CURRICLUM VITAE
NAME : GIORGIO KRENN
DATE OF BIRTH : 11/07/1952
PLACE OF BIRTH : CAIRO – EGYPT
NATIONALITY : ITALIAN
MARITAL STATUS : MARRIED WITH THREE CHILDREN
RELIGION : CHRISTIAN, CATHOLIC
PHYSICAL CONDITION : EXCELLENT
PERMANENT ADDRESS : 33,MILSA BLDG-ARD EL GOLF-HELIOPLIS
PHONE NUMBER : (002-******** – MOB. 012********
E-MAIL: ***********@*****.***
GRADUATED IN : ELECTRICAL /MECHANICAL ENGINEERING -1974
Driving License : UAE & International License
LANGUAGES : ITALIAN MOTHER TONGUE SPEAKING & WRITING
ENGLISH VERY GOOD SPEAKING & WRITING
ARABIC EXCELLENT SPEAKING & WRITING
FRENCH SUFFICENT SPEAKING & WRITING
SKILLS: COMPUTER SKILLS GOOD USER OF WIN XP & WORD, EXCEL 2007,
INTERNET SERVICES & PROGRAMS.
QC PIPING WELDING INSPECTOR,,ASNT LEVEL 2 NDT(RT,UT,MT,PT,VT)
PROFESSIONAL COURSES: WELDING TECHNOLOGY:GTAW,SMAW,SAW,GMAW,FCAW,
VISUAL INSPECTION, MATERIAL –METALLURGY,
FABRICATING PLANS & DRAWING
QA/QC APPROVAL PROCEURE, worked to CSWIP /AWS standards,
CODES and STANDARDS (ASME Sec II Part A & C, Sec V, Sec VIII, Sec IX, ASME
B31.3, API 1104, API 620,650, AWS D 1.1, BS, EN 15614, ANSI, ASTM
ASME Il (Materials) ASME 831.3-API 598-ASME B31.1-API-570 Piping.
CERTIFICATES OBTAINED : NDT LEVEL II-SNT-TC-1A,ISO-9712 –ARAB-NDT-
CERT-001&IAEA-TECDOC-407-EN473
NUCLEAR & RADIOLOGICAL REGULATORY AUTHORITY -EGYPT
INDUSTRIAL INSPECTION ( X & GAMMA-RAY )
Processing and interpretation of Radiographic results
MAGNETIC PARTICLE INSPECTION, DYE- PENETRANT INSPECTION,
ULTRASONIC TESTING INSPECTION, VISUAL TESTING INSPECTION,
INDUSTRY : OIL/GAS/PETROLEOM,POWER/ENERGY,REFINERY,CHIMICAL INDUST.
FERTILIZER PROJECTS,PRESSURE VESSELS,STORAGE OIL C/S
TANKS,GAS Floating roof Fixed roof, heat exchangers, columns, PIPELINE,GAS PETROCHIMICAL PROJECTS, Boiler,(Special Materials )
STEEL STRUCTURE, Weld Control and Pre-heat & PWHT,
Weld Clad Thickness Checks, Perform Hardness Tests, heat exchangers...
HOT TAPPING ON LIFE PIPE LINE,(NCR),ITP,QP,WQT,HT,
oil & gas plants barge in offshore /Onshore platforms,
Welding Processes, WPS/PQR & Welder Qualification and Weld Defects
Quality Control Procedures, Inspection Test Plan, QC Forms and Test Packs
hydro/nitrogen gas testing of Pipeline/Piping, shop drawings,
STAINLESS STEEL,RECYCLE-UREA, SOLUTION,AMMONIA TANKS,
Staff Category ( S1) designation as ( Senior Surveyor )
Welding Piping & Pipe Line offshore /Onshore, Platforms,
Welding Tanks / LNG / Spheres, NDT Senior Inspector,
TPI Team Leader, Ass. QA/QC Manager,
EXPERIENCE
Period : From 01-11-2017 – till 28/02/2018
Owner : Hellenic Gas Transmission System Operator ( DESFA ) S.A.
