Post Job Free

Resume

Sign in

Manager Welding

Location:
Egypt, AR
Salary:
6000 $
Posted:
December 06, 2019

Contact this candidate

Resume:

CURRICLUM VITAE

NAME : GIORGIO KRENN

DATE OF BIRTH : 11/07/1952

PLACE OF BIRTH : CAIRO – EGYPT

NATIONALITY : ITALIAN

MARITAL STATUS : MARRIED WITH THREE CHILDREN

RELIGION : CHRISTIAN, CATHOLIC

PHYSICAL CONDITION : EXCELLENT

PERMANENT ADDRESS : 33,MILSA BLDG-ARD EL GOLF-HELIOPLIS

PHONE NUMBER : (002-******** – MOB. 012********

E-MAIL: ada0a7@r.postjobfree.com

GRADUATED IN : ELECTRICAL /MECHANICAL ENGINEERING -1974

Driving License : UAE & International License

LANGUAGES : ITALIAN MOTHER TONGUE SPEAKING & WRITING

ENGLISH VERY GOOD SPEAKING & WRITING

ARABIC EXCELLENT SPEAKING & WRITING

FRENCH SUFFICENT SPEAKING & WRITING

SKILLS: COMPUTER SKILLS GOOD USER OF WIN XP & WORD, EXCEL 2007,

INTERNET SERVICES & PROGRAMS.

QC PIPING WELDING INSPECTOR,,ASNT LEVEL 2 NDT(RT,UT,MT,PT,VT)

PROFESSIONAL COURSES: WELDING TECHNOLOGY:GTAW,SMAW,SAW,GMAW,FCAW,

VISUAL INSPECTION, MATERIAL –METALLURGY,

FABRICATING PLANS & DRAWING

QA/QC APPROVAL PROCEURE, worked to CSWIP /AWS standards,

CODES and STANDARDS (ASME Sec II Part A & C, Sec V, Sec VIII, Sec IX, ASME

B31.3, API 1104, API 620,650, AWS D 1.1, BS, EN 15614, ANSI, ASTM

ASME Il (Materials) ASME 831.3-API 598-ASME B31.1-API-570 Piping.

CERTIFICATES OBTAINED : NDT LEVEL II-SNT-TC-1A,ISO-9712 –ARAB-NDT-

CERT-001&IAEA-TECDOC-407-EN473

NUCLEAR & RADIOLOGICAL REGULATORY AUTHORITY -EGYPT

INDUSTRIAL INSPECTION ( X & GAMMA-RAY )

Processing and interpretation of Radiographic results

MAGNETIC PARTICLE INSPECTION, DYE- PENETRANT INSPECTION,

ULTRASONIC TESTING INSPECTION, VISUAL TESTING INSPECTION,

INDUSTRY : OIL/GAS/PETROLEOM,POWER/ENERGY,REFINERY,CHIMICAL INDUST.

FERTILIZER PROJECTS,PRESSURE VESSELS,STORAGE OIL C/S

TANKS,GAS Floating roof Fixed roof, heat exchangers, columns, PIPELINE,GAS PETROCHIMICAL PROJECTS, Boiler,(Special Materials )

STEEL STRUCTURE, Weld Control and Pre-heat & PWHT,

Weld Clad Thickness Checks, Perform Hardness Tests, heat exchangers...

HOT TAPPING ON LIFE PIPE LINE,(NCR),ITP,QP,WQT,HT,

oil & gas plants barge in offshore /Onshore platforms,

Welding Processes, WPS/PQR & Welder Qualification and Weld Defects

Quality Control Procedures, Inspection Test Plan, QC Forms and Test Packs

hydro/nitrogen gas testing of Pipeline/Piping, shop drawings,

STAINLESS STEEL,RECYCLE-UREA, SOLUTION,AMMONIA TANKS,

Staff Category ( S1) designation as ( Senior Surveyor )

Welding Piping & Pipe Line offshore /Onshore, Platforms,

Welding Tanks / LNG / Spheres, NDT Senior Inspector,

TPI Team Leader, Ass. QA/QC Manager,

EXPERIENCE

Period : From 01-11-2017 – till 28/02/2018

Owner : Hellenic Gas Transmission System Operator ( DESFA ) S.A.

