Tech *: Curriculum Vitae
Coastal Cities Sustainable Environment Project – Dong Hoi subproject
Construction supervision for Component 1 and 2
Sang Wook Kim (Michael)
Team Leader
- 1 -
FORM TECH-6
CURRICULUM VITAE (CV)
Position Title and No. K1, TEAM LEADER
Name of Expert: Sang Wook Kim, PE, REA
Date of Birth: November 6, 1953
Citizenship: USA
Education:
• M.S in Civil/Sanitary Engineering, California State University, Los Angeles, CA, USA, 1986
• B.S in Civil Engineering, Hanyang University, Seoul, Korea, 1979
• Hazardous waste collection and treatment - UCLA, USA, 1993
• Construction Management extended course at UC Irvine, CA, USA, 2001 Employment record relevant to the assignment:
Period Employing organization and your
title/position. Contact inform for
references
Country Summary of activities
performed relevant to the
Assignment
2021-
Present
Royal Haskoning DHV
Project Team Leader
Vietnam
International
Project Team Leader; Chief
Resident Engineer,Infrastructure
Expert, CS and Procuremrnt
Specialist
2013-2021 Exp International Services Inc.
Project Team Leader
Vietnam,
International
Project Team Leader; Chief
Resident Engineer, Senior
Water/Wastewater Expert,
Procurement Specialist
2009-2012 Hankuk Engineering Consultants.,
Korea
Vietnam,
Korea,
International
Executive Vice President/ Project
Manager
2000-2008 KS Tech Group Inc. (Consulting
Engineers), Torrance, CA
USA,
Mexico,
Nicargua
Engineering Partner
1996-1999 Montgomery Watson, USA and
Hong Kong
USA,
Hong Kong,
Project Manager and Principal
Engineer
1989-1995 KS Tech Group Inc. (Consulting
Engineers), Torrance, CA
USA Principal Engineer
1986-1988 J. M. Montgomery Consulting
Engineers, Pasadena, CA
USA Project Design Engineer
1982-1985 Lee and Ro Inc. (Consulting
Engineers), Pasadena, CA
USA Project Engineer/Design Engineer
1979-1981 Korea Engineering Consultants Corp.,
Seoul, Korea
Korea Design/Associate Project
Engineer
Membership in Professional Associations and Publications:
• Registered Professional Engineer (PE), Civil Engineering, CA, USA, 1984
• Registered Environmental Assessor (REA), CA Environmental Protection Agency, CA, USA, 1990
• Registered Professional Engineer (PE), Water Supply and Sewerage, Korea, 1992
• Member of American Society of Civil Engineers (ASCE)
• Member of American Water Works Association (AWWA)
• Member of Korean Water and Wastewater Works Association
• Member of Water Quality Management District in CA, USA Language Skills (indicate only languages in which you can work): Language Reading Speaking Writing
Korean Mother tongue
English excellent excellent excellent
Tech 6: Curriculum Vitae
Coastal Cities Sustainable Environment Project – Dong Hoi subproject Construction supervision for Component 1 and 2
Sang Wook Kim (Michael)
Team Leader
- 2 -
Adequacy for the Assignment:
Detailed Tasks
Assigned
Reference to Prior Work/Assignments that Best Illustrates Capability to Handle the Assigned Tasks
As TOR
Name of assignment or project: Coastal Cities Sustainable Environment Project-Dong Hoi City Sub-Project in Quang Binh province-funded by the World Bank and ADB Year: 03/2021-02/2023
Location: Phu Ly City in Ha Nam Province, Vietnam
Client: Phu Ly City, People of Committee
Main project features: The Project includes Detail design of expanding and renovation of WWTP, Management of construction supervision for the construction of drainage, sewer and tertiary pipe, and other investment items to serve residential area and urban area in Dong Hoi city.
-Construction supervision of 06 sewage pipelines in the city, including pipelines No. 6, 7, 8, 9, 10, 19 and 20. Diameter of pipe is D600, D800, D1000, and D1500 and 2mx2m
-concreter box culvert
- Embanking and dredging downstream of Cau Rao river, improving drainage capacity of Cong Muoi bridge-installation of 50m long square type precast concrete piles(each 2x25m long-square precast concrete pile tied with field steel welding)_
- Procurement of equipment for wastewater collection and pumping station (pumping stations, 15,16,17,18,19) and for SCADA systems and aerators with solar energy for the upgrading of Duc Ninh WWTP.
