CURRICULUM VITAE
ROHIT KIRAN PEDNEKAR
B.E (Civil), M.Tech, ( Infrastructure Engineering & Management) Kundapura,
Karnataka, India
Email ; ***************@*****.***
Contact ; +919*********
PROFESSIONAL SYNOPSIS
Mr. Rohit Kiran Pednekar, B.E Civil and Post Graduate, M.Tech in Infrastructure Engineering and Management with over 04+ years of experience in construction supervision in BOT as well as in Item rate projects, Project Management, Contract Management and administration, Project Monitoring, repair and rehabilitation, pavement design and design review, materials management, geotechnical investigations and analysis of results, DPR evaluation of highway construction materials, quality assurance. Have a Extensive experience in Highway and Structure and Tunnel projects, Specifically in Piling, substructure and superstructure of Major Bridge in Coastal zone. Interaction with Client and Concessionaire and interest in resolving the issues and construction supervision of highway and bridge projects.
ACADEMIC CHRONICLE
M.Tech in Infrastructure Engineering And Management, SJCIT Chickballapur, V.T.U University Belgaum, Karnataka. Joined in 2016 and completed in june 2018 in First Class with Distinction with 9.08 CGPA
B.E in Civil Engineering, Government Engineering College Karwar, V.T.U University Belgaum, Karnataka, India. Completed in First Class in year 2013 EMPLOYMENT CHRONICLE
1. Junior Engineer in IRB Infrastructure Ltd., from Date 09/09/2014 to 24/09/2016 Cost of project- 2639 cr
2. Site Engineer in Rajesh Shetty Constructions a private firm, from Date 27/07/2013 to 22/08/2014 of project 1.6cr
WORK EXPERIENCE
● Company :IRB Infrastructure Ltd.,
● Period :09/09/2014 – 24/09/2016.
● Position held : Junior Engineer
Project Name: Four Lanning of Goa / Karnataka Border to Kundapur section of NH-17 from Km 93.700 to Km 283.300 in the state of Karnataka under NHDP Phase IV on Design, Build, Operate, Transfer (DBFOT) Toll Basis.
Client : National Highways Authority of India (NHAI) Cost of Project :INR 2639 Crores
Main Project Features:
● Four Lanning of Goa / Karnataka Border to Kundapur section of NH-17 from Km 93.700 to Km 283.300.
● Realignment is about 20 km stretch to avoid existing Geometric deficiencies.
● Twin Tunnel Stretch at chainage 106+150 at Karwar.
● 14 Nos. of major Bridges and 39 Nos. of minor Bridges.
● 2 Nos. of Railway Over Bridges and 1 Nos. of Railway under Bridges.
● 3 Nos. Flyovers at Karwar, Honnavar and Bhatkal. RESPONSIBILITIES
As a Junior Engineer, was responsible for construction execution and supervision, evaluation & construction of the project and coordinate with higher authorities in organization. Also responsible for Project preparation and implementation activities related to my section at karwar for 30kms, checking and review of all the Designs being prepared, ensuring execution of works on site as per specification and standards. Was directly responsible for a Major Bridge construction across Kali river with 770m length having 5 Piers and span of 20m with a balanced cantilever in construction, was responsible from initiation stage to completion stage of bridge with major responsibility of piling over 90 piles and substructure and superstructure work with post stressing of deck slab with box structure, and regulating the construction processes i.e. also worked with starting phase of Tunneling activity in project at Karwar, various roadwork activities and structural works, executing work program methodology ensuring proper traffic management measures and safety norms, approve safety plan, working drawings, mix designs of concrete. monitor and check day to day quality control of works, prepare DPR and billing documents for subcontractors as per the Concession Agreement, Scheduling work for continuous progress of work at site. Provided advise to the contractor on project planning activities. Also responsible for ensuring road safety during construction.
● Company :Rajesh Shetty Constructions
Period :27/07/2013 – 22/08/2014.
Position held : Site Engineer
Project Name : Retail Building at Kundapur town
Cost of Project: 1.6Cr
Responsibilities:
As a site engineer worked in initiation phase of project, where planning and foundation work survey was done, was majorly involved in execution of fundamental excavation work to the foundation work, familiar with concrete work and scheduling the work as per specification and drawings provided, managing site labours, executing and recording daily progress and maintaining DPR for construction, managing billing work with progressive quantity and communicating with senior engineer and architects for change in scope of work, and maintaining safety at work for labour and surrounding site. EXPERIENCE DURING ACADEMIC STUDIES
1. Worked as a intern in Final Semister Project M.Tech with IRB Infrastructure Ltd., from Date 29/12/2017 to 02/06/2018 in a Road Tunnel work. 2. Worked as a intern in Third Semister Internship in Simplex Infrastructure Ltd., from date from 07/08/2017 to 27/11/2017 in Sattva Divinity Residential and Retail Project SOFTWARE SKILLS
Microsoft Project (MSP), Primavera, MS Office, CAD ACADEMIC PROJECT
" Scheduling and Tracking in Construction of Karwar-Kundapur BOT road Tunnel work " STRENGTHS
A quick learner, Self-motivated professional, Insightful, Skilled at balancing and prioritizing multiple tasks to meet the deadlines, and understanding importance of each activities pertaining to work, Team worker and having good communication and managing skill. PERSONAL PROFILE
Name Rohit Kiran Pednekar
Date of birth 24-04-1991
Gender Male
Nationality Indian
Fathers Name Kiran R Pednekar
Mothers Name Harsha K Pednekar
Hobbies Driving, Drawing, Reading, Surfing internet, travelling, stock market investor
Languages known English, Hindi, Kannada, Konkni, Marathi. DECLARATION
I hereby affirm that the information in this document is accurate and true to the best of my knowledge.
(ROHIT KIRAN PEDNEKAR)