Contractor : J&P AVAX S.A

T.P.I. : TUV – AUSTRIA HELLAS LTD.

MOODY TOTTRUP HELLAS S.A.

Project : Constriction of Third LNG storage tank with a capacity of

95000 m3 at Revithoussa Island - Greece

Position : QA/QC TPI Inspector / Technical Consultant Inspection of field

Work ( Erection, Welding, Testing NDT, LNG Expert,

Responsible : Review of submitted documentation (working procedures,certificate )

regarding the construction of the inner tank

Monitoring of erecting and welding activities of the inner tank construction

Welding Inspection & NDT (PT,VBT)

Qualification of Welders and Welding operators according to EN ISO

9606-1 & EN ISO 14732

Qualification of welding procedures according to EN ISO 15614-1

Inspection of materials storage conditions on site

Technical support regarding the construction of inner tank

Present job / IRAQ LUKOIL COMPANY,

From10 Jan 15 to 11/7/16 West Qurna/2 Joint project,

Position : QA/QC (TPI) TEAM LEADER & Ass. QA/QC Manager

BUREAU VERITAS

ABU DHABI ABU DHABI OIL REFINING COMPANY (TAKREER)

RUWAIS REFINERY RUWAIS REFINERY EXPANSION

From : 1/4/2013 up to 31-12-14 PROJECT-EPC 4 (TANK FARM)

POSITION : QA/QC (TPI) TEAM LEADER & Ass. QA/QC Manager

BUREAU VERITAS

ACTIVITIES : FABRICATION OF 76 TANKS AS PER FOLLOW.

GRUDE TANKS N 3

INTERMEDIATE STORAGE N 29

PRODUCT STORAGE N 25

SPHERES N 11

PROPYLENE STORAGE N 3

OTHER TANKS N 5

TOTAL CAPACITY 4.5Million m3

INTERCONNECTING PIPING 415 Km

Above Ground Steel :284 Km

Below Ground Steel : 72 Km

Above Ground GRE : 17 Km

Below Ground GRE : 39 Km

Below Ground PVC :2.4 Km

KHALDA PETROLEUM COMPANY

FROM:1/10/ 09 up

TO:31/12/2012, FABRICATION OF FEFTEEN NEW Fixed roof

EL ALAMEIN-EGYPT Crud oil Tanks 25,OOO BBL (KHALABSHA-KHEPRI-

ABIES WORK SHOP ALEX, MELEHA-UMBARCA ) FILD WEST DESERT

FABRICATION OF FLARE & DESALTER PIPE RACK

IN ABIES PETROJET WORK SHOP ALEX

Resident Client Q.C. Project Inspector

WITNESS AND RESPONSIBILE FOR W.P.S. & P.Q.R

FOR PIPING & TANKS W.Q.T. RESPONSIBILE AND

WITNESS FOR WELDERS QUALIFICATION TEST

WELDING PREPARATION AND WITNESS CERTIFICATE.

FOR ALL N.D.T METHOD, DESRUCTIVE TEST.

FABRICATION AND EREACTION SPECIAL MATERIAL

TECHNICAL, DOCUMENTS,PROJECT SPECIFICATION,DESIN AND

SHOP DRAWING FOR ABOVE WORK,HANDING OVER OF THE MECHANICAL

COMPLETION AND COMMISSIONING CERTIFICATION,FOLLOW UP( NSR),

PUNCH LISTING AND RELEVANT CLEARING, Quality documentation,

WITNESS AND RESPONSIBILE FOR ( P.W.H.T. )

reading isometric drawings, carrying out dimensional inspection, witness of hydrotest and review and approval of certification.

FROM :11/7/08-15/9/09 Siirtec Nigi S.p.a. ITALY

EGYPT-KATTAMIA-IDKO Engineering Cont. Manufacturers

Resident Client Q.A.Q.C.