Positions held: Team Leader/ Chief Resident Engineer Activities performed:
Review of FS report and prepare basic/detailed design for the upgrading Duc Ni nh WWTP and Project ESIA and EMP
Contract management and construction supervision
Overall general and financial management of the project; liaison with Client, oth er organizations in the province and World Bank; responsible for ensuring that a ll reports and other outputs are delivered to
the Client according to the agreed time schedule.
Bidding support
Name of assignment or project: Phu Ly City Subproject of Medium Cities Development Project in Ha Nam Province –funded by the World Bank Year: 04/2020-12/2021
Location: Phu Ly City in Ha Nam Province, Vietnam
Client: Phu Ly City, People of Committee
Main project features: The Project includes investment items to serve residential area and urban area in Phu Ly city. These are: -construction of Phu Van commune Kindergarten and Tran Quoc Toan Primary School,
-Upgrading the residential infrastructures for the Northen of Quang Trung Ward, Duromg Am and Quynh Chan residential group and Lam Ha ward: Completed in January, 2021
-Construction and upgrading the drainage system and technical infrastructure of Bien Hoa road-Completed in January, 2021
-Construction of Lam Ha Lake: Bidding process
-Construction of the Southern Embankment: Commenced the construction
-Repairing and upgrading Tran Hung Dao road : Bidding process Positions held: Team Leader/ Chief Resident Engineer Activities performed:
Review of FS report, basic design and detailed design, and Project ESIA and E MP
Contract management and construction supervision
Overall general and financial management of the project; liaison with Client, oth er organizations in the province and World Bank; responsible for ensuring that a ll reports and other outputs are delivered to
the Client according to the agreed time schedule.
Bidding support
Tech 6: Curriculum Vitae
Coastal Cities Sustainable Environment Project – Dong Hoi subproject Construction supervision for Component 1 and 2
Sang Wook Kim (Michael)
Team Leader
- 3 -
Name of assignment or project: CSOI: Improved Operations and Management of Service Providers and Institutional and Regulatory Reform consultancy service contract matters –funded by the ADB
Year: 02/2020-05/2020 (3 months performed of 6 months assigned)
- due to Covid19 evacuation))
Location: Ulaanbaatar city and Ger areas, Mongolia Client: Ulaanbaatar Development Project Office, Mongolia Main project features: Review the current water supply hearing system included in Tariff structure and upgrading to be Smart water system, Study for the improvement of solid waste and night soil collection system.
Positions held: Team Leader
Activities performed:
Review all related documents and PMU procurement support
Overall general management of the project study related 7 stack holders; liaison with Client, other organizations in the City and Central GOV. responsible for e nsuring that all reports and other outputs are delivered to the Client according t o the agreed time schedule.
