Resume

Sign in

Senior Controls Engineer

Location:
Hercules, CA
Salary:
$13,400.00 per month
Posted:
January 02, 2020

Contact this candidate

Resume:

NAME: Mercado, Edison P. (******) HE***** DATE: August 8, 2019

POSITION TITLE: Senior Control Systems Engineer

ORGANIZATION: Bechtel National Inc.

LOCATION: Richland, Washington

CITIZENSHIP: United States

CONTINUOUS SERVICE: January 28, 1980

SPOUSE’S NAME: Esther B. Dizon

CHILDREN’S DETAILS: Anthony (1981)

Christina (1985)

PROFESSIONAL LICENSES AND SOCIETIES

Electrical Engineer, Manila, Philippines

EDUCATION AND PERSONAL DEVELOPMENT PROGRAMS

Degree, Certificate, etc. School Major (or Subject) Date

Bachelor of Science Mapua Institute Electrical 1969

of Technology Engineering

Manila, Philippines

OTHER SIGNIFICANT INFORMATION

PERSONAL: Interested in engineering design, management, and construction

LANGUAGE: Pilipino

OTHER: Inactive Department of Energy Secret Clearance and Department of Defense Secret Clearance

WORK HISTORY

DATES

FROM TO

COMPANY, DIVISION OR

DEPARTMENT,

LOCATION AND SUPERIOR

POSITION HELD, SUMMARY OF

RESPONSIBILITIES AND

SIGNIFICANT ACCOMPLISHMENTS

1/12/15

8/8/19

Bechtel National Inc

WTP Project Richland WA

Paul Schmitz

Senior Control Systems Engineer

Responsible for providing responses and closing Condition Reports assigned by the supervisor. Review System Design Descriptions for LAW, HLW and PTF.

8/14/14

12/19/14

Bechtel OG&C

BP Heater Replacement Project Blaine WA

John Baily

Control Systems Engineering Supervisor

Responsible for developing the Process Control Philosophy, Cause and Effect Diagrams, Control System Block Diagram, and instrument index.

8/13/12

8/13/14

Bechtel OG&C

ABB Facility Sugarland Texas

Don Tobola / Myriam Marin

Senior Control Systems Engineer on the QCLNG project

Checked the loop diagrams against the latest Data Exchange received from ABB. Also updated the control valve data sheets in Smart Plant Instrument database to incorporate vendor information and latest process information. Responsible for creating punch list for the software/hardware issues identified by the Factory Acceptance Test Engineers. Also, responsible for checking the Design Change Notices to ensure the changes are captured by the Computer Automation Team in the ABB Facility.

4/2/07

8/10/12

Bechtel National Inc.

Department of Energy

WTP

Justin Kulbeck

Lead Systems Engineer, Oakland Controls and Instrumentation, Waste Treatment Plant Project

Responsible for remote programming of the ABB DCS, developing logic diagrams for the Auto Sampling Systems and Mechanical Handling Systems, developing the Life Cycle Documents for the packaged equipment acquired software, preparing of instrument data sheets / material requisitions, and developing interconnection diagrams

12/02

3/30/07

Bechtel National Inc.

Department of Defense

Pueblo Colorado

Partha Parthasarathy

Instrumentation and Control Systems Supervisor on the Pueblo Chemical Agent Pilot Project (PCAPP)

Responsible for planning, budgeting and scheduling of the control systems tasks and deliverables. Responsible for the design of the Integrated Control System, HVAC Systems, Facility Protection System, Process Data Acquisition and Recording System, Site Security System, CCTV System, and Agent Monitoring System. Responsible for developing the specifications, data sheets, and material requisitions for all the instrumentation on the PCAPP project.

6/01

11/02

Bechtel National Inc.

DARPA Department of Defense

Nevada Test Site

David O’Flynn

Bechtel National Inc

Staff Engineer

John Schneider

Lead Electrical and Control Systems Engineer, Integrated Systems Experimentation for Immune Buildings for the Department of Defense

Responsible for planning, budgeting and scheduling of the control systems tasks and deliverables. Worked on a test bed building to develop the best architecture for detection, containment, neutralization, and decontamination of chemical and biological agents released in a building.

