Ajith Chemery

Mobile: +971-**-*******

Email: ada2mz@r.postjobfree.com

A growth oriented profile in a dynamic organization where best use of my ability and experience will be utilised to the maximum level contributing to the success of the organization & self-growth in the company hierarchy.

I am Senior Structural Cad/ Revit, BIM Coordinator with more than 20 years of experience in design & detail drafting both offshore and onshore. As the focal point for interfacing with engineering. I have a proven track record for managing the production of a significant number of drawings for several international projects, whilst achieving required quality and meeting deadlines set by the project schedule. I am up to date with recent software tools such as AutoCAD, Revit, Revizto, Navisworks and Basic PDMS & Xsteel. I have specialist knowledge of Structural Steel & RCC drawings.

Preparing Structural Revit Models, coordinating with other discipline & clash checking.

Coordinating with the Structural, Architectural & Landscape team to execute the job & provide

Necessary advice to meet the schedule.

Track & monitor the Project Progress & quality to achieve the agreed timeline.

Prepare preliminary Design drawings.

Prepare Design & Detailed drawings.

Management of setup and Cad & Revit systems.

Clash Detection – Navisworks.

Quality management of Cad system (drawing & file output)

Coordinate with the Structural, Architectural & MEP team to deliver the final Design & Detail drawings.

Coordinate with the site team & clarify all the RFI.

Viva Bahriya Development:

Project Brief - Viva Bahriya Development is a mixed-use project to be built in the midst if the Pearl Island – Qatar. The project includes Retail & Residential Towers, Beach Resort, Town Houses & Floating Restaurants.

Deira Water Front - Taj Hotel:

Project Brief - The Project located surrounds the Dubai Water Canal extension, Five Star Hotel Building 1B+G+6 floors close to Al Ras Metro Station. Structural Model & details done on Revit, coordinated in Revizto & Clash detection & review on Navisworks

Meydan One - Mall:

Project Brief - The Project located surrounds the Dubai Water Canal extension to the north & opens to the outdoor sporting & entertainment facilities to the south, the Crystal lagoon meanders through the project site connecting the District 1 on an axis with the Grand Civic Plaza, Dancing Water Fountain & the Dubai One Tower. The Mall features over 360,000sq.m. which includes luxury and premium brand retails, F&B, sports & adventure and entertainment zones. The Canyon that connects the Mall with the Civic plaza.

ENTISAR – Car park Building - Dubai:

Project Brief - The Project is located in Sheikh Zayed Road. This building consists of 6 basements+ground+12 floors parking & sports & gym area & a deck pool, this building is also connected to the Entisar residential tower.

SAFA – B (Part of Dubai canal Front):

Project Brief - The Safa mixed use development consists of two sites Safa A located on the north bank of the canal & safa B located on the southern bank. Safa B is connected to the neighbouring developments. Safa B consists of retail ground level and multiple levels of residential above.

Safa B building 10A & 10B consists of 2 Towers with 2 Basements+1 Podium + 12 floors + Roof.

Deira Island Towers (DIT):

Project Brief - The Project is located in North East end of the city of Dubai, near the existing Deira & Future

Deira Water front, in close proximity to the main Entry point of the Dubai Creek. The overall project consists of a series of 4 interconnected Islands. This project creates a perfect self-sustained community clusters with variety of residential products supported by ground level retail and podium level parking. Each Island consists of 3 Podium + 2 Towers of 17 floors & 2 tower 25 floors.

Crystal Lagoon Tower (CLT):

Project Brief - The Project is located near to the upcoming Canal Water front in Dubai, near the existing Safa park. This project has 3 basements + Ground with 2 Towers having 4 floors parking + 31 Floors. Canal Water front, in close proximity to the main Entry point of the Dubai Creek. The overall project consists of a series of 4 interconnected Islands. This project creates a perfect self-sustained community clusters with variety of residential products supported by ground level retail and podium level parking. Each Island consists of 3 Podium + 4 Towers up to 25 floors.