Sets up and review O&M manual and the supervision organization and manage s the whole team
Name of project: Name of assignment or project: Construction Management and Supervision in Tay Ninh. Project: Greater Mekong Sub-region (GMS) Corridor Towns Development Project -funded by ADB
Year: 06/2017-01/2020 (15 months completed)
Location: Moc Bai Town, Tay Ninh Province, Vietnam Client: Tay Ninh GMS PMU
Main project features: Project includes:
1. Moc Bai Water Supply (WS): (a)expansion of network of water pipelines and establishment water treatment plant with capacity up to 7,000 cubic meters per day; and (b) installation of water connections for household and commercial users. 2. Moc Bai Urban Roads (UR): (a) improvement and widening of around 13 km of urban roads within the town center; and (b) construction of drainage structures, median road, walkways, installation of lighting facilities, and planting of trees. 3. Moc Bai Wastewater Treatment (WWT): (a) establishment of waste water treatment plant with capacity up to 9,000 cubic meters per day; and (b) installation of wastewater drainage system, booster pump station and wastewater transmission pipelines. 4. Moc Bai Materials Recovery Facility (MRF): building a MRF at the existing dumpsite, Thanh Duc commune, Go Dau district, Tay Ninh province. Total project investment: U$$ 35,000,000
Positions held: Team Leader/ Chief Resident Engineer Activities performed: Responsible for the overall management and delivery of the tasks of the Consultant team. The expert will report to the Client and will work in close cooperation with the PMSCD Consultants. The main tasks of the Team Leader will be as follows: -
Manage and coordinate overall consulting service inputs in close cooperation with the Client and the PMSCD Consultants;
Advise the PMU regarding arrangements for effective construction supervision and Contract management of all Subprojects; and on proper procedures, regulations and norms to achieve quality construction;
Prepare detailed time bound implementation schedules, work plans, and financial plans for the construction supervision team; prepare and ensure timely submission of regular progress reports of construction activities for all Subprojects, and advise on actions to Tech 6: Curriculum Vitae
Coastal Cities Sustainable Environment Project – Dong Hoi subproject Construction supervision for Component 1 and 2
Sang Wook Kim (Michael)
Team Leader
- 4 -
be taken in case of adverse variances against implementation plans; consolidate progress reports into semi-annual progress reports of all construction activities; Ensure supervision of Contractor’s arrangements for material testing laboratory prior to the beginning of construction activities; make appropriate plans and ensure coordination of the construction supervision activities including all necessary testing and quality control activities;
Prepare a quality control program for all construction activities for each Subproject/Contract including required field and laboratory testing and make necessary arrangements to ensure proper maintenance of all quality control records of laboratory and field tests;
Review weekly, monthly and quarterly reports prepared by the Field Inspectors and key National Experts on progress of work and advise on action that may be needed by the team, the Contractors and theClient;
Provide on-the-job training to staff of the PMU in Contract management and construction supervision, Ensure supervision of all sampling, testing and commissioning of Subproject facilities and equipment; ensure strict supervision of the Contractors’ work schedule and method statement; equipment and plant schedule; site organization and personnel deployment plan; plan for establishment of construction camp; and any other plan or schedule that may be required from the Contractor in the execution of the work; and ensure compliance with all Project requirements and specifications as well as applicable norms and regulations.
Name of assignment or project: Construction and Rehabilitation drainage system Sub-project in Bim Son Town, Thanh Hoa Province – funded by the World Bank Year: 04/2013-10/2016 (12 months completed-started 06/2014 as replacement of TL) Location: Bim Son Town, Thanh Hoa Province, Vietnam Client: Bim Son Town Construction Investment PMU
Main project features: The project areas will cover in 8 wards/communes of the Bim Son town: Ngoc Trao, Ba Dinh, Bac Son, Dong Son, Phu Son, Lam Son, Quang Trung and Ha Lan. The system will include drainage and sewerage sewers, storm-water CSOs, outlets, pressure sewer lines for wastewater transmission, wastewater pumping stations and wastewater treatment plant. The tertiary system for household connection to the drainage system of the town is invested to serve 42,712 people from 2016. Positions held: Team Leader/ Chief Resident Engineer Activities performed:
Contract management, construction supervision and PMU procurement support
Overall general and financial management of the project; liaison with Client, oth er organizations in the province and World Bank; responsible for ensuring that a ll reports and other outputs are delivered to the Client according to the agreed time schedule.
Sets up the supervision organization and manages the whole team. Deals with Client, local authorities, and communities. Sets up QA and QC procedures for t o ensure the quality of supervision works.
Overall direction of the construction supervision works, reports and other output. Name of the Project: Improvement and Expansion Water Supply System in Da Lat City – WB Fund Year: 08/2012-04/2013 (6 months completed)
Location: Da Lat city, Lam Dong Province, Vietnam
Client: LAWACO PMU
Main project features: The project is to ensure the 100% of urban population has access to water supply services of 100-120 lpcd at the target year of 2015. Project consist of Pipe network level I: D400-800 DIP- L=35,000m, pipe network level II: D150-300mm, HDPE-L=16,000m and booster pumping stations with 7- service reservoirs. 12,000 household connections, operation building, SCADA management system and water meter to control NRW, and 13,500 household connections Positions held: Project Team Leader
Activities performed:
Overall general and financial management of the project; liaison with Client, other organizations in the province and World Bank; responsible for ensuring that all reports and other outputs are delivered to the Tech 6: Curriculum Vitae
Coastal Cities Sustainable Environment Project – Dong Hoi subproject Construction supervision for Component 1 and 2
Sang Wook Kim (Michael)
Team Leader
- 5 -
Client according to the agreed time schedule.
