Post Job Free

Resume

Sign in

Senior civil supervisor

Location:
Sukabumi, West Java Province, Indonesia
Posted:
January 02, 2020

Contact this candidate

Resume:

John Robert Latupeirissa

Email : ada6uu@r.postjobfree.com

Mobile : 085*-****-****

WhatsApp : 085*-****-****

Alt No. : 081*-****-****

Work Experience :

SR. CIVIL SUPERVISOR

CSTS JO (CHIYODA-SAIPEM-TRIPATRA-SAE JOINT OPERATION) January 2019 – December 2019 (Contract Completed) FOR BP TANGGUH LNG EXPANSION PROJECT (TRAIN-3 CONSTRUCTION) AT BINTUNI, WEST PAPUA for BP BERAU UNDER SKK MIGAS

Success in supervising construction activities of Train-3 civil portion at area T-03, T-05, assisting peer supervisor at T-02, new T-02,T-04, T-07 and T-08 all within time frame. Manages safe and proper excavation jobs, construction of PHT, rebar installation, pile caps, pedestal, pipe support, deep and/or shallow foundation for pumps, panels, heat exchangers, various vessel foundation for 450 Ton acid stripper, 380 T amine gas drum, 6.3KV and 33KV transformer foundation, 1”/2”/3”/4” anchor bolts installation, concrete pouring approx. 5500 m3 at my area only, concrete coatings, formworks installation and dismantling, construction and installation of manhole, electric duct bank installation, cable trenching, heavy duty paving, approx. 18000m3 backfilling works to the final design level as per specification, and many more. Manages the utilization of heavy equipment’s, close coordination with other supervisor and engineers, HSE officers, expats superintendent and project manager. Actively involved in daily planned activities such as batching plant for concrete dispatch, rebar fabrication and dispatch, material for backfilling, mechanical/electrical engineer and supervisor for preparation after hand-over. Prepare daily reports to project control and/or construction engineer, urge subcontractors to immediately prepare Work Release Notice (hand-over) document, actively involved in the WhatsApp group for civil construction. Coordinates with peer supervisor for the installation of 6”/10”/16”/20” 3500 m1 GRE pipe, 16” 400 m1 HDPE pipe and the construction of incinerator area. CIVIL SUPERVISOR

PT WIRANA JAYATAMA ABADI January 2018 to August 2018 (Project Completed) FOR 30M X 16.5M CHEMICAL WAREHOUSE AT PLTU JAWA-2 PROJECT, PT INSDONESIA POWER AT BUNTON ADIPALA, CILACAP.

Supervising excavation works and backfilling and immediately pouring concrete pouring for foundations, pedestal, tie-beams while fabrication for steel structure is progressing. Supervise installation of steel structure, brick wall layering, installation of door, windows and frame, pouring concrete for floor. Manages M/E/I subcontractor to immediately start the mechanical, electrical, instrument work packages such as rolling door, high pressure sprinklers piping, alarm system, electronic data transfer system to main operation building and epoxy application upon floor. Coordinates all parties to attend weekly progress meeting, Contract Change Order (CCO) meeting with Client. Maintain positive relationship with Client, Consultant, Sub-contractors, Suppliers. Prepare weekly plan and supervise completion of final punch list. Encourages safe work practices and rectify job site hazard immediately. CIVIL SUPERVISOR

PT REKAYASA INDUSTRI August 2013 to August 2015

CHEVRON GEOTHERMAL SALAK LTD

Supervising construction of bore piles to Awi-14 c/w above ground u-ditch system, 6” underground drilling operation to mitigate trapped water which finally weaken drilling well pad, maintain environment and monitors well pad perimeter from land slide tendency.

Supervising construction hundreds of pipe support various diameter and depth, manual excavation of bore piles, construction of concrete blocks to compensating depth of bore pile which is not comply with design depth. Supervising steam and condensate pipeline installation of civil portion, construction of pipe bridge, concrete culverts for road crossing and slope stabilization.

Success in supervising cut and fill work approx. 50,000 m3 to be moved to disposal area, to modifying existing well pad for Awi-9 conversion project and separator station. Supervising the installation of sheet piles, gabions, retaining wall, to stabilize well pads and access roads after landslide at Awi-18, Awi-10 and Awi-3 for future drilling operation. Succeed in supervising the construction of 2 story Salak Geothermal Science Center building i.e. steel structure installation, concrete works (coordinate with batching plant for the use of concrete mixers and concrete pumps), flooring works, roofing installation, railing and fencing, landscape, etc. CIVIL SUPERVISOR

PT SUPRACO INDONESIA on-behalf-of CHEVRON GEOTHERMAL SALAK, Ltd August 2009 to April 2013 Success in supervising cut and fill work for the construction of drilling well pads 2X100acre Awi-22 which is the huge cut and fill work at around 50,000 m3 soil to be moved to disposal area. Manages well the utilization of heavy equipment and task force manpower.

Success in supervising the construction of 4.5 km exploration road heading to the drilling area 6 m width c/w 1 m road shoulder, drainages system, water channel installation, and road stabilization using gabions after land slide, and road banks shotcrete installation.