Project Inspector

TSA PACKAGE MODIFICATION PROJECT

BURULLUS GAS COMPANY-REFINERY

FABRICATION OF TWO ADSORBERS &

FOUR FILTERS (COALESHING-DUST )

IN KATTAMIA PETROJET WORK SHOP

AND PIPING FABRICATION IN IDKO SITE

AND STELL STRUCTURE FABRICATION & ERECTION FOR

PIPE RACK & AIR COOLER EQUIPMENT ON SITE IDKO

NCR, documentation. Client interface, flux/distribution,

welding summary list, punch list, test pack, etc.)

HANDING OVER OF THE MECHANICAL COMPLETION AND

COMMISSIONING CERTIFICATION, Quality documentation,

WITNESS AND RESPONSIBILE FOR ( P.W.H.T. )

reading isometric drawings, carrying out dimensional inspection, witness of hydrotest and review and approval of certification.

NDT CONGO-PMS- ITALY FROM 1/2/08 TILL 30/6/08

OFFSHORE OIL PLATFORM CONGO-POINTE NOIR AGIP- RECHERCHE-CONGO

. Q.C. & NDT MANAGER

. INDUSTRIAL DIAGNOSTIC

. STANDARD TESTS

. INSP. CHEKING OF THERM. TREAT.

. WELD. PROCESS & QUALIFICATION

. NDT CONTROLS, Quality documentation

FROM 1/3/2007 MOPCO AMMONIA / UREA

TO 15/1/08 FERTILIZER PROJECT

DAMIAT- EGYPT DAMIETTA – EGYPT

ASSITANT QA/QC & NDT MANAGER

WITNESS AND RESPONSIBILE FOR W.P.S. & P.Q.R

FOR PIPING & W.Q.T. RESPONSIBILE AND WITNESS

FOR WELDERS QUALIFICATION TEST, WELDERS

CERTIFICATE QUALIFICATION TEST, WELDERS

PREPARATION AND WITNESS CERTIFICATE.

FOR ALL N.D.T METHOD, DESRUCTIVE TEST.

INSPECTION FOR PIPING, EQUIPMENT

FABRICATION AND EREACTION SPECIAL MATERIAL.

SOLVING ALL JOB SITE PROBLEMS

TECHNICAL, DOCUMENT RESPONSIBLE FOR

WELDERS PRODUCTION, POST HEAT TREATMENT

PRODUCTION HOURS PER DAY. Quality documentation,

DEALING WITH ISOMETRICS DRAWINGS FOR

DIFERENT ITEMS, DRAWING ASBUILT ISOMETRICS,

PIPING MATERIAL AS X20 CRMO,X10 CRMO

13CRMO44, 10CRMO910, DUPLEX, SUPER DUPLEX,

INCOLLOY 800H, INCONAL AND ALL TYPES OF

STAINESSTEEL, ALL TYPES OF CARBON STEEL

Carbon Steel, Alloy Steel Construction,

EQUIPMENT AS BOILER, REFORMER, ETS

NCR, documentation. Client interface, flux/distribution,

welding summary list, punch list, test pack, etc.)

reading isometric drawings, carrying out dimensional inspection, witness of hydro test and review and approval of certification.

From 1/7/2006 AGIBA PETROLIUM Co. + PETROBEL

TO 27/2/2007 Q.C. WELDING INSPECTOR

FABRICATION OF Ten NEW Fixed roof 25,000 BBL,

WEST DESERT & RED SEA STOREGE Crud oil Tanks & PIPE LINE ON/OFFSHORE

WITNESS AND RESPONSIBILE FOR W.P.S. & P.Q.R

CERTIFICATE QUALIFICATION TEST, WELDERS

PREPARATION AND WITNESS CERTIFICATE.

FOR ALL N.D.T METHOD, DESRUCTIVE TEST.

