Post Job Free

Resume

Sign in

Técnico mantenimiento RF

Location:
Moctezuma 1ra Secc, Ciudad de Mexico, 15500, Mexico
Posted:
December 10, 2019

Contact this candidate

Resume:

*/ *

Francisco camacho

Tekelec –Alcatel - Huawei - Ericsson –Telcel - Modak - Tec Mahindra-

PowerA&G – TCRP – ADC –Match ldc

Location: Mexico

Education: Trunccated Civi Ingineering studies.

Experience: 19 Years, 2 Months in mobile phonne telecomunication sites CONTACT

Name: Francisco Flores camacho

Mobile Phone: +521.55 7128 6915

Country: Mexico

Email Address: ada1m9@r.postjobfree.com, ada1m9@r.postjobfree.com Last Activity: 2019-08-10 Ref.:

TARGET JOB

Target Job Title: Field Technician

Career Level: Mid Career

Target Job Location: Mexico

Employment Type: Full Time Employee

Notice Period: Immediately

PERSONAL INFORMATION

Birth Date: 4 July 1956 (Age: 62)

Gender: Male

Nationality: Mexico

Residence Country: Mexico

City: distrito federal

2/ 9

Visa Status: Citizen

Marital Status: married

Number of Dependents: 2

Driving License Issued From: Mexico

EXPERIENCE (23 YEARS, 9

MONTHS

15/03/2019

Power A&G-Mexico

Corrective and preventive

maintenance in wireless

telephone transmission sites

Claro Telcel in San Luis Potosi

Mexico

01 /08/2018 – 04/12/2018

PRESEA-Mexico

Surey site technician for ATT-

Huawei ISDP drawings, desktop

work

01 /07/2017 – 02/08/2018

Uber -Mexico

Driver

3/ 9

01 /05/2018 – 02/07/2018

company Mastec Mexico

(agency)

technical assembler of

structures in city San Luis

Potosi Mexico, maintenance

reinforcements towers

01 /08/2017 – 02/03/2018

MODAK Solutions-

Mexico

in the city of Culiacan Sinaloa Clean up works in sites, in Merida project coordination (start), R8 Merida, later site survey realization in field, campeche Tapachula and Yucatan Huawei- Telcel. 10 /10/ 2016- 15 /05/2017,

COMSET- Mexico

SUPERVISOR OF JOB in projects INDOOR IBS: Responsibilities site survey and outlines, To obtain access to the personnel that work in the project, to maintain the supply chain of material used, to supervise the works in quantity and quality, the vault, to elaborate and to give reports, Resolve and make decisions on routes and locations of wiring and built-in lines of transmission . Tests and deliveries

July 04/2015- Jun 30 2016

LCC TECH MAHINDRA- Mexico

LEADER OF GROUP LEADER OF GROUP IN ONE RAN (ERICSSON) TELCEL PROJECT: implementation of radio bases in the Mexican region 3 & 2, supply of meterial responsible for the progress in the works, reports and delivery of site

January 2012 –November2012

Match LTD telecom Trinidad & Tobago Ericsson and Huawei Sourveys Jobs with drawins and formats, for later implemanting the huawei equipment and ending with the desmantling of obsolet equipment.

Job Role: Other

TCRP- Mexico

4/ 9

Tekelec-HUAWEI - TELCEL in the period October 2009 to September 2011: HUAWEI - IUSACELL, delivery monitoring and installation of computer microwave. Telcel instruction, installation supervision of: radio-frequency, works of Civil, antennas and testing lines, under rules ERICSSON; in sites in operation Telcel adjustments; technologies: GSM, 3GUMTS, 4GLTE and Carrier Ethernet. TEKELEC-COMCEL North Coast Colombia, in four communities. Works of SWICH ensemble of the installation of cabinets, manufacture of connectors, fittings tended fixation of cabling, connection and testing of cables. April 2008 - December 2008

at Alcatel Lucent

Location: MEXICO all country

Company Industry: Telecommunications

Job Role: Other

Connection TOTAL November certification for installations Alcatel Lucent December to April 2008 projects: CDMA ZTE for TELMEX in Sinaloa and SLP monitoring the radio spectrum with Spectrum

Analyzer (site master 332D), CQT; Supervision and installation of relays 3 G Andrew, for the telephone Iusacell in different areas of the Republic Mexicana, activities of civil works, installation of telecommunications equipment and monitoring and delivery work.