Supervising the construction of domestic water system 6” pipeline pipe supports from water source for drilling utility. Supervising the construction of sump pond dimension 2ea 15m x 40m x 4 m depth c/w anti-leak system (HDPE liner cut, weld and installation).

Supervising the construction of drainage system surrounding the perimeter of well pads (u-ditch and v-ditch c/w manholes and catch basin)

Supervising slope stabilization for the well pad perimeter by terracing and revegetation CIVIL SUPERVISOR

PT WIRANA JAYATAMA ABADI on-behalf-of CHEVRON GEOTHERMAL SALAK, LTD August 2007 to July 2009

Success in supervising cut and fill work for the construction of drilling well pads 2X100acre Awi-20 and Awi-21 which is the huge cut and fill work at around 175,000-250,000 m3 soil to be moved to disposal area. Managed well the utilization of heavy equipment and task force manpower and subcontractors. Success in supervising the construction of 4.5 km exploration road heading to the drilling area 6 m width c/w 1 m road shoulder, drainages system, water channel installation, sheet piling installation, and road stabilization using gabions after land slide.

Supervising the construction of domestic water system 6” pipeline pipe supports from water source for drilling utility. Supervising the construction of sump pond dimension 2ea 15m x 40m x 4 m depth c/w anti-leak system (HDPE liner cut, weld and installation).

Supervising the construction of drainage system surrounding the perimeter of well pads (u-ditch and v-ditch c/w catch basin)

Supervising slope stabilization for the well pad perimeter by terracing and revegetation also shotcrete application CIVIL SUPERVISOR

PT BINA RASANO ENGINEERING on-behalf-of CHEVRON GEOTHERMAL SALAK, LTD August 2004 to July 2007

Success in supervising cut and fill work for the construction of drilling well pads 2X100acre Awi-17, Awi-18 and Awi-20 which is the huge cut and fill work at around 250,000-300,000 m3 soil to be moved to disposal area. Managed well the utilization of heavy equipment and task force manpower and subcontractors. Success in supervising the construction of 7.0 km exploration road heading to the drilling area 6 m width c/w 1 m road shoulder, bridges, drainages system, water channel installation, sheet piling installation, sabo dam, and road stabilization using gabions after land slide.

Supervising the construction of domestic water system 16”, 10” and 6” pipeline pipe supports from water source (sabo dam) for drilling utility.

Supervising the construction of sump pond dimension 3ea 15m x 40m x 4 m depth c/w anti-leaking system (HDPE liner cut, weld and installation and test).

Supervising the construction of drainage system surrounding the perimeter of well pads (u-ditch and v-ditch c/w catch basin)

Supervising slope stabilization for the well pad perimeter by installation of gabions, sheet piling and revegetation CIVIL SUPERVISOR

PT. MAHFINDO UTAMA on-behalf-of UNOCAL 76 GEOTHERMAL LTD May 2003 to July 2004 Being the member of success team of Salak recovery project, a quick fix works after a massive landslide that impact to the steam delivery to power plant. Supervising all areas for clearing after mud flow, re-construction work for road, bridges, steam pipe supports and success to deliver steam within one month to power plant for 6X55MW electricity re-generation.

Supervising the stabilization of road by installing sheet piles, reconstruct road from rock plating to bitumen re- application. Supervising the stabilization of drilling well pads using gabions, steel sheet piles, terracing, and re- modification of pads. Manages very well the utilization of heavy equipment’s and task force manpower team to reconstruct all facilities.

SITE MANAGER CIVIL WORK

PT. BAYU SANTOSA PRIMA at Wayang Windu Geothermal Project October 2001 to March 2003 Supervising the construction of sump pond dimension 4ea 30m x 60m x 4 m depth c/w anti-leak system (HDPE liner cut, weld and installation for anti-leak system) at MBE/WWQ/MBD/WWA drilling pads for storing facility of drill cutting, complete with guard houses.

Supervising the construction of domestic water system 16”, 10” and 6” pipeline pipe supports from water source for drilling utility.

Supervising the construction of 2X24” steam pipeline supports from MBE heading to WWQ Supervising the construction of 2X24” steam pipeline supports from WWT heading to SS-1 SITE MANAGER CIVIL WORK

ROLLS-ROYCE INDUSTRIAL POWER October 1999 to October 2000 for PLN Pikitring South Sumatera Coordinates the delivering of 3EA 5MW diesel engine from Bangka port using SPMT commeto to the power plant for additional engines. Supervising the construction of new engine foundations (civil work), fabrication and installation of rebar, concrete pouring. Supervising the construction of MFO 15,000 KL tank foundation, fabrication and installation of rebar, concrete pouring. Supervising excavation works for cable trench, backfilling steps as per specification and testing of materials after compaction. Manages well coordination with M/E/I subcontractors SITE MANAGER CIVIL WORK

PT PUTRA DHARMA HARMOTEKNIK for PT. FREEPORT INDONESIA September 1997 to September 1998 Supervising the construction of Octagon Project i.e. the construction of buildings for Indonesian army where civil work is the main work, concrete pouring, steel structure erection, flooring, installation of Kansai flooring epoxy, brick wall works, roofing, etc. for houses with various type and dimension, clinic, warehouses, workshop, garage, mess hall, mosque and church, sport center, and many more.

