Resume

Sign in

jerry Maquidato Timario

Location:
Dubai, Emirate of Dubai, United Arab Emirates
Salary:
4500 aed
Posted:
January 05, 2020

Contact this candidate

Resume:

JERRY MAQUIDATO TIMARIO

** ******* ****** ****** **** 6 South Signal Village Taguig City, Philippines.

Rolla Square Sharjah UAE. ada7uo@r.postjobfree.com

Cellphone No. 0097179525798243

OBJECTIVE: INSTRUMENT/ ELECTRICAL FOREMAN

PROFILE:

More than 18, years of experience in oil and gas industry and power generation projects working as Electrical and Instrument Technician and currently Instrument Electrical Foreman in Oil and Gas Industry, petrochemical, power plant, Oil Refinery, Onshore/Offshore Construction project and plant maintenance in Saudi Arabia United Arab Emirates, Singapore, Iran, Oman and Umm said State Qatar, Philippines.

Familiar of (HVAC) Control system, Heating Ventilation and Air conditioning, from Digital Data Control panel (DDC) is the automated Control of a Condition or process by a Digital Device (computer) DDC takes a Centralized Network- Oriented approach. All instrumentation is gathered by various analog and digital converters which use the network to transport these signal to the central controller to (AHU) Air Handling Unit (HF) humidifier and (ACCU) Air cooled condensing Unit, (CFU) Chemical Filter Unit, Blade Fan, including commissioning of HVAC Power system.

Expertise in fabrication and installation of cable tray, cable ladder, conduit pipes, tubing, installation, equipment panel installation and field instrument device.

Knowledgeable in reading and interpreting electrical/instrument drawing and piping instrument diagram (p and I D)

Familiar in cable pulling, cable gland, cable termination, loop checking, insulation resistant test (meager test), commissioning and functional test of instrument device.

Excellent communicator with good analyzing and problem solving skills.

Carry out day today plant preventive maintenance, test and clean plant equipment and instrument devices including trouble shooting, repair and Overhaul of control valve, and other instrument devices such as pressure, level, temperature, flow transmitters.

Familiar in oil and gas and power plant process control and monitoring system such as DCS, PLC, SCADA, VFD, RTU, FIRE and Gas system or FDAS, PAGA, CCTV, IMMS, Well Head Hydraulic Control system, Iron Raugthneck, Koomey Unit, BOP- Blow out Preventer Control System, HCR Valve - Hydraulic Control Remote, Choke and Kill manifold.

ACHIEVEMENTS:

EHS Award in Recognition Towards his Contribution in maintaining High Standard and Safety Performance (ENOC) DUBAI United Arab Emirates

Basic First Aid awareness M.I.S. HSE Department

DPC Safety Orientation M.I.S. HSE Department

Firefighting training M.I.S. HSE Department

Fall Protection Training M.I.S. HSE Department

Confined space entry standard M.I.S HSE Department

Swing rope training M.I.S. HSE Department

Helicopter Under water Escape Training (HUET), sea survival training Gulf technical and safety training center (G,T.S.C Abu Dhabi United Arab Emirates.

Certificate of Competency in General Fitting-Institute of technical education, Singapore, 21 Shipyard Road Jurong Island Singapore.

Total Quality Management (T.Q.M) E.E.I. Chiyoda, Umm said State of Qatar

Completed Industrial Electricity and Building wiring Course at TESDA/NMYC

(National Manpower and Youth Council) BUHISAN TIBUNGCO DAVAO CITY, PHIL.

PERSONAL IMFORMATION:

NAME : Jerry M. Timario

POSITION : Electrical/ Instrument Foreman

Status : Married

Date of Birth : May 15, 1975

SEX : Male

NATIONALITY : Filipino

RELIGION : Roman Catholic

HOME ADDRESS : 15 General Espino Street Zone 6 South

Signal Village Taguig City Philippines

CURRENT ADDRESS : Rolla Square, Sharjah U A E

PASSPORT NUMBER : P7495931A

MOBILE NUMBER : 009***********

E-MAIL ADDRESS : ada7uo@r.postjobfree.com

Visa Status : Visit up to December 31 2019.

