CURRICULUM VITAE

LANKA AVINASH Mobile No: 779-***-****,703-***-****

Email : ada5sp@r.postjobfree.com

Skype: lankaavi

Candidate Name : L. AVINASH

Date of Birth : 27-APRIL-1989

Total work experiance : 10 YEARS & 03 MONTHS

Nationality : INDIAN

Known languages : TELUGU, ENGLISH, TAMIL & HINDI

Marital Status : MARRIED

Permanent Address : L.AVINASH,

S/O. L. RAMA MOHANA RAO,

DOOR. NO : 1-1-76, AKKIREDDYPALEM,

B.H.P.V. POST, VISAKHAPATNAM – 530012,

ANDHRA PRADESH ., INDIA.

Passport Details

Passport No : Z4105019

Issue on : 07/04/2017

Expiry on : 06/04/2027

EDUCATIONAL QUALIFICATION

DIPLOMA ELECTRONICS & COMMUNICATION ENGG

COMPUTER KNOWLEDGE

MS OFFICE.

AUTOCAD.

AWARENESS OF NATIONAL & INTERNATIONAL CODE

• SAES (Saudi ARAMCO Engineering Standards)

• NFPA 70(National Fire Protection Association)

• NEC (National Electrical Code)

• NEMA (National Electrical Manufacturers Association)

• IEC(International Electro Technical Commission) Codes

• ANSI (American National Standard Institute)

• ISO (International Standards organization)

EXPERIENCE:

Around 10 Years & 06 months, Electrical QC Inspector in 05 Years & Electrical Supervisor in 05.3 Years, in all type of Electrical Inspections, and Electrical Erection and Testing activates in Oil and Gas and Power Projects. Able to understand the project drawings logic circuit diagrams. Familiarization and understanding of industry code, Familiar with Engineering standards and procedure for Electrical system.

EXPERIENCE IN INDIA & ABROAD:

Electrical QA/QC Inspector

PROJECT : FADHILI GAS PROJECT(SRU)

CLIENT : PETROFAC SAUDI ARABIA LIMITED(ARAMCO)

POSITION : ELECTRICAL QA/QC INSPECTOR (ARAMCO APPROVED)

DURATION : JUL 2018 TO TILL DATE

ORGANIZATION : NASEER S. AL HAJIRI CORPORATION

PROJECT : SHIP BUILDING CENTER(OTNY),NAVAL DOCKYARD, VIZAG

POSITION : ELECTRICAL QA/QC INSPECTOR

DURATION : FROM DEC 2014 TO MAY 2018(3.6 YEARS)

ORGANIZATION : CONCEPTIA & ADR ENGG WORKS

DUTIES AND RESPONSIBILITIES:

Responsible for assuring and controlling the work quality as per the approved Procedure, QCP, ITP, and Project Standard, & specifications.

Conduct inspection for electrical work phase based on approved ITP & relevant client standards & specification. These covers Grounding, Conduit, Duct Bank Cable trays, lighting, LV/MV cables, Panels, Transformers, installations

Material receiving inspection as per Material Approved Request and Review of Material test certificates.

Responsible for Preparing and verification of the document like RFIs & test reports on daily basis which are raised by construction team.

Perform site surveillance inspection to ensure all electrical installations conform to latest Drawing and relevant standards &specifications.

Perform LV/MV cable testing before and after installation (continuity, insulation resistance testing &high potential testing, etc….)

Power Transformer Installation and Testing

(Insulation resistance, winding resistance test, turns ratio test, CT polarity test, etc…..)

Motors Erection and Testing (IR Test, WR Test, Polarization Index test, Vibration, etc...)

Switchgears Erection and testing(IR Test, Hi-Pot Test, Contact Resistance Test, Torqueing checking, etc….)

Responsible for the preparation of Quality control procedure & ITP.

For issuing the Non-conformance (NCR) wherever not as per project specification and standards.

Monitor work for compliance to applicable codes, accepted engineering practices.

Checking for Elements of Electrical systems, and acceptance criteria & Issues and cable raceways and power systems units, and Electrical cable tests etc…….

