull structural plans.
Development of Lines and offsets.
Development of shell plating.
Development of ship Super structure
Preparation of Mold lofting and pattern
Provide construction technical plans
Development of scope of works
Keppel Cebu Shipyard & Engineering Works
PROMOTED:
Assistant Planning & Estimating Dept:
Jan 1977 – Dec 1980
Provided technical support for ship repair department; developed of scope works, project schedules, labor, and man-hour estimations and costing; represent the company in foreign countries for technical negotiations; ships inspection and surveying.
Prepares proposals, research and development project supports proposals technical writing and editing support of Business Development activities.
Prepare docking and undocking calculations and distribution of docking blocks.
Development of ship repair scope of works.
Prepare technical reports and daily accomplishment / or reviews technical data reports provided by others as directed.
Performs and checks materials / consumption and assure conformity with applicable classification societies, regulatory bodies or ships owner specification requirements.
Perform ships stability assessment and analysis if requested.
Practice value of shipyard operating cost, overheads, indeterminate production expenses, budget control and constantly leasing with material suppliers.
Perform other duties as assigned by management.
Keppel Cebu Shipyard & Engineering Works
PROMOTED:
Manager Planning & Estimating Dept:
Dec 1980 – Dec 1986
Lead the shipyard to expand services from ship repair to ship building and conversions.
Conduct employee seminars for skilled jobs training program.
Conduct training in mold lofting, welding, ship fittings.
Supervised estimating dept for ship repair and ship building, development of scope of works.
Development of CPM or Microsoft Project.
Re-designing of hull primary structures, calculations of pre-conversion stability, redesigning cargo accessibility re-designing pontoon covers, designing of heavy load beams and pillars, redesigning & upgraded existing derrick mast and boom from 15tons to 40 tons SWL, re-designed rigging, re-designed cargo hold and inner bottoms. Conduct Inclining experiment & trim stability calculation.
Development of work package.
Preparing of docking calculation and mooring calculation.
Foreign country assignment, especial project technical negotiation
EDUCATION:
Bachelors in Naval Architecture and Marine Engineering
University of Cebu, Philippines (company scholar)
1978 - 1984
National University
Manila, Philippines
3 years towards BS CIVIL ENGINEERING
1971 – 1974
Manila Technological Institute
Manila, Philippines
Vocational: Diesel Mechanics
1968 – 1970
PROFESSIONAL MEMBERSHIPS:
Philippine Association of Society of Naval Architect
And Marine Engineer (SONAME)
1984 – present
TRAINING AND CERTIFICATIONS:
Post engineering specialization course, ship designing, ship repair, shipbuilding and ship modification.
Graving dock – ship building, modification and ship repair operation training in TSUNEISHI Japan 1983 - 1984
Interim Security Clearance -Top Secret (General Dynamic Corp) for DDG 1000 & LCS Project.
CATIA – Enovia V5 casual user
MULTI FRAME – Finite element analyses
AUTO CAD – Designing
GHS
SKILLS:
Development of Lines and Offsets.
Speed and Power Calculations.
Machinery Foundation Design
Development of General Arrangement, Mid-ships Scantling, Shell Expansion and
Other detail plans.
Hull Scantling Calculations as per IACS.
Ships loading periodic motion factor.
Ships Structural mass property calculations as per SAWE and SWBS.
Tank Capacity Calculations.
Primary & Secondary structures Grillage Analysis.
Longitudinal Strength Calculations.
Conduction of Inclining Experiment & Trim Stability Calculations.
Mooring Calculations.
Docking Calculations.
Designing of heavy lift derrick mast / boom and riggings.
Mold Lofting.
Project Management for conversion and new modular constructions.
Materials, Labor man-hour estimating and costing.
Software: Microsoft Office, Multi Frame 4D, Auto-Cad
REFERENCES:
Robert Todd – Equity New Real Estate
315 Alameda Blvd
Albuquerque, NM 87113
Brian C. Wilson – Senior Control System Engineer
Collins Aerospace,
Westford, MA
Kevin Kelly – Weapon System Engineer
NAVSEA
514 Washington St
Bath, ME, 04530
Russel Hoffman- Manager System Integration
General Dynamic Corp
Bath Iron Works
700 Washington St.