Contractor : J&P AVAX S.A
T.P.I. : TUV – AUSTRIA HELLAS LTD.
MOODY TOTTRUP HELLAS S.A.
Project : Constriction of Third LNG storage tank with a capacity of
95000 m3 at Revithoussa Island - Greece
Position : QA/QC TPI Inspector / Technical Consultant Inspection of field
Work ( Erection, Welding, Testing NDT, LNG Expert,
Responsible : Review of submitted documentation (working procedures,certificate )
regarding the construction of the inner tank
Monitoring of erecting and welding activities of the inner tank construction
Welding Inspection & NDT (PT,VBT)
Qualification of Welders and Welding operators according to EN ISO
9606-1 & EN ISO 14732
Qualification of welding procedures according to EN ISO 15614-1
Inspection of materials storage conditions on site
Technical support regarding the construction of inner tank
Present job / IRAQ LUKOIL COMPANY,
From10 Jan 15 to 11/7/16 West Qurna/2 Joint project,
Position : QA/QC (TPI) TEAM LEADER & Ass. QA/QC Manager
BUREAU VERITAS
ABU DHABI ABU DHABI OIL REFINING COMPANY (TAKREER)
RUWAIS REFINERY RUWAIS REFINERY EXPANSION
From : 1/4/2013 up to 31-12-14 PROJECT-EPC 4 (TANK FARM)
POSITION : QA/QC (TPI) TEAM LEADER & Ass. QA/QC Manager
BUREAU VERITAS
ACTIVITIES : FABRICATION OF 76 TANKS AS PER FOLLOW.
GRUDE TANKS N 3
INTERMEDIATE STORAGE N 29
PRODUCT STORAGE N 25
SPHERES N 11
PROPYLENE STORAGE N 3
OTHER TANKS N 5
TOTAL CAPACITY 4.5Million m3
INTERCONNECTING PIPING 415 Km
Above Ground Steel :284 Km
Below Ground Steel : 72 Km
Above Ground GRE : 17 Km
Below Ground GRE : 39 Km
Below Ground PVC :2.4 Km
KHALDA PETROLEUM COMPANY
FROM:1/10/ 09 up
TO:31/12/2012, FABRICATION OF FEFTEEN NEW Fixed roof
EL ALAMEIN-EGYPT Crud oil Tanks 25,OOO BBL (KHALABSHA-KHEPRI-
ABIES WORK SHOP ALEX, MELEHA-UMBARCA ) FILD WEST DESERT
FABRICATION OF FLARE & DESALTER PIPE RACK
IN ABIES PETROJET WORK SHOP ALEX
Resident Client Q.C. Project Inspector
WITNESS AND RESPONSIBILE FOR W.P.S. & P.Q.R
FOR PIPING & TANKS W.Q.T. RESPONSIBILE AND
WITNESS FOR WELDERS QUALIFICATION TEST
WELDING PREPARATION AND WITNESS CERTIFICATE.
FOR ALL N.D.T METHOD, DESRUCTIVE TEST.
FABRICATION AND EREACTION SPECIAL MATERIAL
TECHNICAL, DOCUMENTS,PROJECT SPECIFICATION,DESIN AND
SHOP DRAWING FOR ABOVE WORK,HANDING OVER OF THE MECHANICAL
COMPLETION AND COMMISSIONING CERTIFICATION,FOLLOW UP( NSR),
PUNCH LISTING AND RELEVANT CLEARING, Quality documentation,
WITNESS AND RESPONSIBILE FOR ( P.W.H.T. )
reading isometric drawings, carrying out dimensional inspection, witness of hydrotest and review and approval of certification.
FROM :11/7/08-15/9/09 Siirtec Nigi S.p.a. ITALY
EGYPT-KATTAMIA-IDKO Engineering Cont. Manufacturers
Resident Client Q.A.Q.C.
