Post Job Free

Resume

Sign in

Mechanical drafter 3

Location:
Willis, TX
Salary:
60.
Posted:
December 20, 2019

Contact this candidate

Resume:

Robert Dennis

ada37g@r.postjobfree.com

713-***-****

Objective: To work as a Mechanical Drafter with a successful engineering team where I may contribute to the success of the department and company.

Skills: AutoCad (r13, r14, 2002,2012,2014,2016), Solid Works 2013, Access, Word, Excel, PowerPoint, Outlook, SAP, C-VIS

Education: The Art Institute of Houston, Associates of Applied Science in Computer Aided Drafting and Design

PROFESSIONAL EXPERIENCE

SPXFLOW, Mechanical Draftsman 3, APRIL 2014 – February 2017

Produce complex Assembly and Detail Drawings for custom design products such as Ball Valves, Gate and Expanding Gate valves using Auto Cad 2014-2016

Check the work of other draftsmen for Company standards, geometry, layout, and BOM

Revise engineering change orders (ECO) to maintain current drawings revisions.

Independent Contractor (1099), Drafting – various projects on a per-diem basis, September 2013-Present

Duramast, Mechanical Drafter, May 2011 – September 2013

Produce complex Assembly and Detail Drawings for custom design products such as rotary heads, swivels, and side feeds used for air, water or mud drilling using AutoCad 2012.

Expert in 2D drawings, parts, assemblies, bill of materials and maintaining release status.

Revises engineering change orders (ECO) to maintain current drawings revisions.

Provides support in creating monthly production reports.

Responsible for documenting and updating procedures using AutoCad.

Assists and collaborates with research and development for new products and custom orders.

North Houston Machine, Mechanical Drafter, August 2008 – April 2011

Produced complex Assembly and Detail Drawings for custom design products such as rotary heads, swivels, and side feeds used for air, water or mud drilling using AutoCad 2002.

Responsible for flow of Engineering Change Orders from implementation to sign-off.

Processed Engineering Change Orders compliant with company standards.

Documented procedures using combination of AutoCad and Word.

Responsible for creating Bill of Material (BOM).

Created routing system utilizing MS Excel for machined parts designed to track processes from raw material to assembly.

Outdoor Concepts, Design Contractor, August 2007– August 2008

Drafted preliminary and final sketches to scale using AutoCad r14.

Designed outdoor kitchens and landscape designs.

Cotton USA, Assistant Project Manager, September 2005 – August 2007

Coordinated all mold remediation activities.

Directed all field personnel to achieve completion of the project on schedule, within budget, and with quality workmanship that conforms to original plans and specifications.

Maintained construction schedule, analyzed problems and made sound decisions in a timely manner based on objectives, risks, implications and costs.

Generated daily, weekly and monthly progress reports.

Ordered materials and scheduled inspections as necessary throughout the process.

Maintained positive relationships with clients, contractors, suppliers and other employees.

Maintained an organized and safe job site.

Completed and submitted Incident Reports to the Safety Manager within 24 hours of injury.

Construction & Design Services, Project Manager / Senior Drafter, 1990 - 2005

Designed commercial and residential construction documents to meet city requirements utilizing AutoCad r13 to include structural drawings such as foundations, framing plans and details.

Responsible for progress of construction drawings and job completion.

Coordinator for materials, work schedules and permitting.

Estimator and project expeditor.

Packaged construction documents for plotting, printing and distribution.

Performed construction quality control and field observation inspection.

Directed all field personnel to achieve completion of the project on schedule, within budget, and with quality workmanship that conformed to original plans and specifications.

Maintained construction schedule, analyzed problems and made sound decisions in a timely manner based on objectives, risks, implications and costs.

Generated daily, weekly and monthly progress reports.

Maintained positive relationships with clients, contractors, suppliers and other employees.



Contact this candidate