Resume:

Name Jithin Gopal

Nationality Indian

Age ** years

Profession Planning and Project Controls

Current position Planning Engineer

Year of joining firm Feb 2014

QUALIFICATION:

**** - **** ******or Degree in Electrical & Electronics Engineering (B-TECH)

Mahatma Gandhi University (MG University)

2013 Automation Engineering (SCADA, PLC etc.) & Primavera P3 & P6 (8.3.2 & 15.1)

EXPERIENCE ONGOING (5 Years):

Company: Special Technical Services STS Oman (JAN 2017, up till now.)

Designation: Planning Engineer

Projects: Yibal Rejuvenation Project (YRP)

1.Project: Construction of Yibal Rejuvenation Project (YRP)

Client: Petroleum Development of Oman (PDO).

Location: Yibal, Oman

Scope Highlights:

Project value 80 Million, USD

Static and Rotating equipment’s demolition and erection. (1350 TON)

3500 MT structure fabrication and erection

300000 ID Piping fabrication, demolition and erection (CS, SS, DSS & GRE)

Demolition, rerouting and laying of flow lines (550 KM)

Demolition and construction for civil and mechanical works

Control building and Substation construction

Camp and Industrial area and STP construction

All E&I works

Shutdowns (2 nos.)

CCMS Coordination (Zenator System)

Pre-commissioning and Commissioning assistance

2.Project: Fahud New Fire Station Constructions

Client: Petroleum Development of Oman (PDO).

Location: Fahud, Oman

Scope Highlights:

Schedule making for Fire Station Construction (All civil/Mech/E&I related activities)

Earth related activities

Structural fabrications

HVAC Activities

Fall Ceiling activities

CCMS Coordination (Zenator System)

Pre-commissioning and Commissioning assistance

3.Project: Fahud West Testing Facility (Gathering Station)

Client: Petroleum Development of Oman (PDO).

Location: Fahud, Oman

Scope Highlights:

Earth Preparation

New Gathering Station Construction (Inc. Vendor Activities)

Civil Foundation & PS Construction Activities

Skid Erections (CI Skid/De-Hydration Tank/Skim Tank/Booster Pump/Test Header/Bulk Header), Structure erection

Piping activities

E&I Related Activities

CCMS Coordination (Zenator System)

Pre-commissioning and Commissioning assistance

4.Project: MLPS Form Skid

Client: Petroleum Development of Oman (PDO).

Location: Fahud, Oman

Scope Highlights:

Demolition of Existing Form Skid

E&I Related Equipment & Process Safe guarding removal

Structure Removal

Skid related piping removal (Blinding & Purging)

Cold Cutting

Pump Foundation, PS & Sleeper Demolition

Construction of New Form Skid

New Pump foundation, PS & Sleeper Casting

Pump & Structure Installation

Vendor Mobilization

Piping Installation

E&I Related Works

CCMS Coordination (Zenator System)

Pre-commissioning and Commissioning assistance

5.Project: Natih Hydro Carbon Accounting Project

Client: Petroleum Development of Oman (PDO).

Location: Fahud, Oman

Scope Highlights:

De-Hydration Tank construction

Civil Activities like Demolition & Constructions

Mechanical & Piping Activity

Tie-in & Shutdown

Testing & Pre-commissioning

Coating & Painting

Flushing & Hydro Testing

E&I Activities

Control & Automation Activities

Company: Bharat Petroleum Corporation Limited- BPCL (FEB 2014 to DEC 2016.)

Designation: Jr.Planning Engineer

Projects: IREP

1.Project: BPCL (Maintenance) / IREP (Upgradation Project)

Location: Kochi, Kerala

Scope Highlights:

Running Plant Maintenances (Monthly & Yearly)

IREP Upgradation project Construction Scheduling

Schedule monitoring for timely completion of Project with current & actual variances.

Shutdown plan preparations

Piping Replacements

Tank repair works

Control Panel Assembles

RESPONSIBILITIES:

Preparing of project Work Breakdown Structure (WBS).

Preparing complete Level, I, II, III, and IV plan in Primavera base on the contract.

Setting work program and target milestones for each phase based on the project plan.

Preparing resource loaded schedule, and Calculation of resources required completing the Project.

Preparing S-Curve and compare actual progress Vs Base line.

Preparing 7/14/30/90 day look ahead plan in Excel for follow-up.

Preparing 14/90 days look ahead plan in SAP.

Monitoring of critical activities based on the project schedule and advise project management.

Preparing extensive EOT and claim documents including disruption, acceleration etc. on the base of strong backup record.

Allocation of resources for planned job, identification and record of ideal resources.

Preparation of Equipment and Manpower histograms direct/indirect histograms, mobilization and demobilizations plan.

Preparing as builds, red line of drawings and TQ's.

Monitoring progress against job plan and schedule, responsible for preparing Daily / Weekly / Monthly reports, take physical progress.

Updating the program on a weekly basis and creating reports outlining detailed history & facts related to delays, disruption & additional works.

Ensuring that work is carried out within budgeted cost and time.

Coordinate all related activities pertaining to testing, pre-commissioning and commissioning of equipment and machinery.

Coordinate with customers for planning and scheduling of activities prior to commencement of work.

Attend Daily/Weekly Planning/Scheduling Meeting with client to achieve the target.

Prepare job hold up issues report and expedite as per priority (weekly, monthly).

Updating higher management and client with the status of the project.

Identify and share knowledge best practices gained from past projects with team members to promote the quality of product/project.

TECHNICAL QUILIFICATION:

SAP (System Application Procedure)

Primavera project planner P6 (R 8.3.2 & 15.1) & P3 (PITAC)

Elect Cadd

PERSONAL TRAINING & SKILLS:

Recommendation Safety Training by STS PDO.

HSELFS (leader ship) course by PDO.

H2S & SO2 Awareness and Escape Training by NTI Oman.

Confined Space Entry Training by STS Oman.

Gas Test Training by STS Oman.

First Aid and CPR Training by STS Oman.

High initiative and risk analysis.

Continuous Improvement & Optimization.

Focus on customer satisfaction.

Ability to work well under pressure.

Well organized.

Excellent communication skills and ability to work with people from various levels in the organization.

Ability to learn quickly

Solve problems independently and always willing to accept significant responsibility.

COMPUTER SKILLS:

Microsoft word/Excel

Primavera P3 & P6 (8.3.2 & 15.1)

SAP (Mustaq – P68)

MS Project

Outlook

Power point.

PERSONAL INFORMATION

Date of Birth : 15 JULY 1991

Passport no : L4898118

Marital Status : Married

Dependent : Three

Language : English, Malayalam, Tamil, Telugu, Hindi, Arabic

Nationality : Indian

Address : Jithin Gopal, Indira Gokulam, Mudiyoorkonam, P.O, Pandalam, PTA (Dist)

Pin-689501

Contact No : 009********** / +919********* / (91-047**-******