Project Inspector
TSA PACKAGE MODIFICATION PROJECT
BURULLUS GAS COMPANY-REFINERY
FABRICATION OF TWO ADSORBERS &
FOUR FILTERS (COALESHING-DUST )
IN KATTAMIA PETROJET WORK SHOP
AND PIPING FABRICATION IN IDKO SITE
AND STELL STRUCTURE FABRICATION & ERECTION FOR
PIPE RACK & AIR COOLER EQUIPMENT ON SITE IDKO
NCR, documentation. Client interface, flux/distribution,
welding summary list, punch list, test pack, etc.)
HANDING OVER OF THE MECHANICAL COMPLETION AND
COMMISSIONING CERTIFICATION, Quality documentation,
WITNESS AND RESPONSIBILE FOR ( P.W.H.T. )
reading isometric drawings, carrying out dimensional inspection, witness of hydrotest and review and approval of certification.
NDT CONGO-PMS- ITALY FROM 1/2/08 TILL 30/6/08
OFFSHORE OIL PLATFORM CONGO-POINTE NOIR AGIP- RECHERCHE-CONGO
. Q.C. & NDT MANAGER
. INDUSTRIAL DIAGNOSTIC
. STANDARD TESTS
. INSP. CHEKING OF THERM. TREAT.
. WELD. PROCESS & QUALIFICATION
. NDT CONTROLS, Quality documentation
FROM 1/3/2007 MOPCO AMMONIA / UREA
TO 15/1/08 FERTILIZER PROJECT
DAMIAT- EGYPT DAMIETTA – EGYPT
ASSITANT QA/QC & NDT MANAGER
WITNESS AND RESPONSIBILE FOR W.P.S. & P.Q.R
FOR PIPING & W.Q.T. RESPONSIBILE AND WITNESS
FOR WELDERS QUALIFICATION TEST, WELDERS
CERTIFICATE QUALIFICATION TEST, WELDERS
PREPARATION AND WITNESS CERTIFICATE.
FOR ALL N.D.T METHOD, DESRUCTIVE TEST.
INSPECTION FOR PIPING, EQUIPMENT
FABRICATION AND EREACTION SPECIAL MATERIAL.
SOLVING ALL JOB SITE PROBLEMS
TECHNICAL, DOCUMENT RESPONSIBLE FOR
WELDERS PRODUCTION, POST HEAT TREATMENT
PRODUCTION HOURS PER DAY. Quality documentation,
DEALING WITH ISOMETRICS DRAWINGS FOR
DIFERENT ITEMS, DRAWING ASBUILT ISOMETRICS,
PIPING MATERIAL AS X20 CRMO,X10 CRMO
13CRMO44, 10CRMO910, DUPLEX, SUPER DUPLEX,
INCOLLOY 800H, INCONAL AND ALL TYPES OF
STAINESSTEEL, ALL TYPES OF CARBON STEEL
Carbon Steel, Alloy Steel Construction,
EQUIPMENT AS BOILER, REFORMER, ETS
NCR, documentation. Client interface, flux/distribution,
welding summary list, punch list, test pack, etc.)
reading isometric drawings, carrying out dimensional inspection, witness of hydro test and review and approval of certification.
From 1/7/2006 AGIBA PETROLIUM Co. + PETROBEL
TO 27/2/2007 Q.C. WELDING INSPECTOR
FABRICATION OF Ten NEW Fixed roof 25,000 BBL,
WEST DESERT & RED SEA STOREGE Crud oil Tanks & PIPE LINE ON/OFFSHORE
WITNESS AND RESPONSIBILE FOR W.P.S. & P.Q.R
CERTIFICATE QUALIFICATION TEST, WELDERS
PREPARATION AND WITNESS CERTIFICATE.
FOR ALL N.D.T METHOD, DESRUCTIVE TEST.
