Post Job Free
Sign in

Construction Supervisor

Location:
Fort Novosel, AL, 36362
Posted:
November 04, 2024

Contact this candidate

Resume:

TERESA LUNA

QUALITY ASSURANCE REP

YEARS OF EXPERIENCE

** *****

EDUCATION

Webster University Associate of Science Business Management

CERTIFICATIONS

QCS/RMS 40 Hour Training

QCS/RMS 16 Hour Training Update

OSHA 30 Hour Construction Training

OSHA 24 Hour Crane Safety Class Training

\

QUALIFICATIONS SUMMARY

Ms. Luna’s quality control management and customer relation skills allows her to interact with clients on all levels. She shows exceptional employee management skills, maintaining a courteous and professional attitude with the fellow team members and the customer. Ms. Luna has over 18 years in quality control and is a dedicated professional.

PROFESSIONAL EXPERIENCE

ARGO SYSTEMS LLC- 2023--2024

SARASOTA NATIONAL CEMETERY

2021: Lake City VA CT Scan and Radiology Renovations

2021: Lake Baldwin VA- Specialty Clinic Renovation

ARGO SYSTEMS LLC-VA Sarasota National Cemetery Expansion

2022-Present

ARGO SYSTEMS LLC - USACE - AECOM

ARGO SYSTEMS LLC – NAVFAC – 4th Floor Renovation to VA hospital -NAS JAX base Jacksonville Fl.

Hanger Renovation - Renovation of Two Air Craft Hangers

ARGO SYSTEMS LLC – NAVFAC – SOF Boat Dock Repairs – Key West, Florida Quality Control Manager. Constructed Latrine, Removed and Replaced Boat Docks Installed Boat Wash Station

RM WILLIAMS CONSTRUCTION – RAC SCS2 – Tampa Airport Quality Control manager for Hertz Rental Car Building. Built to service 40 cars complete with oil separators, installed on site FUEL tanks and poured 3,000 yards of concrete.

NORTHWIND ENGINEERING – Army Reserve Center Dothan Alabama –

Complete restoration of Office Building. Complete Restoration

HAYWARD BAKER – Lake Okeechobee HHD, Was a part of Building 34 miles of Cutoff wall along the Pahokee side of Lake Okeechobee complete with Concrete Batch Plant, daily concrete testing and submitting test results.

AMERICAN BRIDGE – South Florida Water Management S65 Tailwater Structure Project. Was a part of Building two Tailwater structures on the

Kissimmee River. Over 1 million yards of Concrete was poured. The new S65E Tailwater weir on the Kissimmee River north of Lake Okeechobee (the largest single water control structure the District has ever built) was completed about two weeks before Tropical Storm Fay swept into South Florida.

QUINN CONSTRUCTION – Jacksonville USACE – Kissimmee River

2066 CR 408 Elba, Alabama 36323 863-***-**** *********@*******.***

Restoration Project. Backfill 7 Miles of the Kissimmee River, Build a Temp Bridge for end dumps to cross river water, Turbidity Testing daily. Vicksburg USACE Tate County Riser Pipers. Turbidity Testing Daily State Of Mississippi Bridge Rehab and Bank Stabilization.

PROJECT EXPERIENCE

ARGO SYSTEMS LLC-VA Sarasota National Cemetery Expansion

2022-Present

ARGO SYSTEMS LLC - USACE - AECOM

ARGO SYSTEMS LLC – NAVFAC – 4th Floor Renovation to VA hospital -NAS JAX base Jacksonville Fl.

Hanger Renovation - Renovation of Two Air Craft Hangers

ARGO SYSTEMS LLC – NAVFAC – SOF Boat Dock Repairs – Key West, Florida Quality Control Manager. Constructed Latrine, Removed and Replaced Boat Docks Installed Boat Wash Station

RM WILLIAMS CONSTRUCTION – RAC SCS2 – Tampa Airport Quality Control manager for Hertz Rental Car Building. Built to service 40 cars complete with oil separators, installed on site FUEL tanks and poured 3,000 yards of concrete.

NORTHWIND ENGINEERING – Army Reserve Center Dothan Alabama –

Complete restoration of Office Building. Complete Restoration

HAYWARD BAKER – Lake Okeechobee HHD, Was a part of Building 34 miles of Cutoff wall along the Pahokee side of Lake Okeechobee complete with Concrete Batch Plant, daily concrete testing and submitting test results.

AMERICAN BRIDGE – South Florida Water Management S65 Tailwater Structure Project. Was a part of Building two Tailwater structures on the

Kissimmee River. Over 1 million yards of Concrete was poured. The new S65E Tailwater weir on the Kissimmee River north of Lake Okeechobee (the largest single water control structure the District has ever built) was completed about two weeks before Tropical Storm Fay swept into South Florida.

QUINN CONSTRUCTION – Jacksonville USACE – Kissimmee River

2066 CR 408 Elba, Alabama 36323 863-***-**** *********@*******.***

Restoration Project. Backfill 7 Miles of the Kissimmee River, Build a Temp Bridge for end dumps to cross river water, Turbidity Testing daily. Vicksburg USACE Tate County Riser Pipers. Turbidity Testing Daily State Of Mississippi Bridge Rehab and Bank Stabilization.

PROJECT EXPERIENCE



Contact this candidate