INSPECTION FOR PIPING, Quality documentation

WITNESS AND RESPONSIBILE FOR ( P.W.H.T. )

10/7/2001 – 15/6/2007 DSD FERRO METALCO

EGYPT – BELBEIS

HEAD OF WELDING APPLICATION & INSPECTION

FOR STEEL STRUCTION & HIGH PRESSURE VESSEL

& PIPE LINE

UNION FENOSA SEGAS

LNG TANKS ( 2X150.000m3 ) LIQUIFIED NATURAL

GAS PROJECT AT DAMIETTA

INNER SHELL 9% NI & INTERNAL + EXTERNAL PIPE

Efkilidis Bridge – ATHENCE

Erection, Inspection, Testing, Steel Structure,Stud Welding,

,

Q.C. AND NDT INSPECTION

CAIRO NORTH POWER STATION

2 HRSGs 750 MW & ALL HARPS & GASING

LP- IP – HP DRUMS & DUCTS & STACKS

HEAT EXCHANGERS SURFACE CONDENCERS

HEAT RRECOVERY, Quality documentation,

1/2001 – 30/6/2001 FIN-CIMEC AT THE PROJECT OF AMOC ( MINERAL

ALEX. – MAX- WADI LUBE OIL COMPANY ) UNDER SUPERVISION OF

EL KAMAR FOSTER WEELER FRANCE

Q.A./Q.C. INSPECTOR

RESPONSIBLE FOR:;

SUPEERV. THE PUNCH LIST

WITNESS HYDRO TESTING

FINAL DOCUMENTATION & RELEASE

RT – INTERPRETION

WELDEMENT VISUAL INSPECTION

UT –MT- PT INSPECTION. Quality documentation,

NCR, documentation. Client interface, flux/distribution,

welding summary list, punch list, test pack, et )

1/1/2000 – 20/12/2000 PETROBEL PORT SAID & EL ARISH

EL ARISH-EGYPT SENIOR WELDING INSPECTOR

PROJECT ACTIVITIES

36 Inch. INTER-SINAI GAS PIPE LINE (250KM)

FROM PORT-SAID TO EL-ARISH TERMINAL

PORT-FOUAD GAS PLANT (N.P.S.C.) UP-GRINDING

GAS COMPRESSION UNIT FOR PROCESS SKID

RESPONSIBLE FOR:

REVIEWING THE WELDING PROCEDURES

WELDER PERFORMANCES TESTS

RT INTERPRETATION

WITNESS HYDRO TESTING

FINAL DOCUMENTATION RELEASE

SUPERVISION OF PIPELINES FABRICATION &

ECECTION STAGES

WELMENT VISUAL INSPECTION

SUPERVISION FOR HEAT-TREATMENT

UT-PT-MT INSPECTION, Quality documentat

09/1999 -12/1999 IEMSA IMPIANTI

SUEZ – EGYPT QUALITY CONTROLLER

PROJECT ACTIVITIES

FERTILIZER PLANT

PREFABRICATION & INSTALLATION OF

STAINLESS STEEL TANKS RECYCLE-UREA

SOLUTION TANKS- AMMONIA TANKS-

BOILER- REFORMER – STANLESS STEEL &

CARBON STEEL PIPING –X20 PIPING-HEAT

TREATMENT – SUPPORTS –CROMO PIPING-

PVC PIPING, Quality documentation,

NCR, documentation. Client interface, flux/distribution

welding summary list, punch list, test pack, et )

reading isometric drawings, carrying out dimensional inspection, witness of hydrotest and review and approval of certification.

15/6/1997- 9/1999 POULYTEC CO. LTD

EGYPT ELECTRIC ENGINEER

PROJECT ACTIVITIES:

MULTIFUNCATION SYSTEM FOR CLIMATE CONTROL

FOR VENTILATION & COOLING & HEATING FOR POULTRY

& BREEDERS & BOILERS & QUAILS HOUSES AND GREEN

HOUSES ALL UNDER AUTOMATIC ELECTRIC CONTROL PLANET.