INSPECTION FOR PIPING, Quality documentation
WITNESS AND RESPONSIBILE FOR ( P.W.H.T. )
10/7/2001 – 15/6/2007 DSD FERRO METALCO
EGYPT – BELBEIS
HEAD OF WELDING APPLICATION & INSPECTION
FOR STEEL STRUCTION & HIGH PRESSURE VESSEL
& PIPE LINE
UNION FENOSA SEGAS
LNG TANKS ( 2X150.000m3 ) LIQUIFIED NATURAL
GAS PROJECT AT DAMIETTA
INNER SHELL 9% NI & INTERNAL + EXTERNAL PIPE
Efkilidis Bridge – ATHENCE
Erection, Inspection, Testing, Steel Structure,Stud Welding,
,
Q.C. AND NDT INSPECTION
CAIRO NORTH POWER STATION
2 HRSGs 750 MW & ALL HARPS & GASING
LP- IP – HP DRUMS & DUCTS & STACKS
HEAT EXCHANGERS SURFACE CONDENCERS
HEAT RRECOVERY, Quality documentation,
1/2001 – 30/6/2001 FIN-CIMEC AT THE PROJECT OF AMOC ( MINERAL
ALEX. – MAX- WADI LUBE OIL COMPANY ) UNDER SUPERVISION OF
EL KAMAR FOSTER WEELER FRANCE
Q.A./Q.C. INSPECTOR
RESPONSIBLE FOR:;
SUPEERV. THE PUNCH LIST
WITNESS HYDRO TESTING
FINAL DOCUMENTATION & RELEASE
RT – INTERPRETION
WELDEMENT VISUAL INSPECTION
UT –MT- PT INSPECTION. Quality documentation,
NCR, documentation. Client interface, flux/distribution,
welding summary list, punch list, test pack, et )
1/1/2000 – 20/12/2000 PETROBEL PORT SAID & EL ARISH
EL ARISH-EGYPT SENIOR WELDING INSPECTOR
PROJECT ACTIVITIES
36 Inch. INTER-SINAI GAS PIPE LINE (250KM)
FROM PORT-SAID TO EL-ARISH TERMINAL
PORT-FOUAD GAS PLANT (N.P.S.C.) UP-GRINDING
GAS COMPRESSION UNIT FOR PROCESS SKID
RESPONSIBLE FOR:
REVIEWING THE WELDING PROCEDURES
WELDER PERFORMANCES TESTS
RT INTERPRETATION
WITNESS HYDRO TESTING
FINAL DOCUMENTATION RELEASE
SUPERVISION OF PIPELINES FABRICATION &
ECECTION STAGES
WELMENT VISUAL INSPECTION
SUPERVISION FOR HEAT-TREATMENT
UT-PT-MT INSPECTION, Quality documentat
09/1999 -12/1999 IEMSA IMPIANTI
SUEZ – EGYPT QUALITY CONTROLLER
PROJECT ACTIVITIES
FERTILIZER PLANT
PREFABRICATION & INSTALLATION OF
STAINLESS STEEL TANKS RECYCLE-UREA
SOLUTION TANKS- AMMONIA TANKS-
BOILER- REFORMER – STANLESS STEEL &
CARBON STEEL PIPING –X20 PIPING-HEAT
TREATMENT – SUPPORTS –CROMO PIPING-
PVC PIPING, Quality documentation,
NCR, documentation. Client interface, flux/distribution
welding summary list, punch list, test pack, et )
reading isometric drawings, carrying out dimensional inspection, witness of hydrotest and review and approval of certification.
15/6/1997- 9/1999 POULYTEC CO. LTD
EGYPT ELECTRIC ENGINEER
PROJECT ACTIVITIES:
MULTIFUNCATION SYSTEM FOR CLIMATE CONTROL
FOR VENTILATION & COOLING & HEATING FOR POULTRY
& BREEDERS & BOILERS & QUAILS HOUSES AND GREEN
HOUSES ALL UNDER AUTOMATIC ELECTRIC CONTROL PLANET.