Deira Water Front – Plot - 04:

Project Brief - The Project is part of the Deira water Front & it is named as Transition Hub, the plot consist of G+3 podium+8 floors with 2 towers, the building is on top of the existing Palm Dubai Metro Station. The ground floor

Deira Water Front – plot - 11:

Project Brief - The Project is located close to the Dubai Metro Tunnel & the Shindagha Tunnel, Plot 11 consist of 2 building, Building B (B+G+3) Hotel & Building C (B+G+6) Commercial Building.

Mohammed Bin Rashid Al Maktoum City – District One:

Project Brief - This project which consists of 4,5,6,7 & 8 bedrooms Villas.

Lift Shaft for LNG/ LPG Tanks:

Detail Engineering, Procurement & Construction activities related to Civil and Mechanical works for LNG/LPG Tanks in Plant 27 as follows:

LNG/ LPG Tanks Roof Repair: Repairs of reinforced concrete roof of 7Nos tanks of various dimensions. (58m dia x 49m high – 3 Nos and 48m dia x 42m high – 4 Nos)

Replacement of 7 Nos. Personnel Lifts: Replacement of exsiting 7 Nos personnel lifts connected to the above tanks.

Replacement of 88 Nos Riser Hanger Supports.

Hyundai-Brownfield Das Island Pipe Rack:

Piping and Structural elements for the 12Nr tie-ins between the existing (brown field) and new (green field) facilities.

Replacement GRE Potable Water Pipe – Zirku Island - ZADCO:

Replacement of approximately 4.5Km of GRE piping with GRP piping to include: - engineering, procurement, installation and commissioning. There is 11 weeks of Engineering 13 weeks’ procurement and 9 weeks of construction.

LNG Jetty Replacement of Utility, Nitrogen & Instrument Air – ADGAS:

Construction & Commissioning works for LPG Line supports repair & replacement of Utility lines at LNG Jetty which include the following major activities.

Piping Engineering: Preparation of piping layouts to optimize space, piping isometric drawings showing supports to be repaired and for new Utility Lines, demolition drawings for redundant lines.

Drawings to replace Nitrogen Lines

Drawings to replace existing Utility Air Lines from Jetty Root to Jetty Head.

Drawings to replace existing Instrument Airlines from Jetty Root to Jetty Head.

Additional Crude Oil Loading Facility – ADMA:

Engineering, Procurement, Fabrication, Installation, and Pre-commissioning & Commissioning of Additional Crude Oil Loading Facilities at Das Island. This comprises briefly of the following activities:

Detail Engineering / Construction Engineering

Details of Control room extension.

Oily Water Treatment Surge Basin – Zadco:

Involved in Preparing Structural GA & Detail drawings, Prepare MTO for Temporary Barrier for tank Repair.

Operator’s Cabin at LNG & Sulphur Jetty Entrance – Das Island:

Detailed Engineering (including preparation of design, calculation and detailed construction drawings), procurement supply, expediting, inspection and storage of materials, fabrication, construction, installation, removal/re-installation etc. project completion, pre-commissioning and commissioning.

Replacement of Buried Pipe Work in Storex Area – Das Island:

EPC, Detailed Design-Mainly piping & civils.

DIFC Lighthouse Tower: Involved in preliminary design and detail design drawings of the Podium Portion and 5 level basements, combined raft foundation for tower and podium. Responsible for preparing general arrangement drawings and details drawings

2CDE Dubai Marina: Involved in design drawings of the Tower. Responsible for preparing details drawings, coordinating with the Engineers on RFI (request for information).

DIFC Retail Spine: Participated in preliminary design.

Dubai Metro Project: Involved in preparing design and detail design drawings for the Depot at Jebel Ali, Deira and Qusais. Responsibility also includes coordinating with the mechanical & infrastructure department.

Flower Centre – Dubai Airport: Involved in the preparation of Structural Steel design & Detail drawings. Responsibility also includes coordination with engineers on RFI.

Jumeriah Beach Residence: Involved in preliminary design and detail design drawings of the Tower Portion. Responsible for preparing general arrangement drawings and details drawings, coordinating with engineers on RFI.