Sets up the design organization and manages the whole team. Deals with Client, local authorities, and communities. Sets up QA and QC procedures for to ensure the quality of preparation work.
Overall direction of the design, cost estimates, bidding document, reports and other output. Name of the Project: My Phuoc Urban Industry Water Supply Sub-Project – WB Fund Year: 03/2012-01/2013 (4 months completed)
Location: My Phuoc 3 Urban Industrial Zone, Binh Duong Province, Vietnam Client: BIWASE
Main project features: Improving the water supply capacity, its quality and reliability of the water system in My Phuoc 3, Urban industry zone and meeting the demand on clean water until year 2020. The project is included –intake work and raw water pumping system near at the Dong Nai river – raw water conveying pipe line, D=1,000mm-L=4,493 m; new WTP, Q=30,000m3/day, transmission lines, D=800 mm-L=7,000m, D=600 mm-L=13,900m, D=400mm-L=7,900m and 3 service reservoirs, 13,500 household connections. Positions held: Project Team Leader
Activities performed:
Overall general and financial management of the project; liaison with Client, other organizations in the province and World Bank; responsible for ensuring that all reports and other outputs are delivered to the Client according to the agreed time schedule.
Sets up the design organization and manages the whole team. Deals with Client, local authorities, and communities. Sets up QA and QC procedures for to ensure the quality of preparation work.
Overall direction of the design, cost estimates, bidding document, reports and other output. Name of the Project: Ben Luc Water Supply Project - Kobleco, PPP Fund of JICA ODA Year: 09/2011-01/2012(4 months)
Location: Long An Province, Vietnam
Client: Kobelco, Japan
Main project features: The objective of this project is to provide matching both the domestic/residential water demand and industrial water consumption at PAT industrial complex in the Long An Province. This project involves two raw water intake pumping stations at Vam Co River and at raw water reservoir, 1200 mm raw water conveying, 50,000 m3/day water treatment plant, and treated water transmission line. Positions held: Sr. Water Treatment and Procurement Specialist Activities performed: Basic design with solution method for de-saline raw water at the Vam Co river, detailed design, cost estimates, preparation bid documents and procurement support Name of the Project: Hoa Khanh Tay Water Supply Project – ODA EDCF Fund Year: 09/2010-02/2012(16 months)
Location: Long An Province, Vietnam
Client: PMV and PPC of Long An Province.
Main project features: The main objective of this project is to improve and conserve the natural and aquatic environment of the domestic and industrial complex in the Province, which in turn is expected to contribute to uplifting the living standards of the local residents as well as to increase the investment potential of the project area. This project involves the irrigation canal and raw water conveying canal, Q=40,000m3/day Water Treatment Plant, and over 40 km main water distribution pipeline included street improvements. Positions held: Project Manager
Activities performed: Project basic design, detailed design, cost estimates, procurement plan and bidding documents, bid evaluation, and assist construction supervision Name of assignment or project: Rehabilitation of Water Distribution Pipelines Year: 2006-2007 (8 months)
Location: Long Beach, CA, USA
Client: Long Beach Water Department
Main project features: Rehabilitation of main water distribution lines at 4-central districts and the project included the replacement of valves; 36”(900mm) to 72”(1,800mm) valves and multi-48”(1,000mm) distribution lines. The object of project was to provide sufficient water to the new development area Positions held: Team leader
Activities performed:
Supervise and lead the construction supervision team
Preparation of construction supervision procedure and manual Tender assistance and procurement support
Name of the Project: Rehabilitation of wastewater/sewerage system for the Culver City, CA Year: 2006
Location: Culver City, CA, USA
Client: Sewerage Department in the Culver City, CA, USA Tech 6: Curriculum Vitae
Coastal Cities Sustainable Environment Project – Dong Hoi subproject Construction supervision for Component 1 and 2
Sang Wook Kim (Michael)
Team Leader
- 6 -
Main project features:
Assessment and review of existing force main with five sewage pumping stations in the Culver City and of the review existing water pipe system in the city of Lompoc, CA association with the Utility Science and Software, San Diego, CA
Pre and post evaluate project monitoring, assessment of hydraulic performance and capacity analysis included VCP sewer and storm drainage lines.