5/1996- 6/1997 J & P ( OVERSEAS ) LTD
LIBYA INSPECTION CONTROLLER
PROJECT ACTIVITIES:
1-TOBRUK TREMINAL
1- PREFABRICATION OF NEW FOAM & RING FIRE FIGHTING
SYSTEM AT MARSA EL HARIGA FOR ALL TANK FARM 2" – 4"
6" – 8" PIPE LINE, Quality documentation,
2- BENGHAZI- GHANFUODA TERMINAL
PREFABRICATION & INSTALLATION OF NEW PIPE LINE 6" – 8"
10" FOR FIGHTING SYSTEM ON ALL TANKS AREA AND WERE
HOUSE.,
RESPONSIBLE
MT- DT-RT-INSPECTION
DIMENSION CHECK
LEVEL CHECH, Quality documentation,
WELMENT VISUAL INSPCTION
REVIEWING THE WELDING PROCEDURES
WELDERS PERFORMANCE TESTS
RT- INTERPRETATION
15/9/1995- 30/4/1996 POULEX CO. LTD
EGYPT ELECTRIC ENGIEER FOR VENT . & COOLING & HEATING
SYSTEM FOR POULTRY HOUSES
31/3/1991- 25/5/1995 J & P ( OVERSEAS ) LTD
LIBYA INSPECTION CONTROLLER
PROJECT ACTIVITIES:
1- SIRTE OIL COMPANY
REPLACEMFNT OF VALVES 34" & INSTALLING SPLIT- TEES 34" &
30" FITING TO ALIVES 34" OIL PIPE LINE ( SIX MILLION CUBIC
FEET PER HOURE) & WELDING OF TWENTY NOZZLES 2"-4"-6"
WITH REINFORCING PAD ( HOT & COLD WORK ) FILLENT WELD.
HOT-TAPPING ON PIPE LINE 34” GASE LIFE LINE
DUTIES INCLUDED FULL CONTROL OF N.D.T. FORMULATION
OF PROCEDURES FOR WORK ACTIVITIES & RECORDS &
CONTROL OF ALL HYDROTESTING AND APPROVAL OF ALL
INSPECTION REPORTS.
SUPERVISION FOR PREHEATING POST WELD HEATING & HEAT
TREATMENT. Quality documentation,
2- TOBRUK TERMINAL :
UPGRINDING THE FIRE FIGHTING SYSTEM AT MARSA EL HARIGA
TERMINAL TOBROUK FOR ARABIN GULF OIL COMPANY
TOW PUMP STATIONS & ABOVE GROUND INASTALLATION OF
PIPE LINES 8" – 12" – 20" – 24" EPOXY AND CEMENT LINE
ERECTION OF WATER OAIE CAPACTTY 3770M3. NDT DOCUMENTATION
CONTROL WITH SUPERVISION & TESTING OF ALL
WELDERS & DIMENTIONAL CHEKING LEVELING . HYDROSTATIC
& MECHANICAL TESTING & MPI SCANNING & INTERPRETATIC
OF FILM. D.P.T. REVIEWED ALL WELDING AND SAFETY OFFICER
PREPARATION OF THE HOT WORK PERMIT, Quality documentation,
3- SARIR AREA
INSTALLATION & WELDING OF GAS PIPE LINE 8" X 5.5.MM (91
KM) – RT INTERPRETATION FILM WELDER PERFORMANCE – UT
PT. MT. INSPECTION., Quality documentation,
4- AZAAWIA TERMINAL :
PREFABRAICATION & INSTALLATION OF TANK FARM REVIEWING
THE WELDING PROCEDURE – NDT INSPECTION – WELDMENT
VISUAL INSPECTION ., Quality documentation,
1/9/1982- 30/3/1991 ITALIAN INSTITUTE OF DON BOSCO
CAIRO – EGYPT WELDING INSTRUCTOR
PROFESSIONAL COURSES OF WELDING WITH ALL POSITIONS &
QUALIFICATION OF WELDERS & MECHANICAL TRADES VISUAL
INSPECTION COURSES
1/5/1982- 30/8/1982 FACCO COMPANY
FAYOUM - EGYPT SITE ENGINEER
PROJECT ACTIVITIES
PREFABRICATION & INSTALLATION OF POULTRY HANGER
CONNECTION OF ALL ELECTRICAL SYSTEM AUTOMATIC &
MANUAL CONTROL.