EDUCATION:

VOCATIONAL COURSE:

INDUSTRIAL ELECTRICITY June-1995-1996

(TESDA/NM BUHISAN TIBUNGCO, Davao CITY, PHILIPPINES

SECONDARY LEVEL:

Surigao del Sur Polytechnic College June 1990-1995

Tagbina Surigao del Sur, Philippines

ELEMENTARY LEVEL:

Maglatab Elementary School June 1982-1990

Maglatab,Tagbina Surigao del Sur

WORK HISTORY:

ELECTRICAL/INSTRUMENT FOREMAN: April 20, 2019- up to present

COMPANY: KENTZ, SNC Lavalin Al Khobar, Saudi Arabia

CLIENT: Aramco, Ras Tanura

PROJECT: Ras Tanura Oil Refinery, Plant 15 Asphalt Expansion Facilities

DURATION: April 20, 2019 up to Project Completion

ELECTICAL/INSTRUMENT FOREMAN October 27, 2018- April 19, 2019

COMPANY: KENTZ, SNC Lavalin Al Khobar, Saudi Arabia

CLIENT: Saudi Aramco/ Tecnicas Reunidas

PROJECT: Fadhili Gas Program Project

DURATION: October 27, 2018-April 19, 2019

ELECTRICAL/ INSTRUMENT FOREMAN: Sept. 2007- To 30 April 2018

COMPANY: Maritime Industrial Services Company Ltd /LAMPRELL Group Dubai U.A.E.

CLIENT: Emirates Horizon Jebel Ali Petroleum Terminal LTD (ENOC GROUP) Jet A1

PROJECT: D Punch List Project and PLC Integration from Control Room to Low Voltage-

Substation (LVSB), High Voltages Substation (HVSB), Ring Main Unit (RMU).

DURATION: April 10, 2016 to February 15, 2018, Jebel Ali Free Zone Dubai U.A.E.

CLIENT: Emirates Horizon Jebel Ali Terminal Limited (ENOC GROUP) PETRO Chemical

Storage Terminal 1 and Terminal 2, Jebel Ali Free zone Dubai UAE.

PROJECT: Replacement of none UL registered Fire Water Pump Engine Unit,

Polyol Project, Variable Frequency Drive (VFD), Pump Motor, Instrument Devices.

DURATION: November 04 2015 to April 30 2016.

CLIENT: Seadrill Petroleum Industry, Deepwater Drilling Contractor

DURATION: August 01, 2015 to November 03. 2015, MIS Sharjah Marine Yard.

PROJECT: Rig refurbishment, Jack up Drilling Rig, MIS Yard, Khalid Sea Port Sharjah UAE

CLIENT: Leighton Petroleum Limited, Oil and Gas Company

PROJECT: Wellhead Platform and Production Platform, for Iraq Offshore Project

DURATION: August 11, 2014 to July 31, 2015, MIS Yard Khalid Sea Port Sharjah UAE.

CLIENT: Dubai Petroleum (DP) Offshore/ TECHNIP OIL and Gas Company

PROJECT: Wellhead Platform and Production Platform (JALILAH OIL FIELD).

DURATION: 11, 2014 to 31, 2015, Onshore Offshore Project, MIS Yard Sharjah UAE.

CLIENT: ENSCO 54 Jack up Drilling Rig, Onshore Project.

PROJECT: Rig Refurbishment, LAMPRELL Yard Khalid Sea Port Sharjah UAE.

DURATION: April 30, 2014 to July 11, 2014, Onshore Project

CLIENT: KAR GROUP Kurdistan Iraq Oil Company, for Iraq Project.

PROJECT: Plant Dismantle of Gulf Refining Company N.V, Jebel Ali Free Zone Dubai UAE.

DURATION: September 20, 2013 to April 29, 2014.

CLIENT: Total oil and Gas Company, Petrofac Oil and Gas Company.

PROJECT: Process Module LAGGAN TORMORE, LAMPRELL Yard Jebel Ali Free Zone Dubai

DURATION: September 19, 2013 to July 10, 2013 onshore project, for NORTH SEA

CLIENT: NEXEN PETROLEUM UK LIMITED, North Sea Offshore UK.

PROJECT: Wellhead Platform, Process Utility Platform and Leaving Quarter Facility.

DURATION: September 18, 2013 to December 01, 2012, LAMPRELL Yard Jebel Ali FZN.

CLIENT: CONOCO PHILIPS JASMINE GREENFIELD development project NORTH SEA

PROJECT: JASMINE LEAVING QUARTER FACILITY, Onshore LAMPRELL Yard Jebel Ali FZN

DURATION: March 17, 2012 to November 30, 2012, ONSHORE Project.