5/1996- 6/1997 J & P ( OVERSEAS ) LTD

LIBYA INSPECTION CONTROLLER

PROJECT ACTIVITIES:

1-TOBRUK TREMINAL

1- PREFABRICATION OF NEW FOAM & RING FIRE FIGHTING

SYSTEM AT MARSA EL HARIGA FOR ALL TANK FARM 2" – 4"

6" – 8" PIPE LINE, Quality documentation,

2- BENGHAZI- GHANFUODA TERMINAL

PREFABRICATION & INSTALLATION OF NEW PIPE LINE 6" – 8"

10" FOR FIGHTING SYSTEM ON ALL TANKS AREA AND WERE

HOUSE.,

RESPONSIBLE

MT- DT-RT-INSPECTION

DIMENSION CHECK

LEVEL CHECH, Quality documentation,

WELMENT VISUAL INSPCTION

REVIEWING THE WELDING PROCEDURES

WELDERS PERFORMANCE TESTS

RT- INTERPRETATION

15/9/1995- 30/4/1996 POULEX CO. LTD

EGYPT ELECTRIC ENGIEER FOR VENT . & COOLING & HEATING

SYSTEM FOR POULTRY HOUSES

31/3/1991- 25/5/1995 J & P ( OVERSEAS ) LTD

LIBYA INSPECTION CONTROLLER

PROJECT ACTIVITIES:

1- SIRTE OIL COMPANY

REPLACEMFNT OF VALVES 34" & INSTALLING SPLIT- TEES 34" &

30" FITING TO ALIVES 34" OIL PIPE LINE ( SIX MILLION CUBIC

FEET PER HOURE) & WELDING OF TWENTY NOZZLES 2"-4"-6"

WITH REINFORCING PAD ( HOT & COLD WORK ) FILLENT WELD.

HOT-TAPPING ON PIPE LINE 34” GASE LIFE LINE

DUTIES INCLUDED FULL CONTROL OF N.D.T. FORMULATION

OF PROCEDURES FOR WORK ACTIVITIES & RECORDS &

CONTROL OF ALL HYDROTESTING AND APPROVAL OF ALL

INSPECTION REPORTS.

SUPERVISION FOR PREHEATING POST WELD HEATING & HEAT

TREATMENT. Quality documentation,

2- TOBRUK TERMINAL :

UPGRINDING THE FIRE FIGHTING SYSTEM AT MARSA EL HARIGA

TERMINAL TOBROUK FOR ARABIN GULF OIL COMPANY

TOW PUMP STATIONS & ABOVE GROUND INASTALLATION OF

PIPE LINES 8" – 12" – 20" – 24" EPOXY AND CEMENT LINE

ERECTION OF WATER OAIE CAPACTTY 3770M3. NDT DOCUMENTATION

CONTROL WITH SUPERVISION & TESTING OF ALL

WELDERS & DIMENTIONAL CHEKING LEVELING . HYDROSTATIC

& MECHANICAL TESTING & MPI SCANNING & INTERPRETATIC

OF FILM. D.P.T. REVIEWED ALL WELDING AND SAFETY OFFICER

PREPARATION OF THE HOT WORK PERMIT, Quality documentation,

3- SARIR AREA

INSTALLATION & WELDING OF GAS PIPE LINE 8" X 5.5.MM (91

KM) – RT INTERPRETATION FILM WELDER PERFORMANCE – UT

PT. MT. INSPECTION., Quality documentation,

4- AZAAWIA TERMINAL :

PREFABRAICATION & INSTALLATION OF TANK FARM REVIEWING

THE WELDING PROCEDURE – NDT INSPECTION – WELDMENT

VISUAL INSPECTION ., Quality documentation,

1/9/1982- 30/3/1991 ITALIAN INSTITUTE OF DON BOSCO

CAIRO – EGYPT WELDING INSTRUCTOR

PROFESSIONAL COURSES OF WELDING WITH ALL POSITIONS &

QUALIFICATION OF WELDERS & MECHANICAL TRADES VISUAL

INSPECTION COURSES

1/5/1982- 30/8/1982 FACCO COMPANY

FAYOUM - EGYPT SITE ENGINEER

PROJECT ACTIVITIES

PREFABRICATION & INSTALLATION OF POULTRY HANGER

CONNECTION OF ALL ELECTRICAL SYSTEM AUTOMATIC &

MANUAL CONTROL.