1/2/1982-30/4/1982 FOCHI COMPANY
HELWAN – CAIRO INSPECTION CONTROLLER
EGYPT PROJECT ACTIVITIES
INSTALLATION OF NEW PIPELINES LAYING IN SIDE THE CEMENT
FACTORY IN HELWAN – CAIRO. REVIEW & RECORDING OF ALL
DAILY PROGRESS OF WORKS PLANNING OF MAN POWER
REQUIREMENTS EQUIPMENT FOR PROJECT DURATION
15/9/1978- 15/12/1981 MONTUBI COMPANI
RAS GHAREB ASS. WELDING INSPECTOR
KANTARAH SHARK PROJECT ACTIVITIES
ABU REDES –RED SEA PREFABRICATION & INSTALLATION & WELDING OIL
PLATFORMS WITH DIFFERENT SIZE ( 24" -30" -36") &
LENGTHS (20 – 64M) & THICKNESS ( 25 -30 – 36 MM )
THREE – FOUR – SIX LEGS ) WITH CELLAR DECK . MAIN
DECK & HELLY DECH. INSTALLATION OF NEW PIPE LINES
8"-10" ONSHORE/OFFSHORE SUPERVISION & TESTING OF
ALL WELDERS AND THE DAILY ACTIVITIES OF ALL PROGRES
MECHANICAL TESTING M.P.I. & D.P.T. RADIOGRAPHIC
INTERPRETATION & WELDMENT VISUAL INSPECTION
REVIEWING THE WELDING PROCEDURES
1/2/1978- 30/8/1978 MONTUBI COMPANY
NIGERIA- KADOUNA ASS.WELDING INSPECTOR
WARRI PROJECT ACTIVITIES:
PORT- HARCOURT INSTALLATION OF NEW PIPE LINE 600 KM x 10”X 12 M/M
FROM WARRI TO NIGER – KADUNA.
SUPERVISION & TESTING OF ALL WELDERS AND THE DAILY
ACTIVITIES OF ALL PROGRES, MECHANICAL TESTING
MPI.-DPT-RT-UT-, RADIOGRAPHIC INTERPRETATION
REVIEWING THE WELDING PROCEDURES
WELDMENT VISUAL INSPECTION, Quality documentation,
1/1/1976- 25/6/1977 C.I.M.I. COMPANY
SUEZ WELDING COTROLER
ELEIN- SOUKHNA PROJECT ACTIVITIES:
EGYPT INST.& FABRIC. OF NEW Floating roof TANK FARM.
TWELVE CRUD OIL TANKS – CAPACTY 120.000 T,
AND ONE WATER NK- CAPACITY 4000 M3.
INSTALLATION OF UNDERGROUND PIPES FROM 8 TO
36" PREFABRACTION OF PIPE/STEEL SUPPORTS AND
BRAKETS PUMP STATIONS AND ABOVE GROUND
INSTALLATION INVOLVING NUMERUS TYPES OF
WELDING PROGRESSES ALL POSITIONS
WELDMENT VISUAL INSPECTION, Quality documentation,
1/2/1974- 1/11/1975 CAIRO SHERATON HOTEL
CAIRO – EGYPT ASS. ELECT. ENGINEER
WORKING IN ENGINEERING DEPARTMENT TO
CONTROL AND SUPERVISE ALL THE ELECTRIC INSTRUMENTS
IN THE HOTEL .AIR- CONDITION LIGHTS.
REFRIGERATORS. HEATERS. LIGHT SYSTEM. TELECOMAND. ETC
YOUR FAITHFULLY
GIORGIO KRENN