CLIENT: PETROLEUM DEVELOPMENT OF OMAN (PDO), for Oman project.

PROJECT: Process Module, oil and gas separator, MIS Yard Khalid Sea Port, Sharjah UAE.

DURATION: March 16, 2012 to March 06, 2011

CLIENT: NATIONAL DRILLING COMPANY (NDC) ABU DHABI United Arab Emirates.

PROJECT: AL BZOOM Rig Reactivation Project, Jack up Drilling Rig, Onshore Project.

DURATION: March 06, 2011 to December 30, 2011, MIS Marine Yard, Sharjah UAE.

CLIENT: MENADRILL 1 AND 2, SUPER M2, NOBLE DENTON, Sharjah Marine Yard UAE.

PROJECT: NEW BUILD RIG, Jack up Drilling Rig 109,110, MIS Yard Khalid Sea Port Sharjah.

DURATION: February 01, 2010 to March 30, to 2011, Onshore MIS Marine Yard, Sharjah.

CLIENT: KS ENERGY SERVICES, KSAM 2 PETRODRILL OFFSHORE

PROJECT: NEWBUILD RIG JACKUP KS ENDEABOR (Hull 107), Khalid Sea Port Sharjah UAE.

DURATION: January 15, 2009 to May 20, 2010, MIS Sharjah Marine Yard.

CLIENT: MOSVOLD Middle East Jack up LTD

PROJECT: NEWBUILD Jack up Drilling Rig, HAFFAR 1, Hull 106, Super M2.

DURATION: January 02, 2008 to March 20, 2009, MIS Sharjah Marine Yard, UAE.

CLIENT: ONWNER PEMSA. MODU SPEC CONSULTANT, RIG HAFFAR 2. (HULL 108)

PROJECT: NEW BUILD RIG JACK UP SUPPER M2, KHALID SEA PORT SHARJAH U.A.E.

DURAION: FEBRUARY 10, 2008 TO MAY 25, 2009, MIS SHARJAH MARINE YARD

CLIENT: MOSVOLD MEDDLE EAST JACK UP LIMITED, SEAWOLF OILFIELD SERVICES LTD.

PROJECT: New Build Rig ONOME, Jack up Drilling Rig Super M2, MSV 104, MSV, 105.

DURATION: September 03, 2007 to November 30, 2008, MIS Sharjah Marine Yard.

Coordinating all the Electrical and instrument work program and ensure the instruction regarding all works and specification are conveyed to the Electrical and instrument operators or Technician.

Coordinate work program with production controls.

Request work permit to ensure all activities and the task monitor by client applicable lock out, tag out system.

Follow the safety standard procedure during the task and site implementation.

Identify the hazardous in the work area and report immediately to the safety Department to take action Immediately.

Coordinate with the process operators during the task to avoid conflict on the system.

Taking responsibilities during the sift duties.

Maintain daily production report and constraint to the construction manager.

Ensure all works are completed to the standard specification before final inspection.

Ensure all safety requirements regarding all the jobs to be followed.

Preparation of materials for new correction / installation jobs, And Drawing

Estimation of manpower and manpower distribution as per site work load.

Preparation of test equipment and tools such as multi meter, insulation resistance test or megger, smart field communicator model STS 103 for Honeywell, and hart communicator, model no: 475 Emerson, Rosemount, milliamp calibrator model 707 fluke, pneumatic calibrator Model 700HPP Fluke, Resistance temperature devices -(RTD) or Simulator, Model OS- 260 and OS- 270.

Ensure all the workers must be follow to the safety procedures and regulation.

Follow HSE (health Safety and Environmental Policy), Stop work immediately if the site unsafe condition.

Supervised and instruct of E/I personnel daily on site activities such as fabrication, installation of cable tray, and supports, Installation of Electrical Equipment and instrument devices such as Level, Temperature, pressure, Flow transmitter, pressure Gauges, DCS, PLC marshalling cabinet, Switch gear, MCC panel, Transformers, main Distribution Board (MDB / SDB) Low voltages, High voltages Equipment.

Ensure the works are completed at high standard within agreed time frame.

Assist the supervisor, engineering department, and quality control department regarding the quality aspects.

Assist the supervisor conduct safety incidence investigation and conduct proactive efforts to reduce/eliminate incidents.

