Post Job Free

Resume

Sign in

Power Plant Engineer

Location:
Ahmedabad, Gujarat, India
Posted:
September 10, 2019

Contact this candidate

Resume:

M.Thiruselvam

Mobile No

+91-860*******,

932-***-****.

Email:

adaa8q@r.postjobfree.com

Skype id:

thiruselvam

or

860-***-****

Present Address:

N0.302, Rangoli Apartment,

Radhanpur Chowdi Road,

Mehsana, Gujarat

Personal Data:

DOB : 07/12/1988

Sex : Male

Nationality : Indian

Marital Status: Married

Permanent Address:

3/3087-4

Meenachi Nagar

1st Street

Pattinamkathan,

Ramanathapuram

Pincode: 623503

Tamilnadu, India

Objective

Intend to build a career with leading corporate of hi-tech environment with committed & dedicated people, who will support me to explore myself fully, realize my potential. Willing to work as a key player in challenging & creative environment. Adaptable and a quick learner, possess skills to work under pressure.

Experience in Shortly:-

Working as Electrical Project Incharge & Safety Officer

from June 2015 to at present in Electro Corr Damp Pvt.Ltd, Ahmedabad Gas Grid Line (CP)

For Client: Gujarat State Petronet Limited,

Ahmedabad, GUJARAT, INDIA.

Worked as Electrical Project Engineer from October 2012 to December 2014 in Al i Haider Al Yami &Sons Company at Kingdom of Saudi Arabia (Abroad).

For Client: Saudi Consiladated Electricity Company

Kingdom of Saudi Arabia (Abroad).

Worked as New Projects Design & Development Engineer in Sree Vishnu Magnetics Pvt. Ltd from 2011 to October 2012 - Chennai - Tamil Nadu, INDIA.

Worked as Site Incharge in Oil & Gas pipe line Cathodic Protection in Corrosion Control Engineers from 2010 to 2011 at Karaikudi, Tamil Nadu, INDIA.

Education

Diploma in Industrial Safety - (2018-2019) - Annamalai University- Chennai, Tamil Nadu, India.

BE. (Electrical Electronics Engg) – (2006 to 2010) – Syed Ammal Engineering College, (Under Anna University - Chennai.), Ramanathapuram, Tamil Nadu.

Higher Secondary- (2005 to 2006) – Louis Levail Matriculation Higher Secondary School, Ramanathapuram, Tamil Nadu.

SSLC–(2003 to 2004) – United Matric High School, Ramanathapuram,

Tamil Nadu.

Software Skills

Worked Softwares : Auto-cadd, RAY MEDI, SAP.

Office Applications : MS-Office, MS-Word, MS-Excel,

MS-Powerpoint.

Operating Systems : Windows-98, 2000, Windows XP,

Windows 7,8,10

Set of Experiences Briefly:

Present Experience

PROJECT INCHARGE .

Client

Gujarat State Petronet Limited (GSPL)

Duration

April 2018 to Till Date (GSPL Project)

Total Years of Experience at Present Company

(Electro Corr- Damp Pvt. Ltd)

From June 2015 to At Present

Team Size

As per work Requirement

Role & Responsibilities

Site Expense Management, Site Material Arrangement, DPR Of Project, Document Management, Project Time Management, Invoice Preparation & Followup, Solve Client Issues

Site Work Description :

Arrange working material as early as possible to the sites

Manpower and Vehicles arrangements to the sites.

Plan with respect to Site needs and work Urgency, regular monitoring of progress and lag of project.

Manage and maintain the cost of Project within the estimated amount of project.

Regular check up carried out by visiting sites directly

Inspecting Installation of Oil & Gas Pipeline Protection Equipments like Surge Diverter, Polarization Cell, GIRK Cell, TLP’s

Inspection Carried out by TCP Testing & Commissioning, ICCP Testing,Commissioning, Monitoring & Maintenance works

Project works carried out by means of installing TLP’S.

