Resume

Sign in

Assistant Electrician

Location:
South Africa
Salary:
25000
Posted:
January 02, 2020

Contact this candidate

Resume:

CURRICULUM VITAE

OF

RIVELE XITSUNDZUXO WELSH

*.PERSONAL DETAILS

SURNAME : RIVELE

FIRST NAMES : XITSUNDZUXO WELSH

DATE OF BIRTH : 1989-08-20

IDENTITY NUMBER : 890**********

ADDRESS : *** ****** STREET

OLIEVENHOUTBOSCH EXT 37

CENTURION

0175

LANGUAGES : XITSONGA

: ENGLISH

: SEPEDI

DRIVER’S LICENCE : CODE 10 WITH PrDP

CONTACT NUMBER : 078*******/079*******

ALTARNATIVE NUMBER : 078*******(FATHER)

EMAIL ADDRESS : ada6vp@r.postjobfree.com

NATIONALITY : SOUTH AFRICAN

2.EDUCATIONAL QUALIFICATIONS

HIGH SCHOOL ATTENDED : CHAMANDU HIGH SCHOOL

HIGHEST GRADE PASSED : GRADE 12

SUBJECTS PASSED : SEE ATTACHED

YEAR PASSED : 2010

NAME OF INSTITUTION : TSHWANE SOUTH FET COLLEGE

COURSE : ELECTRICAL ENGINEERING

LEVEL : NATIONAL N DIPLOMA & TRADE TEST (SEE ATTACHED)

YEAR COMPLETE : 2017

3.WORK EXPERIENCE

3.1 NAME OF COMPANY : CITY OF TSHWANE

NAME OF DEPARTMENT : ELECTRICITY DIVISION

POSITION : ARTISAN IN TRAINING

DURATION : 01/11/2015 TO 01/11/2017

3.2 DUTIES

3.2.1. JOINING AND LAYING CABLES OF LV AND MV CABLES

HT cables size (70mm2, 150mm2 ) three core

Installation of LT cables (16mm2,25mm2, 35mm2)four core and three core

Installation of concentric cable (air deck 10mm2 and 16mm2)

Installation of termination and End joint cables

Inspection and maintenance of substation and mini substation

Inspection and maintenance of RM6 and ODS (outdoor substation)

3.2.2. REPAIR AND MAINTANANCE OF STREETLIGHT

Installation of streetlight

Replacement of bulbs and luminaires of head fitting

Installation of day-night switches (70W and 250W0)

3.2.3. NEW INSTALLATION AND MAINTANANCE OF METERS (SINGLE PHASE AND 3 PHASE METER AND MAXIMUM DEMAND))

Installation of ready board to consumers

Installation of pole boxes meters (3 ways, 6 ways,12 ways)

Installation of conventional and prepaid meters

Inspection of kiosk

Checking of loose connection

Checking illegal connections on the meter .e.g tampering

3.2.4. INSPECTIONS OF OVERHEAD LINES AND NETWORK (LV and MV)

Dressing of overhead line poles

Phase colours are correct

Stringing of overhead lines

Inspection of trees touching the overhead lines

3.2.5. ALL SWITCHING PROCEDURES MUST BE DONE IN A SEQUENCE NAMELY

Switching operation

Earthing

Safety testing

Link operation

Megger test 11KV cables

3.3. NAME OF COMPANY : PLUMBLINK CENTURION PTY LTD

DEPARTMENT/BRANCH : CENTURION

POSITION : GENERAL ASSISTANT (GA)

DURATION : 08/02/2019 TO DATE

4.REFFERENCES

4.1 NAME : MR S MPFOLO

POSITION : ELECTRICIAN

CONTACT : 082*******

4.2 NAME : MONICCA RAPETA

POSITION : 2ND IN CHARGE /STOCK CONTROLLER

CONTACT : 073*******/079*******



Contact this candidate