Control Systems Staff Engineer responsible for the technical support for BNI projects. Also, supporting the BNI project’s staffing requirements and scheduling technical trainings.

10/98

5/01

Bechtel Mining & Metals

Antamina Copper / Zinc / Bismuth / Molybdenum Concentrator Facility

San Marcos, Peru

Sheena Hebbar

Instrumentation and Control Systems Supervisor

Responsible for planning, budgeting and scheduling of the control systems tasks and deliverables. Responsible for developing specifications, data sheet, and material requisitions for all the instrumentation including hazardous gas detection systems and Close Circuit Television System.. Responsible for developing the Plant Control Systems Architecture Block Diagrams, logic diagrams, loop diagrams, analog functional diagrams, loop descriptions, and Factory Acceptance Test procedures. Also responsible for the design, specification, procurement, programming, and testing of the Plant Control System including interface with vendor supplied Programmable Logic Controllers. Developed the scope of work for the Plant Fire Protection and Emergency Voice Evacuation Systems turnkey contract.

05/97

09/98

Bechtel Mining & Metals

Lebec Cement Plant

Modernization Project

Lebec, California

Christopher Rayner

Instrumentation and Control Systems Supervisor

Responsible for planning, budgeting and scheduling of the control systems tasks and deliverables. Responsible for the design, procurement, and implementation of the G.E. Programmable Logic Controller (PLC), instruments, and continuous emission monitoring system. Developed the PLC cabinet arrangement drawings, PLC cabinet wiring diagrams, logic diagrams, loop diagrams, specifications, instrument data sheets, and material requisitions.

03/96

04/97

Bechtel National Inc.

Advance Vapor Laser Isotope Separation (AVLIS) Uranium Enrichment Project

Livermore National Laboratory

Livermore California

Kenneth Cooke

Instrumentation and Control System Supervisor

Responsible for planning, budgeting and scheduling of the control systems tasks and deliverables. Responsible for 17 Senior Control Systems Engineers working collaboratively with LLNL controls and process engineers in the preliminary engineering to define and develop the control system for the AVLIS Uranium Enrichment Plant. Responsible for the development of the requirements specifications, functional architecture drawings, system platform drawings, and hardware network drawings. Responsible for defining applicable codes and standards and writing the control system technical description to support the Nuclear Regulatory Commissioning Licensing applications.

10/94

02/96

Bechtel Oil and Gas

RAS TANURA Refinery Upgrade Project, Plant Automation System

Ras Tanura, Saudi Arabia

Gerald Brown

Unit Process Engineer and Technical Coordinator

Responsible for implementing the Honeywell TDC 3000 control system for the Industrial Waste System. Responsible for coordinating design activities and deliverables with four lump sum turnkey contractors. Responsible for coordinating the Emergency Shutdown System requirements with other contractors.

04/94

09/94

Bechtel National Inc.

Solar II Project

Madanjit Singh

Senior Control Systems Engineer

Responsible for developing the logic diagrams for the receiver, collector, and steam generation systems.

05/93

03/94

Bechtel Mining and Metals

Newmont Gold Refinery Ore Treatment Project

Elco, Nevada

Joseph Sienkewitz

Senior Control Systems Engineer

Responsible for developing instrument specifications, data sheets, and material requisitions for all the field instruments. Responsible for developing the logic diagrams.

07/90

04/93

Bechtel National Inc.

Hong Kong Government Chemical Waste Treatment Plant

Tsing Yi Island, Hong Kong

Flavio Santini

Control Systems Engineering Supervisor

Responsible for planning, budgeting and scheduling of the control systems tasks and deliverables. Responsible for the design, specification, procurement, and construction support of the plant instrumentation and the Honeywell TDC 3000 distributed control system interface with the Johnson Controls Management and Information System. Responsible for the instrumentation and control systems to monitor, control, process, and track the various chemical and marine pollution from Hong Kong’s industrial facilities. The plant processes include waste receiving/handling/tracking, physical/chemical treatment, incineration, and waste stabilization.