Plaxit Dry Mix Plant – Mussafah – Abu Dhabi: Involved in the preparation of Structural Steel and RCC preliminary design & detail design drawings.

Racing and Equestrian Club – Doha: Involved in the preparation of structural preliminary and detail design drawings

Cathrone Channel - Nigeria: This Project was a offshore multi level Platform, which was fabricated in USA and barged to Nigeria and assembled. I was involved in the preparation of Structural Steel design & detail drawings. Responsibilities also include the preparation of connection details and detail drawings for pipe racks & pipe bridges.

Al Raha Beach (landscaping & cafeteria) – Abu Dhabi: Involved in the preparation of design and detail drawings.

Vanopak Phase 4 : Involved in the preparation of detail drawings for the oil tank layout and foundation details for pipe racks, pipe bridges, cross over, manifold, dyke walls, truck loading & unloading bays,

Dareleh Bulk Production Terminal – Djibouti: Involved in the preparation of Structural Steel and RCC design & detail drawings.

132kV substations at Nadia & Bahyah: involved in the preparation of detailed structural drawings.

5 MGD SWRO Plant at Kindasa – Saudi Arabia: Involved in the preparation of Structural Steel design & detail drawings including the main building portal frame structure of the RO building, RO membrane racks and related other auxiliary units like control building, admin building and transformer/ switch gear building

Desalination Plant Ras Al Khaimah and Ajman: Involved in the preparation of Structural Steel & RCC design a& detail drawings for evaporator and condenser units, boiler room and chimneys

Alexandria Black Carbon – Alexandria, Egypt: Involved in the preparation & checking of Structural Steel & RCC Design & detail drawings.

Surat Lignite Power Project 2x125MW: Responsible to lead the team preparing & checking of Structural Steel Design & Detail drawings.

Dispersion Expansion Project: Responsible to lead the team preparing & checking of Structural Steel Design & Detail drawings.

Bhadravathi Modernisation Project: Responsible to lead the team, preparing & checking of Structural Steel Design & Detail drawings.

Amine Treatment Plant-27: Responsible to lead the team, preparing & checking of Structural Steel Design & Detail drawings.

2x9MW Hydro Power Project: Responsible to lead the team & preparing of Structural Steel Design & Detail drawings.

Vishaka Cement Industries: Responsible to lead the team & preparing of Structural Steel Design & Detail drawings.

Fuji Cement Project – Srilanka: Responsible to lead the team & preparing of Structural Steel Design & Detail drawings.

Sintering Plant 3 _ Bhilai Steel Plant: Responsible to lead the team & preparing of Structural Steel Design & Detail drawings.

Copper Smelting Project (Lignite & Limestone Handling Plant): Responsible to lead the team & preparing of Structural Steel Design & Detail drawings.

2x40MW Coal Based Captive Power Plant: Responsible to lead the team & preparing of Structural Steel Design & Detail drawings.

30MW Captive Power Plant – Rehla Palamua – Bihar: Responsible to lead the team & preparing of Structural Steel Design & Detail drawings.

1x210MW Panipat Thermal Power Project: Responsible to lead the team & preparing of Structural Steel Design & Detail drawings.

NTR Memorial – Hydredad Urban Authority: Involved in the preparation of structural Design & detail drawings

As Structural Technical Specialist (Revit & Cad) my responsibility were.

Modelling Structural Elements from the Architectural Model & Cad Files.

Coordinating with the Architectural Models.

Coordinating with the MEP Models.

Clash Detection.

Preparing Structural Steel & RCC Design drawings from the given Architectural drawings

Preparing Strucutral Steel Fabrication Drawings with BOQ.

Preparing Plot Plan, Plant Layout Drawings.

Preparing Piping Isometric & detail drawings with MTO.

Coordinate with the Mechanical & Electrical drawings.

Coordinate with the team members and allotting work to the team members.

Coordinating with the engineer to clarify the RFI.

AutoCAD 2016, Revit 2015-2018, Excel, Word and basic PDMS & Xsteel.