After completion of Project regular Monitoring & Maintenance works carried by inspecting TLP Monitoring & Maintenance, Transformer Rectifier Unit Monitoring & Maintenance, Anode Bed Monitoring & Maintenance, CTSU Monitoring, ER Probe Monitoring

To find the health of pipeline Conducting some of the surveys are carried out,

Which are named it as

oCasing Survey, CIPL Survey, DCVG Survey.

DPR Preparation and Site Expense Management.

Invoice preparation For Finished Work Assignment

Satisfy the Client with reliable and safety electrical works.

Work Responsibilities:

Preparation of bill of quantities(BOQ)

Take of quantities of area (civil, electrical and mechanical works from GFC drawings)

Checking of site inspection reports JMs for various works as per approved construction drawings and site verification works executed by the contractor

Preparation of rate analysis for variation orders.

Preparation of Site Monitoring report as per GSPL Standards.

Preparation of QS Report and Monthly Cash Flow.

Preparations scrutinizing certifying and processing of contractor running and final account bills.

This involves verification of contractor bills with the applicable terms and conditions certification and ensuring compliance to the statutory requirements like Service Tax.

Past Experience -1:

ELECTRICAL PROJECT ENGINEER

Client

Saudi Electricity (SCECO)

Duration

October 2012 to December 2014

Team Size

Above 8 to10

Role

Project Execution

Project Details:

Project: AL DAHRAN -FEEDER LINE POWER TRANSMISSION PROJECT

Excavation & Laying of 11*13.8 KV Parallel cables in a cable trench as per SCECO design,

All Safety Procedure are followed as per Five star safety Standard as per KSA rule

Installation of RMU, Alfanar Transformer, Switchgear panel inside the Feeder Stations.,Site Material arrangements with respect to need

Project: AL-THOQUBA 33/11 KV FEEDER LINE PROJECT, AL-KHOBAR

Excavation & Laying of 11 KV Parallel cables in a cable trench as per SCECO design,

All Safety Procedure are followed as per Five star safety Standard as per KSA rule

Installation of RMU, Al-fanar Transformer, Switchgear panel inside the Feeder Stations., Site Material arrangements with respect to need

Project: AL-HASA, AL-SALMANIYA, AL-HOFUF, AL SANIYA PROJECT

Excavation & Laying of 11 KV, 69 KV single core cables in a cable trench as per SCECO design, All Safety Procedure are followed as per Five star safety Standard as per KSA rule

Excavation & Laying of 13.8 KV,, 4*300 sq mm, 4*185 sq mm, 4*70 sq mm cable in a cable trench as per SCECO design, All Safety Procedure are followed as per Five star safety Standard as per KSA rule

Installation of RMU, Al-fanar Transformer, Minipillar, other power transmission and protection equipments like CB, CT as per SCECO file

Other Projects Handled:

SHUTDOWN PROJECT, EMERGENCY & MAINTENANCE SHUTDOWN PROJECT, OVER HEADLINE PROJECTS, CONSUMER PROJECTS, FEEDER LINE PROJECTS.

Equipments Handled:

MEGGER TESTER, POLE DIRECTION TESTER, CABLE JOINTING KITS, HIGH VOLTAGE TESTER, RMU DIRECTION CHANGER, OVER HEAD POWER TRANSMISSION LINE EQIPMENTS, CABLE PUNCTURING EQUIPMENTS.

Responsibilities:

Electrical Project Execution as per Saudi Electricity board builted design and drawings.

Arrangement of Project needs by Site requirement

Erection of Cable, Transformer, RMU, Electrical Protection Equipments.

Site Coordination with Manpower

Timesheet Management of Site Workers.

Preparation of bill of quantities(BOQ)

Preparation of Site Monitoring report as per SCECO Standards.

Preparation of QS Report and Monthly Cash Flow.

