Post Job Free

Resume

Sign in

Project Director

Location:
Ismailia, Ismailia Governorate, Egypt
Posted:
January 04, 2020

Contact this candidate

Resume:

GENERAL MANAGER & PROJECT DIRECTOR

MASTER DEGREE IN CIVIL ENGINEERING

PROJECT MANAGEMENT / GEOTECHNICAL &

STRUCTURAL ENGINEERING

KHALED MAHMOUD

ada7hx@r.postjobfree.com

+201********* & +201*********

NAME Khaled Mahmoud

NATIONALITY Canadian

POSITION Project Director

EDUCATION

1999

M Sc. Civil Engineering

Civil Engineering Suez Canal University Port Said, Egypt 1985 – 1990

B Sc. Civil Engineering

Suez Canal University, Port Said, Egypt

• Proven team leader, creative, able to apply new methods in both design and site application HIGHLIGHTS OF EXPERIENCES

• Possesses the expert knowledge to identify opportunities for change and the ability to convey the need for change

• Able to manage Mega projects and Ultra Huge projects, dedicated professional attitude, committed to get job done within time limits, gained trust of clients, effective negotiator and decision maker

• Build and convey expert knowledge in our industry to the team for gaining the best quality and cost.

• Sought and built effective personal relationships and network within the team, external consultant, vendors and contractors thereby contributing towards achieving organizational and team success. EXPERIENCE RECORD

2014 till Now

Developer and consultant office owner (Emar) (Ismailia- Egypt)

• Managing my complex projects within established budgets and regularly monitoring the success of sequential project steps and tasks; introducing appropriate interventions or activities to keep timeline, quality, and deliverables on track.

General Manager

• Managing team productivity through the development and maintenance to ensure ongoing projects for full associate resource utilization, including prioritizing work and demonstrating effective delegation of project tasks.

• Demonstrating technical/functional mastery of the skills necessary to effectively complete a project.

• Drafting successful client proposals, comprehensive work plans, presentations and reports to address client needs. Overseeing the development of project deliverables by more junior associates, reviewing for technical accuracy, quality and completeness

• Supervise all the construction works with due diligence and efficiency which are executed in accordance with technical administration, financial and economic practices.

• Approve all materials proposed and used by the Contractor in the Works conduct-all necessary and advisable inspection, sampling and testing

• Build marketing programs to support specific marketing objectives across different channels and segments in support of our overall strategic marketing plan to comply our cash flow demands.

• Develop business cases for marketing programs at the proposal stage and make recommendations on marketing tactics

Major Projects:

• DURAH & Zamzam towers (12 million US $)

Revise the project execution and adjust the running works towards the best situation, and troubleshooting the raising issues related to design, execution and handing over to clients

• New Garden City Towers (6 tower G+11) (40 million US $)

• Follow up the design phases from the concept till the final design of the structural and infrastructure utilities for the project.

• Monitor the timescale and the cost of the whole project to be in the limits of the client demands and check the cash flow to keep the work momentum to reach the client target. General Manager & Project Director ada7hx@r.postjobfree.com +201********* & +201*********

2

2010 – 2013

TANWEEN– (DOHA- QATAR)

• The role of the Engineer in FIDIC and his representatives (Tanween, Aecom and QPM) is to supervise construction works,on behalf of the Employer, throughout the entire construction and Defects Liability period, to ensure the works are constructed: In accordance with General and Special Conditions, of Contract, Technical Specifications and Engineering Drawings. THE ENGINEER

• Review the survey, plans and proposals for the relocation of services if affected by the proposed work of existing utility services and liaise closely with authorities concerned on the proposed relocation of such services within the Right of way is carried out.

• Organize the supervision of the contract works with proper allocation of responsibilities to individual members of the team and supervise their work will be effectively executed.

• Prepare any design changes to suit field conditions during construction or changes required to reduce construction costs, without sacrificing strength or quality of the work.

• Approve all materials in the vendor list or proposed by the Contractor and used in the Works conduct-all necessary and advisable inspection, sampling, testing and analysis for compliance with the Technical Specifications in situ and in the laboratory.

• Prepare Engineer's instructions (EI) and Variation Orders (VO), complete with the associated measurement and payment instructions. Issue such EI's and VO's to the Contractor in writing - whilst advising the Employer of such EI's and VO's and of the associated implications.

• Keep and maintain up-to-date Daily Site Log Book and records making them available for inspection when requested for all correspondence and data; all work stoppages or delays.

• Review the Contractor's proposed work programs and associated working method statements, resource analysis and requirements in relation to the required progress.

• Review and analyze all the Contractor's applications for extensions of time or claims for additional payment and furnish the Employer with the Engineer's detailed analysis of such applications and recommended rulings and, subject to the Employer's approval where necessary, advise the Contractor accordingly.

• Review the Contractor's Payment Applications after verifying the accuracy of the measurement and costing calculations and the supporting documentation, prepare and issue interim payment certificates. Monitor the payment process and alert the Employer when delays lead to interest charges will become due or will be in Default for delayed payment.