CIVIL SUPERVISOR

PT INTI KARYA PERSADA TEKNIK (IKPT) on-behalf-of PT. FREEPORT INDONESIA Sept ‘97 to March 2004 Supervising the installation of 40 km 18” HDPE pipe from Kwamki Lama lake to supplying raw/fresh water to PT Freeport electricity generation plant at Cargo Dock managing the excavation for pipe trench, several road cut for pipe crossing, sand bedding, hydrotesting and backfilling then prepare a save road for mining operation after excavation work.

CIVIL SUPERVISOR

PT. BAYU SANTOSA PRIMA Nov 17, UNOCAL 76 GN SALAK GEOTHERMAL NOV1996 – Jan 25,1997 Supervising sump pond repair work at Awi-12 drilling location, stabilizing pond corner from dragging by landslide and high rainfall rate by installing nailing system, installation of gabion wall and gabion floor, concrete wall pouring installing wire-mesh, reconstruct drainage system to ensure reinstatement of well pad for drilling operations. Success in supervising the installation of 12 km temporary electrical power line for water supply which is the installation of power poles, overhead cabling and accessories, instrumentation and panel by subcontractor for booster pumps, and water sources dam construction.

EDUCATION

Bachelor in Mineral Engineering majoring in Petroleum and Gas Universities Pembangunan Nasional "Veteran" Yogyakarta - Indonesia August 1994

TRAINING / SHORT COURSES

CSTS JO (Chiyoda-Saipem-Tripatra-SAE Joint Operation) November 2019 Tangguh Expansion Project Gateway, Site Orientation Training, Control of Work Training, Leadership Training. Intercultural Awareness Training

CHEVRON GEOTHERMAL SALAK LTD 2011-2014

Permit To Work, Hot Work, Isolation of Hazardous Energy, Bypassing Critical Protection, Lifting and Rigging, Excavation, Working at Height, SIMOPS, Electrical, Access Control, PPE, MSDS, Housekeeping, Hazard Analysis, Hazard Identification, Stop Work Authority, MOC, LOTO, QSOP ASSOCIATION OF ENGINEERS, INDONESIA Certificate October 2011 This certificate was issued by PII or Association of Engineers, Indonesia for Project Management Course as Construction Engineer

CHEVRON PACIFIC INDONESIA Certificate August 2010 Share Point Foundation training CHEVRON GEOTHERMAL SALAK LTD Certificate January 2009 GPO-Indo Safe Work Practice Training (FSWP)

CHEVRON GEOTHERMAL SALAK LTD Certificate January 2009 CIVIL WORK PROCEDURE TRAINING Facilitated by Chevron GPO Facilities Engineering and Construction PT INDUSTRIALINDO KONSULTRAIN SERVICE December 2008 Working At Height Courses

Rigging And Lifting Courses

SKILL

Commercial awareness – an understanding of how my actions/plan can affect profitability of a project Team working and communication

Being honest with all people and well-discipline

Technical skills

Problem solving

Management and leadership skills

AWARDS

TERIMA KASIH AWARD - Certificate of Appreciation from Chevron Geothermal Salak Ltd June 2009 For achievement in commitment, discipline, dedication and maintain high level of safety awareness to complete the construction of the access road, location and WDS pipeline to C-1 TERIMAKASIH AWARD - Certificate of Appreciation from Chevron Geothermal Salak, Ltd. November 2011 For achievement in demonstrating a commitment to teamwork by completing WWTP project fully contributing in getting PROPER AWARD

TELADAN AWARD - Certificate of Appreciation from Chevron Geothermal Salak Ltd. June 2008 For significant team contribution effort in evacuating excavator at Awi-10 location TELADAN AWARD-Certificate of Appreciation from Chevron Geothermal Salak, Ltd. July 2012 Highest appreciation to my extraordinary contribution for safe and successful Awi 3-16 project steam blow down and commissioning

CERTIFICATE OF APPRECIATION From PT Alkin Mitrakarsa June 2002 For high achievement and contribution to the success of MBE-WWQ wellsite upgrade, Wayang Windu geothermal power plant during installation of HDPE liner

SAFETY AWARD from FLUOR DANIEL IND. INC September 1997 For my outstanding performance during the construction of UNOCAL 76 Geothermal Project at Gunung Salak and demonstrated ability to work safely with others to achieve 750,000 safe work hours SAFETY AWARD-Chevron Geothermal Salat Ltd May 2011 Outstanding performance during the construction of Chevron Geothermal Salak Project at Gunung Salak to achieve 15,000,000 safe work hours since 2003

INFORMATION

I have SKCK (Indonesian Police Certificate for no criminal act) valid until 2019 I have SIM A (Indonesian Driving License for Mini Bus/Jeep/Sedan until 2000cc) valid until 2020 I have SIM C (Indonesian Driving License for Motor Bike until 200cc) valid until 2024



Contact this candidate