Support the supervisor with visual safety leadership on the construction site and workshop Floor to oversee the safety guidelines and standard operating procedures

Work closely with surface construction and maintenance foreman to manage the personnel materials, and equipment maintenance plan by priority.

To demonstrate personal commitment in regards to safety and environmental practices, potential hazards and action that is appropriately taken.

To provide Training the personnel in any Instrument/electrical and mechanical functions with which they are unfamiliar.

Conduct daily tool box meeting regarding HSE policies, and safety procedures and work priorities

INSTRUMENT TECHNICIAN: August 2002- September 2007

COMPANY: Maritime Industrial Services Company LTD. Sharjah United Arab Emirates.

CLIENT: British Petroleum, Air BP Aviation Fuel, HAMRIYAH FREE ZONE, SHARJAH UAE.

PROJECT: Jet Fuel Storage Tank, and Pipeline to Sharjah Airport, HZN, Sharjah U.A.E.

DURATION: October 02, 2006, to September 02, 2007, HAMRIYAH FREE ZONE SHARJAH.

CLIENT: SAIPEM S.P.A Oil and Gas Industry, Khalid Sea port Sharjah, United Arab Emirat.

PROJECT: Perro Negro 4 Rig Refurbishment, Marine Yard, Sharjah United Arab Emirates

DURATION: October01, 2005 to October 01, 2006, Khalid Sea Port Sharjah U.A.E.

CLIENT: DUBAI NUTURAL GAS (DUGAS), Jebel Ali Free Zone Dubai United Arab Emirates.

PROJECT: Plant Maintenance and Plant Shutdown, Methyl Tertiary Butyl Ether, (MTBE)-

Plant, Gas Plant 1 including Jetty Loading Arm area, Manpower Supply.

DURATION: January 08, 2004 to August 25, 2005 Gate#1,2 Jebel Ali DUBAI U.A.E.

CLIENT: NATIONAL DRILLING COMPANY (NDC) Abu Dhabi United Arab Emirates.

PROJECT: AL ETIHAD Rig Refurbishment Jack up Drilling rig, Marine Yard Sharjah UAE.

DURATION: November 06, 2003 to January 05, 2004, MIS Khalid Sea Port Sharjah U.A.E.

CLIENT: MARGHAM DUBAI ESTABLISHMENT, Dubai Supply Authority, HATTA RD DUBAI.

PROJECT: Inlet Compression Project, HATTA RD MARGHAM GAS PLANT DUBAI U.A.E.

DURATION: April 20, 2003, to November 07, 2003

CLIENT: OMAN LNG, Liquefied Natural gas, QALHAT COMPLEX P.O.BOX 888 SUR, PC.

PROJECT: OMAN LNG, Train 1, and 2, Shutdown and Modification of Instrument Control

DURATION: MARCH 16, 2003 TO APRIL 19, 2003, Qalhat Complex Sur, Sultanate Oman

CLIENT: SINGLE BOUY MOORING (SBM), EXXON MOBIL, DUBAI DRY DUCK, U.A.E.

PROJECT: FLOATING PRODUCTION STORAGE OFFLOADING (FPSO) XICOMBA, DUBAI.

DURATION: APRIL 20, 2003 TO AUGUST 02, 2003, DUBAI DRY DUCK U.A.E

CLIENT: ANADARKO PETROLEUM CORPORATION, US Based Company

PROJECT: Oil and Gas Production Platform, Process and Leaving Quarter Facility.

DURATION: August 03, 2002, to March 21, 2003 Jebel Ali Free Zone Dubai U.A.E.

COMPANY: Plant Engineering Construction PTE, LTD, (PEC) 21 Shipyard Road Singapore,

CLIENT: EXXON MOBILCHEMICAL, Singapore chemical Complex Jurong Island Singapore

PROJECT: Singapore Olefins Project (SOP) Singapore Chemical Complex, Jurong Island.

DURATION: February 24, 2000, April 04, 2001, 21 shipyard Road Singapore 628144.

COMPANY: EEI CORPORATION, UMSAID STATE OF QATAR.

CLIENT: DARWISH CHIYODA KEISO LIMITED, DOHA STATE OF QATAR.

PROJECT: QATAR FUEL ADDITIVES COMPANY LTD (QAPAC), Umm said State Of Qatar.

DURATION: JUNE 30, 1998 TO APRIL 04, 1999, UMSAID STATE OF QATAR.