07/89

06/90

Bechtel National Inc.

Weapons Vault Project

NATO Countries

U.S. Air Force

Ronald Naventi

Control Systems Engineering Supervisor

Responsible for planning, budgeting and scheduling of the control systems tasks and deliverables. Responsible for the specification, procurement and shop testing of the CCTV and Security System for the Weapons Storage Vaults for the U.S. Air Force.

03/89

06/89

Bechtel Oil and Gas

British Hawaii Independent Refinery Wastewater Treatment Plant

Oahu, Hawaii

Derek Bem

Senior Control Systems Engineer

Responsible for developing the logic diagrams and instrument loop diagrams. Coordinated technical and procurement activities of the BAILEY INFI90 distributed control system.

05/87

02/89

Bechtel National Inc.

Special Isotope Separation Plutonium Enrichment Project

Boise, Idaho

Kenneth Cooke

Control Systems Engineering Supervisor

Responsible for planning, budgeting and scheduling of the control systems tasks and deliverables. Responsible for the instrumentation and controls for radiation release, monitoring/containment, waste management, liquid effluent monitoring, HVAC, leak detection systems, and continuous air monitoring of the stack. Responsible for the engineering and design of the distributed control system and interface with the plant management and information system.

11/86

04/87

Bechtel National Inc.

Liquid Effluent Treatment Facility

Hanford Washington

Gordon Pedersen

Electrical/Control Systems Engineering Supervisor

Responsible for planning, budgeting and scheduling of the control systems tasks and deliverables. Responsible for the instrumentation and programmable logic control systems for treatment, storage/discharge, and monitoring of the liquid effluent from the N-Reactor. Duties included the radiation monitoring system, area radiation monitors, isokinetic sampling system.

11/84

10/86

Bechtel National Inc.

Electrical/Control Systems Engineering Department

San Francisco, California

Kenneth Bailey, Chief Engr.

Staff Engineer

Assisted in project staffing requirements and off-project technical reviews. Responsible for scheduling technical in-house training, participation in engineering seminars and coordination of vendor technical presentation at Bechtel.

11/82

10/84

Bechtel National Inc.

Uranium Enrichment Recycle / Assembly Project

Piketon, Ohio

Ronald Naventi

Control System Engineering Supervisor

Responsible for planning, budgeting and scheduling of the control systems tasks and deliverables. Responsible for the design of the instrumentation and controls for the decontamination and waste collection systems, radiation monitoring systems, HVAC, and close capture systems.

Seconded to Goodyear Atomic’s pre-operation and start-up group to perform loop check and testing of the Gas Leak Test Stand System.

1/80

10/82

Bechtel National Inc.

Waste Isolation Pilot Plant

Project

Carlsbad, New Mexico

Ronald Naventi

Control Systems Engineer

Responsible for developing the instrument specification for the first of a kind radioactive waste storage facility.

01/79

12/79

Engineered Control Systems

Redwood City Ca.

Kaname Sato

Control Systems Enginer

Responsible for developing the controls for waste water treatment system using programmable logic controller. Also developed controls for freeze protection and process heat tracing systems.

02/78

12/78

Bechtel Power

Midland Nuclear Power Plant

Midland Michigan

George Pfaltz

Electrical Field Engineer

Responsible for the installation and termination of the Main Control Room Panels, Auxiliary Building Control Panels, and Intake Pump Structure Control Panels.

03/77

01/78

Davey McKee

Yugoslavia Nickel Mining Project Yugoslavia

Nick Lialin

Electrical Engineer

Design and layout of motor control centers, control panels, and cable tray spread rooms.

09/74

02/77

Magnetics Corporation

Millbrae, California

Jack Sullivan

Control Systems Engineer

Developed control panel wiring diagrams for oil refineries, mining, and chemical plants.



Contact this candidate