I am maintained all types of QAP, MP, FATs, scope and drawings

Electrical Supervisor

PROJECT : RAFHA POWER PLANT & BISHA SUBSTATION

CLIENT : SAUDI ELECTRICITY COMPANY (SEC)

POSITION : ELECTRICAL SUPERVISOR

PERIOD : FROM JUN 2012 TO SEP 2014(2.3 YEARS)

ORGANIZATION : SAUDI SERVICES ELECTROMECHNICAL WORKS, SAUDI ARAB

PROJECT : NEW DOHA INTERNATIONAL AIRPORT

CLIENT : MUHIBBAH ENGINEERING (M) BHD

POSITION : ELECTRICAL CHARGEHAND

PERIOD : FROM JAN 2011 TO JULY 2011(6 MONTHS)

ORGANIZATION : CIMAC, QATAR

PROJECT : VIZAG STELL PLANT

POSITION : ELECTRICAL SUPERVISOR

DURATION : FROM DEC 2009 TO DEC 2010(1 YEAR)

ORGANIZATION : M/S SUNRISE INDUSTRIES

PROJECT : B.H.P.V. MUMBAI 2X100 TPH STEAM GENERATING BOILER

POSITION : ERECTION AND COMMISSIONING ENGINEER-

APPRENTICESHIP

DURATION : FROM DEC 2008 TO NOV 2009(1 YEAR)

ORGANIZATION : M/S BHARAT HEAVY PLATE & VESSELS LTD.

PROJECT : HINDUSTAN PETROLIUM CORPRATION LTD, VIZAG

POSITION : ELECTRICAL SUPERVISOR MAINTENANCE

DURATION : FROM NOV 2007 TO JULY 2008(10 MONTHS)

ORGANIZATION : M/S GOPAL ENGINEERING WORKS

DUTIES AND RESPONSIBILITIES:

GIS installation and Testing of 380/132KVA ( ABB, HYOSUNG )

70 MGWTS Power Plant Erection and testing the Gas Turbine Activities.

11kv Substation Erection and testing Activities(Schneider Electric)

Installation, Testing Switchgears, Distribution Panel, Primary Cabinets SMDB and DB’s.

Installation and Testing of power transformers.

Installation, Testing of LCC, MCC, CCR, PCC Rooms and Panels.

Installation of control panels, switchgear panels, ATS panels, capacitor banks, with bus bars, ACBs, VCBs, MCBs, relays, contactors, PCBs, etc……

Installation, Testing and Commissioning of Small power, Lighting Circuits

Installation of Various types of substation, plant, internal and external lighting fixtures.

Installation, Testing of UPS and Batteries.

Installation of grounding and Earthing Lightning Protection Systems.

Installation of cable raceway and containment of Electrical system.

Installation and Testing of AHU and HVAC System and panels.

Installation of fire alarm system & devices.

Glanding & Termination of LCC Panels to Breakers, CT, PT, Earthling switches etc…..

Installation activates of Panel Boards, Cable Schedule for Trench and Duct Bank

HV,MV,LV and Control & Power cable pulling and Glanding, terminations

All type of Electrical Construction activates.

Installation and Testing of Electrical Equipment’s and Sensors.

Maintained the all type of electrical and electronics machines and equipment’s.

Boiler erection and testing activities in BFW pumps, Heaters, Field instruments.

PROJECTS HANDLED

ACQUAINTED WITH BOILER ERECTION ACTIVITIES IN MUMBAI HPCL.

CONSTRUCTION IN THE EXTENTION OF VIZAG STELL PLANT.

11kv SUBSTATION IN NDIA AIRPORT, CLIENT: BECHTEL, QATAR

AL BISHA 380/132KVA BSP SUBSTATION CLIENT: SUADI ELETRICITY COMPANY (SEC) WESTERN REGION, AL BISHAH, SAUDI ARABIA.

RHAFA 70 mgwts POWER PLANT (SEIMENS & GE UNITS) AND 132KV SUBSTATION CLIENT: SUADI ELETRICITY COMPANY (SEC) EASTERM REGION, RAFHA, SAUDI ARABIA.

CONSTRUCTION ACTIVITES IN SHIPS AND SUBMARINES.

SULFUR RECOVERY UNIT PACKAGE-3, PETROFAC SAUDI ARABIA LIMITED(ARAMCO) PROJECT, JUBAIL,SAUDI ARABIA.