Positions held: Team Leader/ Sr. Water Treatment Specialist Activities performed: Field investigation of (E)sewer system, design and preparation of technical specification for the rehabilitation of sewage pumping system (force main) included Construction Supervision Services.
Name of the Project: Rehabilitation of water distribution system and sewerage system, the City of Lompoc Year: 2006
Location: City of Lompoc, CA, USA
Client: Water and Sewerage Department in the City of Lompoc Main project features:
Upgrading fire protection using Insurance Services Office Method (ISOM) applied to classification 1 to 5 associate with USS&S. for existing distribution system
Rehabilitation of main water distribution lines including pipe lines, D= 300-700 mm, L=34km included 2- service reservoir tanks included VCP sewer and storm drainage lines. Positions held: Team Leader
Activities performed: Organizing, management of detailed design, cost estimates and bidding document, and construction supervision
Name of the Project: Thu Duc Water Treatment Plant for Hyundai Movis Year: 2006-2007
Location: Ho Chi Minh, Vietnam
Client: SAWACO/Thu Duc BOO Company
Main project features: The objective of this project is to improve and extend treated water capacity, Q=320,000m3/day of EPC project of Hyundai Engineering for Ho Chi Minh City in Vietnam Positions held: Sr. Water Treatment Specialist
Activities performed: Supervise detailed design and prepared Bid document with technical specifications Name of assignment or project: Rehabilitation of Alvarado Water Treatment Plant, Phase III Year: 2005-2006
Location: San Diego, CA, USA
Client: San Diego Public Works
Main project features: Rehabilitation and expanding two flocculation and sedimentations basins and install 48” (1800mm) venture meter with 48”-84” transmission pipelines Positions held: Principal Engineer
Activities performed: Supervise detailed design, cost estimates and bidding document, and construction management
Name of the Project: Rehabilitation and Upgrading of Wastewater Treatment Plant Year: 2003-2005
Location: Victovile WWTP, Victorvile, CA, USA
Client: Victorvile Sanitation District, USA
Main project features: The project included distribution box, 2-primary sedimentation basins, sludge pump stations, and digestion tanks.
Positions held: Associate Project Manager
Activities performed:
Review of additional wastewater treatment process with digestion tanks
Supervise and lead the construction supervision team
Preparation of construction supervision procedure and manual Tender assistance and procurement support
Name of the Project: Improvement of Water Supply and Drainage System at Arrow Twins Oak Resort and Blue Sky Country Resort
Year: 2003-2005
Location: Riverside County,CA, USA
Client: Arrowhead Golf Resort and the County of Public Works, Riverside County, CA, USA Main project features: Rehabilitation of water supply, sewerage, and storm drainage system: water main and sewer system including 14” force main with 2-lift stations and storm water retention basins with drainage pump stations
Positions held: Project Manager/ Sr. Water Treatment Specialist Tech 6: Curriculum Vitae
Coastal Cities Sustainable Environment Project – Dong Hoi subproject Construction supervision for Component 1 and 2
Sang Wook Kim (Michael)
Team Leader
- 7 -
Activities performed: Lead detailed design, cost estimates and bidding document Name of the Project: Improvement Water Supply and Sewerage System in Retreat Golf and Resorts in Corona and San Diego, CA
Year: 2003-2005
Location: Corona and San Diego, CA, USA
Client: Retreat Golf Resort, LLC and the County of San Diego, CA Main project features:
Main water distribution and sewerage system design for 1,980 residential area included in Resort Hotel and 36-holes-Retreat Golf Courses
Rehabilitation of portable and gray water distribution system included 24” (600 mm): main water transmission line with 2-booster pump stations, 2- service reservoir tanks, and washed wastewater treatment system.
Positions held: Project Manager/ Sr. Water Treatment Specialist Activities performed: Review existing system, Detailed Design and Cost Estimates Name of the Project: Water Supply Improvement and Industrial Wastewater Treatment for TUSA-UH Industrial Complex
Year: 2004
Location: TUSA-UH Industrial, Complex, Morelia, Mexico Client: TUSA, Inc.