ALAN DICK May 2007 Digicel-Haiti project

supervisor of RF, as supervisor of civil works. In the process of construction, alignment of Tower, measurements with tierrometros about the resistance of electric sites for Radio Bases. and impementation

April 2008 - June 2008 at Myphone-

Jamaica Alcatel CALATEL Micro wave

Job Role: Other

ITM-Mexico April to June 2008 project:

Myphone-Jamaica Alcatel CALATEL team MCX 9500 and installation work of survey, supervision of civil works for the same project in the second phase. With the post of engineer in telecommunications July 2007 - April 2008 at O &

M - Ericsson Panama

Location: Panama

Job Role: Other

O & M - Ericsson Panama in the period July 2007 - April 2008 project Digicel-Panama 5/ 9

Roll out; my role was the conduct of monitoring and work: installation, integration, and alignment of link Mini- Link TN team Ericsson, ATP's; In addition to trouble shooting, clean-up and maintenance (O & M) equipment from Ericsson RBS and

Mini-Link TN (Indoor & Outdoor) . Other

teams such as rectifiers Emerson, monitoring of generators Perkins. Many of the responsibilities include; preparation of civil work sweep Test, inventories, reports (photos, software, and IDB's screens), etc.

For the Axtel company in the cities of TORREON GOMEZ PALACIOS LERDO; adjustments of site for wimax project and installation of microwave from MNI - Mod team. Proteus ETHERNET January 2006 - December 2006

Sales Manager

at SHIKATRONICS

Job Role: Sales

SHIKATRONICS January 2006 to November in the Division of Telecomm. It is dedicated to the sale and calibration and maintenance of testing for telecommunications equipment, occupies the position of Sales Manager, Diagnostics and repair of equipment.

ETS SC CENTRO AMERICA Panama

June 2005 - may 2006

Supervisión and implementatión of equipment Ericsson Job Role: Other

TELECTRONICS Oct. 2005-Jan 2006 supervision, installation, commissioning operation, testing and delivery customer equipment PDH mini-link Ericsson for project Tel-cel IMPLETEL January to February 2004 installation and relationship of

Onda Estacionaria races in RF for the proposed

transmission lines Tel Cel team Ericsson

May 2003 - December 2003

at Ericsson WFI

Job Role: Other

WFI in December to May 2003 Mexico supervision and installation of microwave and RF

( riging) team from the BTS's Ericssonup transmission lines, project phone movilstar; cities SLP, Veracruz, Chilpancingo Gro. Siemens and Ericsson microwave equipment May 2003 - September 2003

at BTSs" Ericsson

6/ 9

Job Role: Other

May to September 2003 Guatemala CALATEL:

"BTSs" Ericsson installation as well as section Riging and evidence of ROE, in addition to supports logistics for Mili Com projects in Guatemala and telephone in the city of El Salvador equipment

September 1981 - December 1999

technical drawer at Ministry of transport and communications Company Industry: Government Sector

Job Role: Design, Creative, and Arts

Ministry of transport and communications September 1981 to Dec. 1999 in the decentralized agency “Telecomnicaciones de Mexico” of the SCT, this body had charges of:- surveyor. Cartoonist. Antennas Transrreceptoras facilities technician. satellite analyst spectrum radio project manager for the installation of the private telephone network in TELECOMM SCT. develop the post of head of area of data communication of the coordination of international systems in the Bureau of engineering and services for Tele ports. Profession of origin: Civil

Engineering

continuous training

Mux Digital Telephony

advanced mobile satellite communications

system of Radio access multiple

operation maintenance of the Northern Telecom switch the parcel of Word, Excel and Power Point of Microsoft Management.

Putting into operation of the equipment Melodie Alcatel course of Alcatel Lucent certification facilities and Tower course of installation work and operation of equipment

MCX Jamaica

course of cookingMexican

course of connectors

Andrew

7/ 9

certification DC3 for work

at heights, electrical,

rescue first aid

operation & maintenance of generators Wilson

perkins motors and clothing location encoding

and identification of infrastructure Telmex

oratory institution Garamex carefully

CERTIFICATION ATS of Ericsson for proyect ONE

RAM

8/ 9

CERTIFICATOION FOR HUAWEI 4.5G

implementation and site survey

9/ 9



Contact this candidate