Post Job Free

Resume

Sign in

Engineer Drilling

Location:
Qibla, Kuwait City, Kuwait
Posted:
December 06, 2019

Contact this candidate

Resume:

Mounir Bouhouche

Present Location: Strasbourg, France

E-Mail: ada0dh@r.postjobfree.com

Contact No.: +33-758******

DRILLING FLUIDS ENGINEER MUD ENGINEER

Rich experience in driving operations across the career with proven success in ensuring optimum results

PROFILE SUMMARY

•A Mud Engineer Professional with 9+ years of experience in a multicultural environment in Oil & Gas sector across well engineering design, supervision and execution of the Drilling/testing/completion program

•Gained expertise in DST operation of many wells, logging operation, milling operations, fishing operations and in drilling engineering operation

•Expertise in modelling and well site monitoring in Hydraulics Management and Wellbore Integrity; In depth knowledge of onshore and offshore drilling practices

•Rich exposure Deviated Horizontally Under-balance wells (UBD), Fammenian & Silurian formation and drilling with Salt saturated mud systems (CaBr2, Nacl & Cacl2)

•Proven understanding of all aspects governing planning and designing drilling activities and up to date knowledge of the latest technological advancements, health/safety norms, regulations/ guidelines and statutory compliances

•Adroitly designing and planning, drilling operations, including preparation of Statement of requirements, Basis of Design, drilling programs, detailed operations guidelines, procedures, risk assessments and technical reports

•Excellent time management skills with proven ability to work accurately and quickly prioritize, coordinate and consolidate tasks, whilst simultaneously managing the diverse range of function from multiple sources

CORE COMPETENCIES

Drilling & Well Engineering

Mud Engineering

Health & Safety Management

Cross Functional Coordination

Inventory Management

Quality Management

Audit & Inspection

Regulatory Compliances

Contract Management

Project Start-up/Tendering

Strategic Planning & Analysis

Budgeting/Forecasting

Relationship Building

Team Management

Time Management

Risk Management

Training & Mentoring

Process Improvement

ORGANISATIONAL SCAN

Since Oct 2017: ChemFOR (Drilling Fluids Company), France & Netherlands as Drilling Fluids Consultant

Feb 2017 – Sep 2017: Baroid Algeria (Halliburton Company) as Field Professional I – Drilling Fluids

Sep 2011 – Jan 2017: MI-Swaco Algeria (Schlumberger Company) as Drilling Fluid Specialist 3

Sep 2004 – Aug 2011: GesiBat as Laboratory Chemical Engineer

DOMAIN EXPERIENCE

•Operate on the various mud system, including, Versa drill system (OBM) & relaxed system, Fazepro, Flopro, Dipro & Versacore Systems, Ultra Drill System, K2CO3 / GLYCOL Mud system and Silicate potassium system

•Maintain cross functional coordination with multidisciplinary professionals to monitor progress during drilling and completion operation

•Conduct drilling programs in accordance with industry recognized technical criteria and applicable drilling regulations, to achieve the goals in a safe and cost effective manner

•Create various combinations of mud for exhausting during the different stages of the drilling process and support digging technicians in the overall safety of the drilling process

•Observe the properties of the systems and obtain approvals for treatments to maintain system properties within the specifications outlined in the company's programme

•Handle and prepare drilling fluids and brine systems as well as regularly implement pilot tests to determine appropriate treatments in the mud system

•Deliver a display of materials used and cost during the project and maintain, record consumption cost and inventory on a daily basis

•Responsible for preparing the final interval report & detailed mud recap for each well completed project including detailed technical & financial analysis, Cost Tracking, problems encountered and solution, per day, per section

•Supervise and train site personnel for the usage of mud chemicals mixing and involving potential hazards etc. Gather materials to maintain adequate stocks on location as and when required

•Maintain records of fluid for understanding discrepancies in additions and losses and account as well as track performance of solids control equipment and ensure a complete material balance during the project

•Review all necessary equipment availability and fully responsible to verify the material inventory on rig site during operations

•Interact with site personnel to obtain optimum performance of SC equipment’s and coordinate for overseeing the rig situation in field with representatives and Service Supervisors

•Implement strict clean up procedures of surface systems prior to displacing to completion fluids. Liable for Installation and operation of Mud logging unit system, installing various sensors etc.

PROJECTS HANDLED

•Shale gas project Algeria; Organization: Mi Swaco

•Geothermal project; Organization: Chemfor drilling fluids

•Holland Geothermal Project; Organization: Chemfor drilling fluids

•2 Deviated Geothermal wells in (Luttelgeest, Netherland) MD = 2200m, used Pure-Bore Glycol mud system & DIF

•Deviated Gas well in (Marboz, France, client Gas de France) MD = 2100m, used Silicate potassium mud

•2 Deviated Geothermal wells in (Paris, France, Client SMIREC) MD = 2200m, used K2CO3 / GLYCOL mud

•2 Deviated Oil well in (Loiret, France, client VERMILON) MD = 2400m, used KCL / GLYCOL mud

•HTHP wells = 190 oC & 4000 – 5000 psi at (Bechar, Tindouf, Regane, Akabli, Oulef, Adrar,) regions TVD = 4300m, we used HTHP KCL Polymer and Ultra-drill mud system.

•HTHP wells = 196 oC & 3000 – 4000 psi at (Hassi Berkin, El Bagel) regions TVD = 5550m, worked with OBM mud system.

•HORISON B formation (LD2) at (Rod el Noss & Hassi Messaoud, HGA), drilled with heavy OBM mud (d=2.10sg)

•Gas Influx (Gassi touil, In salah, Hassi Berkine). Used well control procedure

•H2S influx (in Salah). Used well control procedure

•Ballooning & breathing effects at (in-Salah and Adrar). While drilling a Deviated Horizontally Shale Gas Project

•Used and pumped I-Boss & tandem pills to control partial losses & for deviated wells in many regions

•Total down hole losses (pumped Forma Set & Forma Plug) to control the down hole losses at (Rod el Chegga)

•Hi pressure reservoir 8000 psi (Rod el Chegga, d=2.3 sg at 12’’ section) drilled with OBM mud system

•Very sensitive reservoir (In Aminas) drilling with un-weighted mud with both OBM & Ultra drill systems

•Cavings problems in (Timmimoun), we controlled the well with heavy Polymer KCL weight d=2.05 s.g

•Stuck pipe experience at Meany regions (perform mechanical back-off and drilling with sidetracks)

•Flash set while cementing casing (restoration of well with Sidetrack)

CERTIFICATION/ COURSES & TRAINING

•Certified in Basic & Advanced Mud School / Level 7 in English / well control, University Chemistry diploma

•Attend Courses of Safety, Deepwater Certification

•Trained in Safety, Well Control and Mud Systems

•Informatics training Course in (MS office, World, Excel, Power Point)

EDUCATION

•International well control forum HMD ALGERIA (Level 1), 2016

•Advanced Mud School, MI SWACO, 2016

•IFE certification & 17th assessments of deep water courses, 2015

•Basic Mud School, MI SWACO, Jan 2012

•Drilling Fluid Training at Mi Swaco, 2011

•Diploma - level 10 in English), Algerian Learning Centre, 2007

•Diploma in Industrial Chemistry, Badji Mokhtar University of Annaba, 2003

Date of Birth: 25th Mar 1978 Nationality: French Languages Known: English, French and Arabic

REFRENCES AVAILABLE ON REQUEST



Contact this candidate