1/2/1982-30/4/1982 FOCHI COMPANY

HELWAN – CAIRO INSPECTION CONTROLLER

EGYPT PROJECT ACTIVITIES

INSTALLATION OF NEW PIPELINES LAYING IN SIDE THE CEMENT

FACTORY IN HELWAN – CAIRO. REVIEW & RECORDING OF ALL

DAILY PROGRESS OF WORKS PLANNING OF MAN POWER

REQUIREMENTS EQUIPMENT FOR PROJECT DURATION

15/9/1978- 15/12/1981 MONTUBI COMPANI

RAS GHAREB ASS. WELDING INSPECTOR

KANTARAH SHARK PROJECT ACTIVITIES

ABU REDES –RED SEA PREFABRICATION & INSTALLATION & WELDING OIL

PLATFORMS WITH DIFFERENT SIZE ( 24" -30" -36") &

LENGTHS (20 – 64M) & THICKNESS ( 25 -30 – 36 MM )

THREE – FOUR – SIX LEGS ) WITH CELLAR DECK . MAIN

DECK & HELLY DECH. INSTALLATION OF NEW PIPE LINES

8"-10" ONSHORE/OFFSHORE SUPERVISION & TESTING OF

ALL WELDERS AND THE DAILY ACTIVITIES OF ALL PROGRES

MECHANICAL TESTING M.P.I. & D.P.T. RADIOGRAPHIC

INTERPRETATION & WELDMENT VISUAL INSPECTION

REVIEWING THE WELDING PROCEDURES

1/2/1978- 30/8/1978 MONTUBI COMPANY

NIGERIA- KADOUNA ASS.WELDING INSPECTOR

WARRI PROJECT ACTIVITIES:

PORT- HARCOURT INSTALLATION OF NEW PIPE LINE 600 KM x 10”X 12 M/M

FROM WARRI TO NIGER – KADUNA.

SUPERVISION & TESTING OF ALL WELDERS AND THE DAILY

ACTIVITIES OF ALL PROGRES, MECHANICAL TESTING

MPI.-DPT-RT-UT-, RADIOGRAPHIC INTERPRETATION

REVIEWING THE WELDING PROCEDURES

WELDMENT VISUAL INSPECTION, Quality documentation,

1/1/1976- 25/6/1977 C.I.M.I. COMPANY

SUEZ WELDING COTROLER

ELEIN- SOUKHNA PROJECT ACTIVITIES:

EGYPT INST.& FABRIC. OF NEW Floating roof TANK FARM.

TWELVE CRUD OIL TANKS – CAPACTY 120.000 T,

AND ONE WATER NK- CAPACITY 4000 M3.

INSTALLATION OF UNDERGROUND PIPES FROM 8 TO

36" PREFABRACTION OF PIPE/STEEL SUPPORTS AND

BRAKETS PUMP STATIONS AND ABOVE GROUND

INSTALLATION INVOLVING NUMERUS TYPES OF

WELDING PROGRESSES ALL POSITIONS

WELDMENT VISUAL INSPECTION, Quality documentation,

1/2/1974- 1/11/1975 CAIRO SHERATON HOTEL

CAIRO – EGYPT ASS. ELECT. ENGINEER

WORKING IN ENGINEERING DEPARTMENT TO

CONTROL AND SUPERVISE ALL THE ELECTRIC INSTRUMENTS

IN THE HOTEL .AIR- CONDITION LIGHTS.

REFRIGERATORS. HEATERS. LIGHT SYSTEM. TELECOMAND. ETC

YOUR FAITHFULLY

GIORGIO KRENN



Contact this candidate