• Check and verify in a regular basis the validity of all insurances/guarantees and proof of payment, check that the contractor follows safe working practices in all operations

• In the event of adjudication or arbitration, provide the necessary personnel and expertise to advise and assist the Employer in any such process and prepare any further analysis of the Contractors claims submissions as may be necessary to assist in the presentation of his case.

• Submit progress reports, special report,to fully acquaint the Employer, with all aspects to affect the Technical and Financial implementation of the project and other hard outputs regarding construction progress and the status of the Works Contract and the consulting services.

• Review, approve and submit two full sets of as-built drawings within two months of completion of the Works (including photos and video camera).

• Introduce Staff mobilization and demobilization plans with technical proposal and related financial proposal during The Defects Liability Period and will be handed-over as work progresses, Prepare and submit the Draft Completion Report, within one month from the commencement of the period. Inspect the works preparation of a final deficiency list if required, supervise, the remedial works and recommend to the Employer on the proposed date of the final inspection of the works after the end of Defects Liability Period.

• Ensure that all materials, tools: equipment, facilities, etc; which have to be handed over to the client after completion of the works are in usable and required standards properly dismantled, packed, stored and maintained until the official handing over to the client-Furthermore. Carry out the final inspection of the Works with the Contractor and the Employer's representative. Prepare the "Final Completion Certificate" and submit the Final Completion Report.. Major Projects:

• Barwa Commercial Avenue (3000 million US $)

Barwa commercial Avenue is a mega-sized mixed-use development of residential, commercial and offices set to become Qatar's new lifestyle destination and offer all business activities as 460 apartments, 475 showrooms, 630 offices and a four levels shopping mall with leasable area of 56600 m2.

General Manager & Project Director ada7hx@r.postjobfree.com +201********* & +201*********

3

2008– 2010

Nakheel – WF & PJA – (Dubai- UAE)

• Managed and organized civil construction project operations and personnel; involved in strategic plan development, forecasting and program implementation. Senior Construction Manager

• Supervised cost effective completion of project activities. Delivered outputs to the highest possible standard and displayed concern for all areas involved.

• Sought and built effective personal relationships and networked within the team and with external consultant, vendors, contractors thereby contributing towards achieving organizational and team success.

• Drafting successful client proposals, comprehensive work plan, presentations and reports to address client needs. Overseeing the development of project deliverables by more junior associates, reviewing for technical accuracy, quality and completeness

• Supervise all the construction works with due diligence and efficiency which are executed in accordance with technical administration, financial and economic practices.

• Approve all materials proposed and used by the Contractor in the Works conduct-all necessary and advisable inspection, sampling and testing

• Review marketing programs to support specific marketing objectives across different channels and segments in support of our strategic marketing plan to comply with our cash flow demands. Major Projects:

• Madinat Al Arab – Badrah District (Phase 1 & 3) (600 million US $)

• Madinat Al Arab –Veneto Precincts (774 Luxury Villas) (950 million US $)

• Badrah Gate Tower (Twins tower G+32) (250 million US $) (postponed) Following up and revise the projects execution and assure to keep company advised of project status and adjusted towards the best situation, and troubleshooting the raising issues related to execution and design. Monitor the timescale and the cost of the whole projects to be in the limits of our company demands.

2007 - 2008

BLAIR & ANDERSON – (ABU DHABI- UAE)

• Participates in assessments and prioritization of construction, rehabilitation and remodeling projects under consideration.

Projects Manager

• Coordinates construction projects, prepares change orders, monitors project compliance and schedule.

• Coordinates development of request for proposals for space acquisition including lease and alterations needed to meet the needs of tenants and the client.

• Manages to and achieves revenue goals set for projects.

• Assists in the evaluation and redesign seeking value engineering session. Possesses a thorough understanding of our service offerings, technical preferences, and technical direction. Major Projects:

• Mussafah Mall Project (250 million US $)

Follow up and revise the project execution and assure to keep the client and company advised of project status and adjusted towards the best situation, and troubleshooting the raising issues related to execution and design.

• Capital plaza Development (Complex Towers) (350 million US $) Follow up the re-design modification in structural and geotechnical during the execution phase of the project

• Al-Hail Free industrial Zone (Phase 1&2&3 and 4) (250 million US $) Follow up the design phase of the landscaping, utilities and infrastructures. General Manager & Project Director ada7hx@r.postjobfree.com +201********* & +201*********

4

2004 – 2006

Al Waseelah Development Projects - Kuwait

• Review & Preparation of Technical Studies for different Project, project construction cost & Budgets and Structural designs & coordination with different design disciplines Project Manager

• Monitor cost and timescales, Organize and chair regular meetings with project team and provide client with regular progress reports, site safety & QA/QC plans.

• Prepares for engagement reviews and quality assurance procedures.