COMPANY: EEI CORPORATION, 12 MANGGAHAN BAGUMBAYAN QUEZON CITY PHIL.

CLIENT: DEPARTMENT OF TOURISM, RIZAL PARK MANILA PHILIPPINES.

PROJECT: NATIONAL MUSEUM, LUNITA PARK MANILA PHILIPPINES.

DURATION: MAY 31, 1998 TO JUNE 28, 1998, LUNITA PARK MANILA PHILIPPINES.

COMPANY: EEI CORPORATION, 12 MANGGAHAN BAGUMBAYAN QUEZON CITY PHIL.

CLIENT: PETRON BATAAN REFINERY, DAELIM PHILIPPINES CONSULTANT.

PROJECT: REHABILITATION OF PETRON BATAAN REFINERY, LIMAY BATAAN PHILIPPINES.

DURATION: MAY 20, 1997 TO MAY 30, 1998, PETRON LIMAY BATAAN PHILIPPIN

COMPANY: EEI CORPORATION, 12 MANGGAHAN BAGUMBAYAN QUEZON CITY, PHIL.

CLIENT: MITSUBISHI HEAVY INDUSTRY, 25TH FLOOR YUCHENGCO TOWER, RCBC PLAZA.

PROJECT: NATIONAL POWER CORPORATION PROJECT, BANI MASINLOC SAMBALEZ, PHI.

DURATION: JUNE 15, 1996 TO MAY 18, 1997, BANI MASINLOC SAMBALEZ PHILIPPINES.

Fabrication and installation of support, cable tray, cable ladder, conduit pipes with

Fittings, tubing installation such as pneumatic line, hydraulic line, impulse line for flow transmitter, Liquid Flow, Gas flow, Pressure, Vapour Flow.

Installation of instrument devices such as pressure, temperature, level, flow transmitters, pressure gauge, temperature gauge, level gauge, thermocouple, and-

flow elements, flow switch, level switch, pressure switch, vibration switch.

Installation of fire and gas system, public address and general alarm system (PAGA), closed circuit television (CCTV camera), emergency shutdown system (ESD), bulk control system, installation of equipment panel such as (DCS), (PLC), (SCADA), (PCS), (MCC)panel and switch gear Low, Medium, High voltages Equipment.

Cable pulling, cable gland, cable termination, loop checking, insulation resistances test (meager test) power cable low medium, high cable, control cable, signal cable.

Pressure Test of tubing and hoses for pneumatic and hydraulic, control system.

Commissioning and Functional Test of Instrument Devices, such as Flow, Level, Temperature, Pressure Transmitter, vibration switch, public address and general alarm system, emergency shut down system (ESD), fire and gas system, stroke check of pneumatic control valves.

Carry out day to day preventive, corrective maintenance and trouble Shooting –Activities

INSTRUMENT/ ELECTRICAL FITTER: February-2000-2001

COMPANY: Plant Engineering Construction PTE.LTD, 21 Shipyard Road Singapore 628144

CLIENT: EXXON MOBIL CHEMICAL, SINGSPORE CHEMICAL COMPLEX, JURONG ISLAND.

PROJECT: SINGAPORE OLEPIN PROJECT (S.O.P.) Singapore Chemical Complex.

Fabrication of cable tray and support, Installation of cable tray and Conduit pipes.

Lay – out the work area for Installation of transformer low, medium and high voltage, switch gear, low, medium, high voltage.

Cable pulling, cable gland, cable termination of Low, Medium, high voltage cable.

Loop checking of control cables and power cables.

Insulation resistance test (meager)Control Cable, Low, medium, High Voltage Cable.

Operate tools and machinery to assign repair work.

Communicate to operation employee, supervisor and others regarding the identification of problem and completion of jobs in their area both verbally and written.

I am willing to undergo training to be qualified perform successfully in jobs

Read and comprehend vendor literature including but not limited to installation, operation and maintenance manual and part list.

Employ new knowledge of applicable electrical standard and codes in carrying out work assignments.

I am willing to comply safety policies, procedures of work systems and initiatives.

Assembly and disassembly of mechanical parts, electrical parts, electronic printed circuit board during replace of damage parts.

I hereby declare that the information above-written are true and correct to the best of my knowledge and belief.

JERRY M. TIMARIO

Instrument/ Electrical Foreman



Contact this candidate