Main project features: The project included: -
-Water treatment facilities, Q=280,000 GPD with 2-service reservoir tanks, 2-35,000 gallons and developed underground water resources for the industrial water supply with purification system
-Sewerage collection, storm drainage collection, SBR industrial wastewater treatment system, Q=1,500 m3/day, service over 280 ha.
Positions held: Team Leader / Project Manager/ Sr. Water Treatment Specialist Activities performed: Planning and preparation of detailed design, cost estimates and bidding document
(include construction management).
Name of the Project: Construction supervision for Rehabilitation and Upgrading of Wastewater Treatment Plant,
Year: 2003-2005
Location: Victovile WWTP, Victorvile, CA, USA
Client: Victovile Sanitation District, USA
Main project features: The project included distribution box, 2-primary sedimentation basins, sludge pump stations,
and digestion tanks.
Positions held: Associate Project Manager
Activities performed: (i) Review of additional wastewater treatment process with digestion tanks; (ii) Supervise and
lead the construction supervision team; (iii) Preparation of construction supervision procedure and manual;
(iv) Tender
assistance and procurement support; (v) Field supervision, inspection and evaluation. Name of the Project: Construction supervision for Crossfield Taxiway Project Year: 2003-2004
Location: Los Angeles International Airport, Los Angeles, CA. USA Client: City of Los Angeles
Main project features: The project included expansion taxiway with apron, service road, storm drain, and installation
of GSE lines and ballast
Positions held: Team Leader/ civil work of taxiway, service road and storm drainage Activities performed: (i) Review of taxiway and service road plan, strom dain and infra structure for electrical conduit
lines of gse and ballast; (ii) Supervise and lead the construction supervision team; (iii) Preparation of construction
supervision procedure and manual; (iv) Tender assistance and procurement support; (v) Field supervision, inspection,and evaluation.
Name of assigned project:- Design and Construction Supervision for Expansion of WTP and Water Transfer Facilities for the New Territory, Hong Kong Wonju Regional Water Supply Project, Korea
Year: 1998-2000
Location: Hong Kong, Korea and USA
Main project features: -Hong Kong: Expansion of Tai Po WTP, 250,000m3 < Service reservoir at hill site, Tech 6: Curriculum Vitae
Coastal Cities Sustainable Environment Project – Dong Hoi subproject Construction supervision for Component 1 and 2
Sang Wook Kim (Michael)
Team Leader
- 8 -
41,000m3, 97m PD< Stream crossing<Pumping station, D=800mm, L-=2.5 km<Portal site, water tunnel, gravity flow, D=3,000mm, L=17km,(TBM)<< Northeastern, New territories, 25m PD Korea-Detailed design for WTP, Q=200,000 m3/day included DAF process Positions held: Principal Engineer/TL (International Water Supply and Sanitation) Activities performed: Planning and preparation of detailed design, technical specifications and bidding document.
Other Projects :
- Polonia Pass Water Treatment Plant (Montgomery Watson)
- Rehabilitation of South Water Reclamation Facility and Aeration System Improvement Project
(Montgomery Watson)
- Castaic Water Supply Project, (JM)
- Rehabilitation and Expansion of Solano Water Treatment System (J Montgomery)
- Rehabilitation of Primary Sedimentation Basins D&E and F&G, Orange County Sanitation District, Fountain Valley, CA (Lee&Ro)
- Renovation Grit Chamber and Lift Station, OCSD, CA (L&R)
- Numerous Military Infrastructure and Public Works Projects in Nevada and California (Lee&Ro) Location: CA, Nevada in USA
Client: Government agencies and Private parties
Positions held: Project Engineer
Activities performed: Planning and preparation of detailed design, cost estimates and bidding document. Expert’s contact information: Phone:
Certification: I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my qualifications, and my experience, and I am available, as and when necessary, to undertake the assignment in case of an award. I understand that any misstatement or misrepresentation described herein may lead to my disqualification or dismissal by the Client, and/or sanctions by the Bank. Sang Wook Kim (Michael)
Date: November 12, 2022