• Manage day-to-day client interaction. Set and manage client expectations. Major Projects:

• AL Wassela Handicraft & small industries Complex (200 million US $) Follow up the total project and coordinate between different contractors as owner representative and Claim Administration. Review & coordination of Tender documents Major Projects (B.O.T) tenders:

• Subhan Industrial Zone BOT Project (30 million US $)- The project includes the complete development of infrastructure for 1,000,000 m2 in Subhan Area and the Master planning for Industrial Plots. (B.O.T. Studies)

• Al Rai Truck Logistics Park, BOT Project (25 million US $) The project includes the complete infrastructure development, Truck Service & rest buildings along with commercial areas on a 158,000 m2 plot in Al Rai Area. (B.O.T. Studies) 2000 – 2004

Haddad & Morgan Windsor, Canada

• Responsible for geotechnical studies and structural designs for a number of different projects Structural & Geotechnical Designer

• On-site inspection for different projects (foundations, piles, dewatering and structural details) Major Projects:

• Ford Public Building - The project includes two basement floor for parking area, and 20 floors building with two mezzanine floors as mall and Movie Center.

• Upgrade 401 highway – The project includes upgrade the embankments of all intersections and slopes and the right of way through Windsor Area. 2000 - 2004

University of Windsor - Windsor, Canada

• Teacher assistant for many courses:

Research Assistant (PHD in Engineering) & Teacher assistant –Civil Engineering Department

• Soil mechanics/ Steel Design / Static & deformable bodies / Management

• Responsible for a research on bridges and the development of methods to improve the design of cable suspended bridges using new dampers for construction and modifications in the cables.

1986 – 1999

Arab Contractors Co. – Egypt

1995 - 1999

• Monitors Sub-contractors at each stage of the work to ensure proper compliance with all technical aspects of the contract through both individual contacts and co-ordination meetings. Project Manager

• Recommend policies, procedures, and techniques to improve cost estimating functions.

• Cost estimating, Bid evaluations and negotiations for all the subcontractors. Supervise and coordinate the preparation of conceptual, control and definitive estimates for the use in architectural and engineering designs for major projects. 1994 - 1995

• Review contractual documents and contract modifications to determine scope of work and changes. Develop cost and schedule monitoring system for the updating of the projects. Deputy Contracts manager

• Check and authorize all claims for payment from all Sub-contractors involved in the projects to assure accuracy and that proper contractual obligations are met. General Manager & Project Director ada7hx@r.postjobfree.com +201********* & +201*********

5

1993 -1994

• Geotechnical primary studies. Designed and installed several dewatering systems for many projects. Modify soil bearing capacity using grids and dynamic methods Geotechnical Engineer

• Execute 8 tunnels using 3 types of TBM machine with pipe jacking system and bolted segments

• Evaluate Quality Control studies for soil specifications, testing materials and on-site inspection 1992 -1993

Technical and Planner Engineer

• Prepare technical specifications and scope of work descriptions. Prepare Request for Proposal

(RFP) documents with design concepts. Prepare programs, schedules and updates using P3. Analyze bid information to be agreed with timescale.

• 1990 -1992

• Perform field inspections and provide field support as necessary during construction phases. Prepare interface layouts and conflict solutions; shop drawing for steel and shuttering details; technical correspondence, reports, studies and quantities survey; man-hour estimates and material takeoffs. Studying and understanding all documents and project conditions . Site Engineer

Major Projects:

The International Coastal Highway (50 million US $)

• Establish an international road through a big lake including all back-filling works and two steel bridges with 36.0 m main span. Prefabricate different kinds of piles as (bored, driving, secant and pre-cast piles)

Dreamland Park (35 million US $)

• Provide design support and observe an artificial mountain with inner tunnels, outer canals and falls using soil reinforcement walls and slopes faced with sand bag & curbs with drainage control system.

AL- Mostaqbal Infrastructure project (25 million US $)

• Mined eight non-disruptive under crossing projects (using pipe jacking and bolted segment tunnels) under roads, canals and railways. Soil injection using nitrogen.

• Gravity sewage pipeline project with ID 2500 mm at depth 11.0 m and pump station with ID 18.00 m.

Manar Tower ( 9 million US $)

• High rise building consist of 25 floors and the pile foundation studies & fabrication U of Cairo – African Studies Institute (15 m US $)

• Construct three buildings inside Cairo University. Erect two 90 m towers using Slip form Shuttering system.

1986-1990

• Development of Marine ships Terminal. Driving sheet piles and tie backs. Perform survey works Site Engineer (Internship)

• New Cairo Airport. Runway construction & extension of existing Taxiways Using fiber concrete. LANGUAGES

Arabic: Mother Tongue

English: Fluent (Speaking, Reading and writing)

Computer Skills

Design and develop complete software “EL–Sabrien” for designing walls and railway bridges using soil reinforcement. Develop software for designing 3D lanes and intersection for ITS Program. Primavera 3.0 & 6.0, -- Several structural analysis & design software's & AutoCAD (2D, 3D) & Extensive Knowledge of Microsoft Office (Word / Excel / PowerPoint).



Contact this candidate