Preparations scrutinizing certifying and processing of contractor running and final account bills.

Problem Solving with Saudi Customers.

Ensure the Project Completion With Time

Past Experience-2:

DESIGN & DEVELOPMENT ENGINEER

Company Name :

Sree Vishnu Magnetics Pvt. Ltd

Years of Experience :

From 2011 to October 2012.

Client:

More Transformer related companies like SALCOMP, GE Healthcare, Nokia, etc

Role & Responsibilities:

Design & Development Engineer

Location

Chennai, TamilNadu.

Project Details:

Project: MAGNET ASSEMBLY Trial Samples

Develop as per US-GE Healthcare design Specification requirement for Medical Equipment Project. Magnetic Field Creating device for Medical Application.

Project: DJIN CUTE HIGH VOLTAGE TRANSFORMER Trial Samples

Design & Develop as per GE Healthcare design Specification requirement for High output voltage transformer.

Project: LOW FREQUENCY AND HIGH FREQUENCY INDUCTOR Trial Samples

Design & Develop as per GE Healthcare design Specification.

Project: TOROIDAL TRANSFORMER

Using Winding Machines build Toroidal Transformers as per customer requirements

Project: DALLAS, TANDEM TRANSFORMER

Design & Develop as per GE Healthcare design Specification requirement for High output voltage transformer.

Make Transformers for Customer need of UL APPROVAL

Work Responsibilities:

The main purpose of this project is "Collecting the electrical and mechanical product details by using sourcing, cleansing and enrichment process.

Preparation of Transformer designs, BOQs, PFC charts, FMEA as per customer requirements and interact with customers.

Preparation of New transformer samples for companies like GE, NOKIA, SALCOMP, SAMSUNG, Testing and Commissioning Transformers up to 10KVA,7KVA,5KVA,50VA,

Documentation of new development samples

Past Experience-3:

SITE INCHARGE

Client

ONGC, GAIL, HPCL, IOCL

Duration

2010 to 2011

Team Size

As per work Requirement

Role

Site Coordinator

Description:

Site checking and analyzing process,

Estimation, Quotation preparation and Documentation.

Preparation of materials for give protection against corrosion,

Communicate with customers and give financial benefits to company,

Employee arrangements for work.

Responsibilities:

Collecting the equipment details.

Linking of Function Location, Equipment Master, Material Master, Bill Of Materials (BOM) & other engineering Drawing Documents as per LSMW Template

Creation of Bill Of Materials (BOM).Core Responsibilities

Production Planning, control and execution

Developing process based on the project specification, process approval steps

Daily Productivity Reporting to the management

Conduct Production Review Meeting on weekly basis, and take appropriate steps towards 100% productivity

INDUSTRIAL TRAININGS:

ARKAY Power Plant, Tamil Nadu, INDIA.

3 months trained at ARKAY Power generation & distribution unit in 2010,

Ramanathapuram.

Government Power Transmission & Distribution in 2011, TamilNadu, INDIA.

3 months trained at Valuthur gas power plant,

Ramanathapuram.

SKILLS SET:

Preparing engineering drawings of Electrical Services and technical specifications.

Performing requirement analysis, Finalising specifications and validating designs.

Providing technical inputs & engineering support to the team from conception to completion of project.

Coordinating techno-commercial activities and drawing specifications.

Managing tendering process from floating bids to awarding contracts.

Managing installation, erection & commissioning of electrical systems.

Languages known

Tamil: Speak, Read, Write.

English: Speak, Read, Write.

Hindi: Speak only.

Arabic: Speak only

Passport Details

Passport Number: J5672108

Date Of Issue: 24-03-2011

Date Of Expiry: 23-03-2021

Declaration

I assure that I can prove very successful and do my best to the advancement and progress of your esteemed organization.

Place: Gujarat Regards,

Date: Thiruselvam M

Electrical - Oil & Gas PipeLine Experience -*8* Years



Contact this candidate